Principal Engineer
CurrentSupervisory role in developing Long Term Financial Plans for Hydro and Gas Generation PlantsReview and Approval of Threats to Generation and Action Item Tracking Assignment of Engineering and Maintenance resources for projects, outages, and emergent needs at Zeeland (natural gas combine cycle) and Ludington (hydro) plantsStaff Engineer for Ludington and Zeeland generating plantsDevelopment of metrics for performance measures of the engineering and operations teams Additional responsibilities included support for problem solving teams at both Ludington, Zeeland, and Campbell Plants. Other duties include development of new projects in both gas storage and electric generation, development of proposals in rehabilitation of hydro-electric projects, and RCA lead for both gas and electric generation Notable achievements:Lead RCA for hydro-turbine pumping instability and implemented solutionResolved the issue of methane gas ignition at a compressor station due to standing water in a vent stacksResolved issue with premature engine failure at White Pigeon Gas compression on newly rebuilt enginesLead RCA for thrust bearing failure at Ludington Pump storage PlantLead Team for Ludington governor interim fix and total replacementLead Team for cost saving of reagents at Campbell Generating ComplexSupported problem solving team for stack damper issue at Zeeland Combined cycle