Plant Manager
CurrentSweetened Condensed Milk • Set up & start up, design & planning new factory for sweetened condensed milk • Project / construction management & coordination (civil work, room partition, M&E, ventilation & AHU system, utility, fabricate mezzanine floor)• New machine moving, positioning & installation (include mechanical install, wiring, circuit diagram, PLC install) • New machine testing – water test, IO test, IQ, OQ, PQ• New machine passivation, X-ray inspection and CIP cleaning• Machine trial run / machine test run (dry run, wet run)• Establish & create machine commissioning protocol & trial run protocol• Product trial run • Liaise with government body – DOSH (apply certificate for hoist machinery & natural gas), DOE (apply chimney) & MITI (Covid-19)• Monitoring / manage factory activity (production, QA/QC, maintenance, warehouse, supply chain, utility, manpower, product quality & food safety) • Create & establish SOP for production, machine startup, preventive maintenance schedule, inspection criteria, quality plan, CCP points, equipment calibration list• Identify & establish critical spare parts list Ghee, Ghee Blend, Waffle Powder & Dry Sachet • Monitoring / manage factory activity (production, QA/QC, maintenance, warehouse, supply chain, utility, manpower, product quality & food safety) • ISO 22000 & HACCP & GMP certification • Internal non-conformance • Internal & external audit• Management review meeting• Continuous improvement• Automation packing for waffle powder• Establish new brands of ghee – Artwork design, packaging design• Factory modified for adding new product• Establish new product – ghee blend (R&D, artwork design, packaging and raw material)• Purchase, design, modified machine for ghee blend• Design new packaging for ghee blend – cans form and sachet form• Purchase & install vertical form fill seal machine for ghee blend sachet• Vertical form fill seal machine testing and running• Trial run for ghee blend