Mark is a Technical Director specialising with Bridges and the Transport Services group. Mark has a long career in Bridge Engineering at Roads and Maritime Services, NSW. He has over 35 years’ experience in the design and construction of bridges and related structures. For the last 15 years he held the position of Senior Bridge Engineer, New Design where he led or project managed teams undertaking the concept development, detail design, proof checking and review of bridge designs.Mark has worked on a wide range of bridge types. He was on the design team for the Anzac Bridge. Other notable design projects include the Woronora River Bridge and the Alfords Point Bridge. In recent years he has worked on large number of pedestrian and shared path bridges. He undertook the peer reviews of bridge designs on the M7 and the Hunter Expressway Alliance and worked on the proof checking of the design and construction engineering of the Batam Tonton Bridge in Indonesia.At Aurecon, Mark has been involved in the design of the match cast segmental bridges at St Peters Interchange and the new Grafton Bridge and carried out the IC role on several major projects.
Listed skills include Bridge Design, Steel Structures, Structural Analysis, Bridge, and 19 others.