Engineer Civil (Erection)
Sreepur 163 Mw Hfo Based Power Plant Gazipur.
1) Steel Column, Steel Beam, Rafter, Bracing, Roof & Side Purlin, Roof Sheeting, Sound Proof Wall Sheeting, Rain Water Gutter, Rain Water Down Upvc Pipe, Roof Monitor Louver Installation & Erection Work of Engine Hall Pre-Fabricated Steel Structure. Total Fabrication Weight 600 Ton. Building Size: (Length= 84.0 m, Width= 43.0 m, Height= 16.0 m)2) Engine Maintenance Platform for Engine Two Side Platform With Stair & EL.+1.5 M Platform & EL.+3.850 M Platform with Walkway Steel Grating & Stair Step Grating Installation & Erection Work. Total Fabrication Weight 80.0 Ton3) Heavy Equipment of Booster Module Platform, Pre-Heater Pump Platform, Lube Oil Module Platform, Turbo Charger Platform, HFO Module Platform & Module Maintenance Walkway Platform with steel stair & Steel Gratings Installation & Erection work.4) 9 nos Heavy Equipment (Silence) Platform Beam & Bracing Moment & Shear Plate Installation & Erection Work with Steel Stair & Floor Steel Grating .5) Intake Air Filter Module Platform Column, Beam Erection Work.6) Gas Stack-1 & Gas Stack-2 Steel Structure Column, Beam, Bracing & Floor Bracing Erection Work. Structure Height 60.0 m (Total Fabrication weight 360 Ton)7) Radiator Structure, Column, Beam, Bracing Erection Work. L= 117.0 m, Width= 12.0 m), Total Fabrication weight 200 Ton.8) Heavy HFO, LFO, DO, Steam, Pipe Rack total 12 nos Erection Work, (Total Fabrication Weight 100 Ton.)9) Fuel Treatment Plant, Water Treatment Plant, Workshop & Store Pre-Fabricated Steel Structure Erection Work.