Electrical Engineer | Automation Engineer
Current- Responsible for Complete Diesel Generator sets (up to 500 KVA) troubleshooting, controller upgrade, fuel monitoring system, and software diagnostics
- Installation, commissioning, testing & troubleshooting of Temporary construction Power Stations with DG sets, ATSs, and Starter Panels
- Installation, commissioning of instruments like Flow meters, Level Sensors, Fuel Sensors, Pressure Transducers, Temperature sensor and switch etc. and their integration with PLC system.
- Worked on These Engines and its Software of Volvo, Perkins Kubota, caterpillar,
- Fabrication of Distribution Board, Sub Distribution panel Board, SCADA Panel Board, Motor starter Panel -DOL, STAR DELTA, SOFT STARTER, VFD Board
- Telemetry data analyzing, communicating, report compilation, command service crew for attending callout