Dion Putra

Dion Putra Email and Phone Number

Coordinator Permit To Work-Sumbawa LNG Terminal and Regasification at Amman Nusantara Gas @ PT Amman Mineral Nusa Tenggara
West Nusa Tenggara, Indonesia
Dion Putra's Location
West Java, Indonesia, Indonesia
About Dion Putra

PTW ENGINEER/PTW COORDINATOR/LOTO ENGINEER/HSECOMMISSIONING

Dion Putra's Current Company Details
PT Amman Mineral Nusa Tenggara

Pt Amman Mineral Nusa Tenggara

View
Coordinator Permit To Work-Sumbawa LNG Terminal and Regasification at Amman Nusantara Gas
West Nusa Tenggara, Indonesia
Website:
amnt.co.id
Employees:
3291
Dion Putra Work Experience Details
  • Pt Amman Mineral Nusa Tenggara
    Coordinator Permit To Work-Sumbawa Lng Terminal And Regasification At Amman Nusantara Gas
    Pt Amman Mineral Nusa Tenggara
    West Nusa Tenggara, Indonesia
  • Doosan Enerbility
    Commissioning Engineer Ptw/Loto
    Doosan Enerbility Jun 2023 - Present
    Cilegon, Suralaya
    1. Terminal Isolation Point2. Commisioning Permit To Work3. Energization Cleareance Protocol4. Lock-Out Tag-Out5. Single Line Diagram, Detail Engineering Diagram, Connection Diagram,6. Drawing P&I Diagram7. Safety Management & Training Permit To Work8. Permit To Work Inspector & LOTO InspectorActually I’m confused at the first time because I’m not familiar with this role and what exactly PTW Engineer do at this project. I think PTW Engineer only responsible to issued formal document for worker who will working at site. After a while, I realized that I’m totally wrong. PTW Engineer also has responsible to ensure location or equipment for handover between Construction Phase to Commisioning Phase to be safe. For fulfill these purpose , PTW Engineer shall be perform Terminal Isolation Point with Lock , Green Tag, Yellow Tag, Red Tag caution sticker after TOP (Turnover Package) Engineer give the information if the equipment / location is ready to handover to Commisioning Phase and TOP Engineer will released NOCC ( Notification Of Change Certificate ). NOCC is the formal document that issued by TOP Engineer if the system / equipment / location is already handover to Commisioning. If the system owners want to energize the equipment, they shall submit document that we can call it ECP (Energization Cleareance Protocol) and NOCC (Notification of Change Certificate) signed by Commisioning Manager to remove / release the Terminal Isolation Point. When the workers submit Permit To Work document, we should know what they will do, activity location, and when they will start the activity. If the location is not safe to start activity, PTW Engineer shall perform Lock Out Tag Out (LOTO) to make sure the system is safe (Close the Valve or Open The Breaker) and of course need to coordinate with commsioning engineer/system owners first.
  • Hyundai Engineering & Construction Co.,Ltd.
    Commissioning Engineer Ptw/Loto Coordinator
    Hyundai Engineering & Construction Co.,Ltd. Jun 2020 - May 2023
    Cirebon, West Java, Indonesia
    1. Terminal Isolation Point2. Commisioning Permit To Work3. Energization Cleareance Protocol4. Lock-Out Tag-Out5. Single Line Diagram, Detail Engineering Diagram, Connection Diagram,6. Drawing P&I Diagram7. Safety Management & Training Permit To Work8. Permit To Work Inspector & LOTO InspectorActually I’m confused at the first time because I’m not familiar with this role and what exactly PTW Engineer do at this project. I think PTW Engineer only responsible to issued formal document for worker who will working at site. After a while, I realized that I’m totally wrong. PTW Engineer also has responsible to ensure location or equipment for handover between Construction Phase to Commisioning Phase to be safe. For fulfill these purpose , PTW Engineer shall be perform Terminal Isolation Point with Lock , Green Tag, Yellow Tag, Red Tag caution sticker after TOP (Turnover Package) Engineer give the information if the equipment / location is ready to handover to Commisioning Phase and TOP Engineer will released NOCC ( Notification Of Change Certificate ). NOCC is the formal document that issued by TOP Engineer if the system / equipment / location is already handover to Commisioning. If the system owners want to energize the equipment, they shall submit document that we can call it ECP (Energization Cleareance Protocol) and NOCC (Notification of Change Certificate) signed by Commisioning Manager to remove / release the Terminal Isolation Point. When the workers submit Permit To Work document, we should know what they will do, activity location, and when they will start the activity. If the location is not safe to start activity, PTW Engineer shall perform Lock Out Tag Out (LOTO) to make sure the system is safe (Close the Valve or Open The Breaker) and of course need to coordinate with commsioning engineer/system owners first.
  • Hyundai Engineering & Construction Co.,Ltd.
    Safety Officer
    Hyundai Engineering & Construction Co.,Ltd. Jan 2017 - Dec 2019
    Indonesia

Frequently Asked Questions about Dion Putra

What company does Dion Putra work for?

Dion Putra works for Pt Amman Mineral Nusa Tenggara

What is Dion Putra's role at the current company?

Dion Putra's current role is Coordinator Permit To Work-Sumbawa LNG Terminal and Regasification at Amman Nusantara Gas.

Who are Dion Putra's colleagues?

Dion Putra's colleagues are Indra Sihaloho, Singgih Wibisono, Ade Sulkipli, Puji Rahmawati, Arian Aditya Adi Nugroho, Dr., Mkk, John Steven Samuel Sibarani, Andika Saputra Pratama Ranteallo.

Not the Dion Putra you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.