Mechanical Engineer
Responsible for issuing of technical documents and the technical approval of the purchase of mechanical equipments.Project ANGLO GOIAS II – FEL2: Perform technical bid evaluation, preparation of equipment data sheets.Project BASF AÇAI: Preparation of equipment data sheets, perform technical bid clarifications, perform technical bid evaluation, vendor’s documents and drawings review (reactors, heat exchangers, columns and internal columns). Participation in meetings with the client and equipment suppliers.Project RNEST – Northeast Refinery (PETROBRAS): Vendor’s documents and drawings review (columns). Technical Consultation for the client.Project BASF Sodium Methylate: Vendor’s documents and drawings review (pressure vessels, heat exchangers, API tanks, columns and internals of columns). Participation in meetings with the client and equipment suppliersProject Cubatão - Combined Cycle Power Plant (PETROBRAS): I have assumed responsibilities of senior engineers who left the project ensuring the quality and deadline. Preparation of equipment data sheets, preparation of technical specifications, preparation of equipment requisitions for enquiry, perform technical bid clarifications, perform technical bid evaluation, vendor’s documents and drawings review (turbines, HRSG, auxiliary boilers, cooling tower, pumps, pressure vessels, filters). Participation in meetings with the client and equipment suppliersSamarco Mining: Preparation of technical proposal for the replacement of the dedusting system of pelletizing.Project Termoaçu - Combined Cycle Power Plant (PETROBRAS) - Engineering design of 368MW Combined Cycle Power Plant: Verification of compliance of engineering documents with design criteria and conditions of contract, preparation of equipment data sheets, preparation of technical specifications, preparation of equipment requisitions for enquiry, perform technical bid clarifications, perform technical bid evaluation.