Michael Boland
AeroLeads people directory · profile

Michael Boland Email & Phone Number

Construction Engineer at Chevron at Chevron
Location: Brisbane City, Queensland, Australia 9 work roles 1 school
LinkedIn matched
✓ Verified Jun 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Construction Engineer at Chevron
Location
Brisbane City, Queensland, Australia
Company size

Who is Michael Boland? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Michael Boland is listed as Construction Engineer at Chevron at Chevron, a company with 66351 employees, based in Brisbane City, Queensland, Australia. AeroLeads shows a matched LinkedIn profile for Michael Boland.

Michael Boland previously worked as Construction Engineer at Chevron and Systems Delivery - CO2 Sequestration Enhancement at Chevron. Michael Boland holds Bachelor’S Degree, Mechanical Engineering from Cork Institute Of Technology.

Company email context

Email format at Chevron

This section adds company-level context without repeating Michael Boland's masked contact details.

Chevron

Review company-level records connected to Michael Boland before choosing the right outreach path.

Profile bio

About Michael Boland

Michael Boland is a Construction Engineer at Chevron at Chevron. He possess expertise in project engineering, petroleum, piping, inspection, refinery and 18 more skills.

Listed skills include Project Engineering, Petroleum, Piping, Inspection, and 19 others.

Current workplace

Michael Boland's current company

Company context helps verify the profile and gives searchers a useful next step.

Chevron
Chevron
Construction Engineer at Chevron
san ramon, california, united states
Website
Employees
66351
AeroLeads page
9 roles

Michael Boland work experience

A career timeline built from the work history available for this profile.

Construction Engineer

Current

Barrow Island, Wheatstone And Wheatstone Platform

Construction Engineer responsible for the performance of construction contractors on site at Barrow Island, Wheatstone downstream and Wheatstone Platform.Notable projects:Wheatstone Flare Tips replacement project. Wheatstone Platform Slops Tank refurbishment.Wheatstone LNG loading arms remediation project.Gorgon CO2 pressure management wells remediation.

Mar 2020 - Present

Systems Delivery - Co2 Sequestration Enhancement

Barrow Island, Western Australia, Australia

Notable Projects:Gorgon CO2 sequestration enhancementGorgon wax removal

Jan 2019 - Mar 2020

Milestone Delivery Lead - Domgas

Wheatstone

Responsible for the delivery of all subsystems in the Wheatstone DomGas facility through their respective completions milestones (Construction Complete, Mechanically Complete, Ready For Startup and Handover to Operations).

Jan 2018 - Dec 2018

Systems Delivery Engineer - Lng Train 1 Control Systems

Wheatstone Project

Aug 2016 - Feb 2018

Lng Osbl Mechanical Engineer

Wheatstone Project

Jun 2016 - Aug 2016

Tanks Project Engineer

Wheatstone Project

  • Chevron Australia – Wheatstone LNG Project (Greenfields): March 2013 – PresentTanks Project Engineer – FIFO to the Wheatstone Project site in Onslow, WA
  • Project Engineer in an assurance role for Chevron ABU, providing Technical assurance on the EPCM Contractor Tanks Engineering function to deliver the tanks in accordance with the projects safety, quality and delivery.
  • Coordinated with the projects Quality Assurance Team, anticipating problems, giving early warning of non-conformance, recommending corrective solutions to problems and working with the EPCM Contractor to enable.
  • The role encompassd the scope of two different subcontractors, the first constructing two 150,000m3 LNG tanks and two 120,000m3 condensate tanks. The second subcontractor constructed and installed fifteen API650 and.
  • Before mobilisation, I took part in LNG tank design reviews in Houston. While on site, I carried out reviews of Contractor and Subcontractor documentation and deliverables, participated in HazIDs and actively engaged.
Mar 2013 - Jun 2016

Project Engineer

CSBP Kwinana

  • May ‘11 – March 2013: CSBP Kwinana works – Project EngineeringProject Engineer/ Project Manager
  • Project Engineer responsible for providing guidance to, and coordinating the efforts of, a sea-container manufacturing company and a design team from a well known design house. o Produced a design for an IMDG/ ADG7/.
  • Project Engineer/ Manager responsible for the detailed design and development of a new mine site sodium cyanide “dissolution” tank facility and dissolution process which will become a “standard dissolution facility”.
  • Project Engineer/ Manager responsible for the detailed design of a 140kL “double-skinned tanks” sodium cyanide solution facility which has been adopted as the new sodium cyanide solution “standard facility”. Project.
  • Project Engineer responsible for the installation of a high capacity forced draught fan in a sodium cyanide plant incinerator in order to reduce NOx emissions and minimise carbon pricing costs. o A step change in.
  • Project Engineer - developed a 3D conceptual layout design & preliminary P&ID for a new Ammonium Nitrate Prill coating facility.
May 2011 - Mar 2013

Project Engineer

Bp

Kewdale, WA

  • BP Australia FVC Asset Management: October 2010 – April 2011October ‘10 – April ‘11: BP Kewdale Terminal, BP (Rio Tinto) Tom Price Terminal & BP Kalgoorlie TerminalProject Engineer/ Site Supervisor- 6 month fixed-term.
  • Project Engineer/ Site Supervisor jointly responsible for the re-commissioning of a 1ML diesel tank after API653 repairs in Rio Tinto, Tom Price iron ore mine. Project budget: Aus$1.2M.
  • Site Supervisor/ Permit Authority in BP Kalgoorlie Terminal overseeing mechanical contractors installing pipe work in the “execute” phase of a BP “Opal” fuel project for regional WA.
  • Project Engineer assisting with the upgrade and installation of a Fire Fighting System upgrade project to ensure compliance with AS1940-2004 at BP Kalgoorlie Terminal.
  • Engineering resource for an engineering and standards audit at BP Kalgoorlie Terminal.
  • Project Engineer during an API653 based Inspection of an 8m dia. Diesel tank in BP Kalgoorlie Terminal. Octel regulations compliance for work in leaded environments was an important factor in the project.
Oct 2010 - Apr 2011

Mechanical Engineer/ Tanks Supervisor

Whitegate Oil Refinery And Bantry Bay Oil Terminal

  • Oct 2009 – June 2010: Whitegate RefineryMechanical Engineer within the Maintenance Departmento Lead Project Engineer for a chemical injection system which reduced chemical costs by €90k per annum. Developed financial.
  • Lead Mechanical Engineer on a project to rationalise spare parts for 550+ relief valves.May 2009 – Oct 2009: Whitegate Refinery Turnaround (Shutdown) 2009: Turnaround Mechanical Engineer reporting to the Turnaround.
  • Tankage Supervisor responsible for the overhaul and re-commissioning of a slops tank, 2 product tanks and a butane sphere.
  • Engineer responsible for a Sulphur Recovery Unit overhaul and re-commissioning in early 2009, coping with budget cuts.
  • Lead an energy efficiency project to rationalise the type of steam trap used on site in order to reduce leaks, steam generation costs and maintenance resource usage.May 2008 – July 2008: Bantry Bay oil terminal.
  • Project Field Supervisor jointly responsible for contractor supervision on the overhaul of a 98,000m3 crude tank, ensuring that the tank was overhauled safely and in accordance with API 653.September 2007 – May 2008.
Sep 2007 - Jun 2010
Team & coworkers

Colleagues at Chevron

Other employees you can reach at chevron.com. View company contacts for 66351 employees →

1 education record

Michael Boland education

FAQ

Frequently asked questions about Michael Boland

Quick answers generated from the profile data available on this page.

What company does Michael Boland work for?

Michael Boland works for Chevron.

What is Michael Boland's role at Chevron?

Michael Boland is listed as Construction Engineer at Chevron at Chevron.

Where is Michael Boland based?

Michael Boland is based in Brisbane City, Queensland, Australia while working with Chevron.

What companies has Michael Boland worked for?

Michael Boland has worked for Chevron, Csbp, Bp, and Conocophillips.

Who are Michael Boland's colleagues at Chevron?

Michael Boland's colleagues at Chevron include Theodora Foster, Blake Petersen, Lisbelis Santiesteban, Chris Wu, and Jon Kidwell.

How can I contact Michael Boland?

You can use AeroLeads to view verified contact signals for Michael Boland at Chevron, including work email, phone, and LinkedIn data when available.

What schools did Michael Boland attend?

Michael Boland holds Bachelor’S Degree, Mechanical Engineering from Cork Institute Of Technology.

What skills is Michael Boland known for?

Michael Boland is listed with skills including Project Engineering, Petroleum, Piping, Inspection, Refinery, Engineering, P&Id, and Pumps.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Michael Boland you were looking for.

View similar profiles