Michael Kellermann Email and Phone Number
Michael Kellermann personal email
- Valid
- Valid
I am a Technical and Production Manager with a Mining Engineering Degree, Masters in Mechanical Engineering Science and +20 years on complex engineering and construction projects, pre-feasibility and feasibility studies, and production operations within the coal mining, civil infrastructure, and LPG storage sectors. For the last 12 years I have led specialist teams of mining, geotechnical, geological, survey and environmental specialists to design, optimise, schedule and deliver profitable coal mining operations for Tier 1 Ownerโs, including large fleets of mining trucks, excavators and shovels. I also provide specialist advice for development of strategies, budgets, forecasts and short, mid-term and Life of Mine planning processes, with a focus on innovation, integration, performance, and continuous improvement.Key Areas of Expertise:โก Leading large multi-discipline technical and production teams to high performance by placing the right people in the right roles, providing clarity of roles and expectations, driving and monitoring performance, developing talent capability, promoting appreciation for cultural, age and gender diversity, and facilitating cultures of respect for people and accountability for performanceโก Strategic mine design and planning, directing survey services, LOM and short term designs and schedules, mine recording and reporting, budgeting, forecasting, cost reporting, managing the creation of development designs to support mine schedule, assisting preparation of detailed infrastructure plans to support operations, and continuous mine improvement โก Working with production engineers to evaluate and optimise mine plans, working with geologists to design, schedule and manage resource definition requirements, and feasibility and due-diligence evaluations on prospective mining areasโก Developing robust relationships and affable alliances with multiple internal, client and subcontractor interfaces, and working collaboratively with people at every level of the organisation to identify and tackle key technical issuesโก Providing highly visible safety leadership, ensuring workers understand and comply with their HSE responsibilities, and holding meaningful safety interactions to raise overall safety awarenessโก Delivering profitable coal mining operations from concept studies through to steady-state mining operations, excellent value engineering skills, and leading complex contract positions, including high-value variation negotiationsโก Proven ability to influence and drive positive change in systems and cultures.
Thiess
View- Website:
- thiess.com
- Employees:
- 7718
-
Technical Services ManagerThiess Mar 2024 - PresentLake Vermont -
Mining Manager Curragh NorthCoronado Global Resources Inc. Apr 2023 - Jan 2024Blackwater, Queensland, AustraliaCurragh North produces 7.5mt of coking and thermal coal with annual waste movements of 110mbcm per annum. The fleet consists of 2 draglines, 1 shovel, 3x Coronado excavator fleets and 5 x Thiess excavator fleets. The structure of the operation creates a complex con-tracting environment where contract administration and relationship management skills are critical to the projectโs success.Achievementsโข Ground up contract rewrite in collaboration with Thiessโข Rebuilt the Thiess / Coronado relationship reinforcing high road behaviours and an efficient contracting environmentโข Rebuilt the Miningpro / Coronado relationshipโข Lead the โBack to basicsโ project increasing production by 400 annualised hours per loading unitโข Lead the reinvigoration of the field leadership system through expectation and standard setting, engaging a coach the coach model. -
Technical Services ManagerThiess Feb 2020 - Apr 2023Bhp Mt Arthur Open-Cut Coal Mine - Muswellbrook, NswTechnical Services cover gamma logging, geological models, design, schedule, environment, geotechnical and operational cost control. Core role deliverables include:โบ Managing 5 direct and 15 indirect reports to ensure the on-time and on-budget delivery of all contracted geology, geotechnical, mine design, short/long term scheduling, survey, and environment services for the Mt Arthur Coal operationโบ Placing the right people in the right roles, clarifying roles and expectations, providing technical and procedural guidance, driving and appraising performance, developing talent capability, ensuring an integrated approach with other resources to enhance collaboration, and modelling positive behaviours in line with Company Values (same for below roles)โบ Strategic mine design and planning, LOM designs and schedules, short term designs, mine recording and reporting, cost reporting, mine budgeting and forecasting, continuous mine improvement, managing the creation of development designs to support mine schedule, and working with production engineers for optimisation of the mine planโบ Financial evaluation and optimisation of mine plans, risk identification, working with geologists to design, schedule and manage resource definition requirements, and feasibility and due-diligence evaluations on prospective mining areasโบ Developing robust relationships with site-based Thiess management colleagues and General Managers within corporate, and with BHP site teams and the Contract Manager, Project General Manager, and Asset Presidentโบ Built collaborative relationships with the production team to create a high-trust culture focused on best results for the business, which has enabled high conformance to plan, and steady delivery of coal targetsโบ Geotechnical risk owner for the project. -
Technical Services ManagerThiess Jul 2015 - Feb 2020Mach Energy Mt Pleasant Coal Mine - Muswellbrook, NswMt Pleasant was designed as a 6km long 2 x 8750 dragline operation by Rio Tinto, and Thiess was invited to โreimagineโ the operation from the boreholes and extraction limits onwards. The mine was reconfigured into an intensive terrace design that delivered a large increase in NPV, and reduced impact on the local town of Muswellbrook. The equipment profile was 2 x 996 wheel loaders, 2 x 350t excavators and 24 Cat793 trucks. The operation is notable for positive community feedback relative to the surrounding operations. Mach Energy acquired the operation in 2016. As Technical Services Manager, core role deliverables and achievements included:โบ Strategic mine design and planning, LOM designs and schedules, short term designs, mine recording and reporting, cost reporting, mine budgeting and forecasting, continuous mine improvement, managing the creation of development designs to support mine schedule, and working with production engineers for optimisation of the mine planโบ Assisting the preparation of detailed infrastructure plans to support the operation, financial evaluation and optimisation on the mine plan, risk identification, working with geologists to design, schedule and manage resource definition requirements, and feasibility and due-diligence evaluations on prospective mining areas.โบ Built high-trust relationships with the MACH Energy Leadership Team, delivered the mine plan on sequence, and project start-up to steady-state was delivered on budgetโบ Created a safe, positive, and high-performance culture in the planning team, personally inducted 200 operators, and built a positive workforce culture from day 1โบ Designed the community impact strategy pertaining to visual amenity and noise management, and led the tender submission for mine planningโบ Led the pre-feasibility study in 2015 to deliver an increase in Project NPV, and led a feasibility study which further increased NPV. -
Technical Services ManagerThiess Jul 2012 - Jul 2017Coal Mining Projects As Listed - Australia & Indonesiaโจ Major Projectsโบ Carmichael Coal Tender Submission 1): Led the alternate bid team, reimagined the scope of the project and delivered Adani significant long-term savings โบ DMG Dysart East: Built understanding of the economic drivers of the HW300 highwall miner, and built a new mine concept and detailed planโบ Peabody Wilpinjong: Resolved the projectโs dump crisis with a significant change to the operations, and optimised the strategic mine planโบ Yancoal Duralie: Reduced strip ratio to save money in waste movement, and identified and redesigned out significant project risks โบ Full Redesign of Wambo Coal Mine for Peabody: Created a new margin ranking technique that outperformed all other optionsโบ Carmichael Coal Tender Submission 2 & 3: Improved the gains of the previous mine optimisation โบ MSJ Kalimantan, Indonesia: Facilitated on-site project value engineering workshopsโบ BHP Ayredale Pre-Feasibility Study: Led the value optimisation studyโบ Glencore Mt Owen North Pit: Technical Lead for bid.โจ Additional Studiesโบ Shenhua Watermark Coal Mine - Expert Technical Review Panel (2013 and 2015): Recommended a change of fleet selection from XPC4100โs to 9800 excavatorsโบ Yancoal/Peabody Middlemount: Business development, dozer push operations, and flood disaster remediation plan โบ BHP Mt Arthur Clay Ramp Pit: Doubled in-pit tipping volume, and significantly improved strip ratioโบ Anglo Callide Coal Mine: Due Diligence mine plan assessment and analysis โบ Blackwater Coal Mine: Business development and pre-feasibility studyโบ Integra Camberwell Coal Mine: Mine plan assessment and analysis โบ Glencore Mt Owen Coal Mine: Planning review and redesign โบ Coal Spur - Reviewer: Assisted with strategic mine designโบ Lake Vermont Coal Mine: Mine optimisation study โบ Peabody Burton Coal Mine: Mine plan risk reviewโบ Bylong Coal Optimisation Study: OPEX reductionโบ HVO Alluvial Pit Study: Strip ratio reduction. -
Planning Superintendent (Short & Mid Term)Bhp Billiton Jul 2010 - Jul 2012Mt Arthur Coal - Muswellbrook, NswEmployed as Short Term Planning Superintendent until November 2010, and Mid Term Planning Superintendent for the remainder of my tenure, key deliverables and achievements included:โบ Developed weekly schedules for 3 x 4100 shovels and 6 x 996 excavators, and rebuilt the BHP forecast, with physicals under the new method being delivered within 1% of targetโบ Built a monthly engine clock management system for all 400 plant items including trucks, diggers and major ancillary, with the new process linking maintenance planning and parts ordering directly to the mine planโบ Created the new mid-term planning process using Deswik, which integrated the scheduling and design work for the short-term (3 months) and mid-term (2 years) into 1 software packageโบ Initiated and designed a 24 MCBM rehandle bridge structure (160m high) through the centre of the pit, with the review validating a massive saving over the first 2 years. -
Project Engineer (Through To) Tender Technical LeadThiess Jul 2006 - Jun 2010Mt Owen Coal Complex - Upper Hunter Valley, NswCommencing as a Project Engineer, then moving onto roles as Long Term Planner in July 2007, Senior Mining Engineer in October 2008, Pit Supervisor in September 2009, and Tender technical Lead in March 2010, associated deliverables and achievements included:โบ Short term design, schedule and mass balance of North Pit, as well as annual budget full mine plan and assumptions, cost control and tracking for trucks, diggers and ancillary equipment, and ensuring scheduled delivery of monthly ROM tonnagesโบ Invented a calculation method to substantially increase the speed at which haulage solutions could run, which enabled a persistent competitive advantage for Thiessโบ Managed the largest cost code Truck on Waste to within 1% of budget for 2 years, created the coal reconciliation process (scored as the top of all the Xstrata mines), and consistently improved client confidence through forecast accuracyโบ Rebuilt all stages of the budget process from assumptions up to the CATS entry, with this exact system being used for large successful tenders in the futureโบ Built the mine plan for the tender, created Daily Cost Tracking, and created the CHPP allocation and stockpiling process to manage product coal commitmentsโบ Rebuilt fleet mixing and optimising calculations for Thiess standard methods and an innovative fractional trucking method. -
Site Engineer & Acting Yard & Spoil ManagerThiess Nov 2004 - Jul 2006Thiess Hochtief Jv - Epping To Chatswood Rail Link - Sydney, NswThiess Hochtief was a JV for the Epping-Chatswood rail link project, which included excavation of 2 x 12km tunnels using 7.2m Robbins TBMโs at penetration rates equalling or exceeding the world records for the diameter class. Employed as Site Engineer until July 2005, then Acting Yard and Spoil Manager until project completion, core role deliverables included:โบ Operational QA and defect reporting for temporary roof bolting and shotcrete, as well as time in motion productivity studies/optimisation, cross-passage final excavations, and QA supportโบ Managed the dismantled conveyor cleaning and shipping operation, as well as water treatment plant cleaning and silt disposal operations, and administered TBM waste disposal contract. -
Systems Engineer/TechnicianLynton Surveys Sep 2003 - Oct 2004Cross City Tunnel - Sydney, Nswโบ Installation, troubleshooting and/or maintenance of guidance and strata deformation monitoring systems, as well as managing subcontractor for equipment manufacturing, data processing, and daily reporting to the clientโบ Designed a universal extension sensor for continuous operation of a road header boom in extreme conditions, which made previously installed sensors redundant, and was implemented across the business.
-
Cadet EngineerWalter Construction Group Dec 1998 - Jul 1999Elgas Caverns Lpg Storage Facility - Sydney, Nsw
Michael Kellermann Skills
Frequently Asked Questions about Michael Kellermann
What company does Michael Kellermann work for?
Michael Kellermann works for Thiess
What is Michael Kellermann's role at the current company?
Michael Kellermann's current role is ๐ SSE ๐ Technical Manager ๐ Mining Manager ๐ MEng Mech, BEng Mining ๐ Coal Mining Studies and Optimisation.
What is Michael Kellermann's email address?
Michael Kellermann's email address is mi****@****ail.com
What schools did Michael Kellermann attend?
Michael Kellermann attended Unsw, Unsw.
What skills is Michael Kellermann known for?
Michael Kellermann has skills like Mining, Coal, Mining Engineering, Project Planning, Engineering, Contract Management.
Who are Michael Kellermann's colleagues?
Michael Kellermann's colleagues are Raรบl Quiroga Parra, Ryan Douglas, Ach Imam Farid Imam Farid, Darryl Mongoo, Tara Helmons, Aimee Formosa, Faldy Manafe.
Not the Michael Kellermann you were looking for?
-
-
Michael Kellermann
Raleigh, Nc4trimech.com, validsoft.com, trimech.com, callminer.com -
Michael Kellermann
Weikersheim -
Michael Kellermann
Washington Dc-Baltimore Area -
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records ร $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial