1. MW TXN Team Lead-Projects2. RAN Level 2 Operations Engineer 3. MW NMS Engineer4. WiMAX DT Engineer5. Team Lead Wireless Operations6. Field Engineer / WiMAX DeploymentTechnical Skills1) DCN planning and implementation for MW TXN.2) Network Management Servers: a. U2000 and T2000 NMS for RTN600/RTN900/BWS16/OSN8800 management.b. NEC MW NMS (PNMSj) installation, integration and maintenance.c. SAGEM MW NMS HighCAP operations.3) MW Link commissioning (Huawie RTN 600/RTN 900, iPASO 200, Pasolink NEO and SAGEM).4) Media Clearance for new sites integration.5) Huawei router AR2220 and AR2811 commissioning and troubleshooting.6) Cisco switches and router configuration and troubleshooting :ME 3400, 3750,26007) Good understanding of OSI Model, TCP/IP, switching and routing protocols.8) Solaris 10 basic administration.9) Windows server 2003/2007, Solaris 10 basic administration.10) Windows server 2003/2007,Linux OS basics.11) Netconfig Tool for NCT design to be used with PNMSj.12) CGEMS (Carrier Grade Element Management System) operations.13) WiMAX RF DT: (Couei) XCAL-X, XCAP, MAP-X , Map-info ,USB dongle and Google Earth.14) WiMAX BTS Installation, Commissioning, integration and troubleshooting15) Wireless bridges commissioning and troubleshooting (Redline, Moto, and UBNT).16) Stress Testing for WiMAX CPEs and BTS.
-
Sr. Engineer TransmissionZong Cmpak LtdLahore, Pk -
Mw Txn EngineerHuawei Technologies Aug 2013 - PresentLahoreNMS Engineer (CMPak Project) DCN Design DCN Optimization for ECC routes U2000 Server O&M DCN Switches and routers configuration and maintenance Working on RTN900 2G Media clearance and Expansions 3G/4G Media Clearance troubleshooting Packet Loss Issues Maintaining updated traffic sheets for 2G and 3G 2G/3G/4G Sites cut over and re-routing Warid 230 Swap Project Lead MW TXN for “Warid 230 Sites Swap Project” Redesign of NEC Topology at Netconfig Tool for Warid CG. Coordination with customer (TXN planning, Projects, NMS, FM, MS, Solution), cross region coordination with Huawei team and Subcons. Planning and strategy development for this Project keeping in view the mixed TXN network (RTN, NEC, Nera, ML , AR2811 and VSAT) and risk mitigation for minimum outage. Survey Reports Documents finalization and Survey reports analysis, Warid reconciliation , Warid provided data checking BOQ verification of Warid 2013project. NMS Visibility of about 1000 MW Nodes.Warid Rollout Project MW TXN Links deployment for RO sites. Media Clearance for Warid RO sites. Responsible for DCN planning and implementation of RTN and NEC. 230 NEC Nodes visibility restoration. 500+ RTN Links addition to NMS. MR Processing. Inventory and MW Services Reconciliation with Warid Team. DCN Routers Configuration and visibility at N2000. Working on RTN620/610, NEC (NEO, V4, MX, and Paso+), AR2811, AR2220, AR3260 Netconfig, T2000, PNMSj, Mapinfo, Visio etc. MR processing and inventory related issues from TXN end. Warid DWDM Project (U2000 HA System) U2000 HA System Installation and Commission on Solaris Machine. Integration of U2000 HA System with MPBN Network. RTN and DWDM DCN Migration from T2000 to U2000. DCN Traffic rerouting of RTN from Old DCN to new DCN. PAT of U2000 HA system and Handover. -
Nms EngineerHuawei Technologies 2014 - 2016 -
Nms EngineerHuawei Technologies 2013 - 2015 -
Wimax Ran Level 2 EngineerWateen Telecom Nov 2007 - Aug 2013Wateen Telecom (Lahore) Working as RAN Level-2 Eningeer. Drafting MOPs and SOPs for NOC and RAN L1. Owing the NMS for Pasolink NEO and iPasolink. Complete installation and integration of NEC MW NMS servers(Windows server 2003 and Solaris 10 based). Execution till completion “Metro Ethernet Extension Phase-1”. Integration and commissioning for “356 WiMAX Sites Rollout”. “Nationwide 150Mbps MW links audit and Optimization”. Nationwide configuration “Audit of RAN ME3400 Cisco switches”. Troubleshoot Major RAN outages Nationwide for minimum time resolution and RCA. VB Scripting to implement nationwide changes on RAN Sites and Cisco switches. Remote Support for Level-1 RAN Operations. “As Built site Audit” for complete access network before Re-launch of Wateen Telecom in 1st Nov 2011. Biweekly “Network Performance Issues analysis” for RF Planning and Optimization. Guiding NOC for real-time monitoring and doing technical configurations. Delivered Training Sessions for Pesolink NEO and Sagem troubleshooting. Microwave (Sagem and NEC) deployment, commissioning, integration dismantling of MW and Sites, MW traffic re-routing. WIMAX APs NMS and ASN-GW integration. RAN sites traffic re-routing from MW to Optical Fiber. Managing CGEMS for WIMAX Network, PNMSj for NEC MW backhaul network, and HighCAP Radio NMS for Sagem MW backhaul network. Configuring Cisco Switches (ME-3400) for aggregating backhaul traffic based upon VLAN. Eltek Power Equipment troubleshooting. Dealing with IP/MPLS core for WiMAX Cluster shifting and customer end services assurance. Drafting and upgrading RF-ATP document. Preparing MOP for NOC and Level-1. R&R of Faulty NEC MW equipment. Acting as a part of “81 ZTE Sites rollout” -
Wimax Dt EngineerWateen Telecom 2008 - 2009Wateen Telecom (Lahore) Performed Drive tests for two cities Lahore and Faisalabad and RF optimization. Tools for DT log collection X-CAL (couei) and XCAP-X (Couei) for Post Processing. ZTE test sites Drive Test for coverage radius and DL/UL throughput. Performing RF-Audit of Nationwide operational sites which includes on site verification of Tilts, Heights, Tx Power and other RF related parameters used subsequently for optimization activity. Prepare Drive Test result reports and propose fine tuning. To give recommendations to optimize the performance of existing sites by analyzing the post processed drive test data. Coverage and throughput Testing of multiple vendor CPEs (Motorola,ZTE,Greenpacket) and different models of same vendor. -
Team Lead WopWateen 2007 - 2008Wateen Telecom (Lahore) Field deployment (WiMAX, Corporate Solutions, Fiber optics deployment and VPN-L2 and L3,Wireless Bridge, DVB-RCS) connectivity and configuration and coordination with different departments (core, RAN, ONM, Billing ,SRP etc)if required. Configuration of WiMAX OSM, IAD, SIP PHONES, VIDEO PHONES, Wireless bridges. Worked as Team Lead (WiMAX Operation) , major responsibilities as Team Lead were team management and technical support for WiMAX filed related issues with corporate and consumer clients.
Muhammad Maqsood Education Details
Frequently Asked Questions about Muhammad Maqsood
What company does Muhammad Maqsood work for?
Muhammad Maqsood works for Zong Cmpak Ltd
What is Muhammad Maqsood's role at the current company?
Muhammad Maqsood's current role is Sr. Engineer Transmission.
What schools did Muhammad Maqsood attend?
Muhammad Maqsood attended University Of The Punjab, Lahore, University Of Engineering And Technology, Lahore, University Of Engineering And Technology, Lahore, University Of The Punjab, Lahore.
Who are Muhammad Maqsood's colleagues?
Muhammad Maqsood's colleagues are Babar Mahmood, Arsalan Mohmand, Musa Khan, Tabish Raza, Yasir Ali, Waqar Afzal, Ahmed Abdullah.
Not the Muhammad Maqsood you were looking for?
-
1yahoo.com
-
1hotmail.com
-
-
3gmail.com, huawei.com, yahoo.com
-
Muhammad Maqsood
Lahore
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial