Inspector
Currentassign to cover sandlake station and church station for finishing, also cover the installation of stormtech pipe all over the parking and general aspect of work for sandlake parking station.june to july -assign in one project of FDOT along one of the cr rd covering TCD and sidewalk july to august for pipe desilting and lining at 1792 south of jones bridge with terry Philips FDOT project ManagerSeptember 2014 to present presently sub with Mehta I-95 at build and design project of lane construction corp covering different assign task of civil works such as extension of box culvert, RCPipe and sometimes assign in bridges assist Sr inspector assign in US 17-92 for concrete slab replacement and also assign to cover the following item which grinding and grooving of concrete slab and sealing of joint construction joint .april 28 2016 take verification test for project FIN # 240196-2-58-01now assign to work for projects FIN # 432408-1-52-01 and FIN # 432407-1-52-01 lee road and SR 50 - until 6 . 24 .16 to 2. 5.18now assigned to SUNRAIL phase 2 6.27.16 onwardcovering construction of Poinciana station and parking area such pipe laying and other civil work concrete pavement for bus loop, D-curb sidewalk landscape irrigation system and paving and density for embankment and sub ballast for rail track construction Zone 42.5.18 to Present Sub with transystem night shift pipe work and other pay item