Distributed Control System Engineer Operation
CurrentDCS Engineer (Operation) for waste Heat Recovery Boiler in Coke Drying and Cooling Plant at NMDCSteel Plant Nagarnar (KNK Traders) from dated 10th Jan 2022 to till date.o Coke Drying and Cooling Plant o 25x8 TPH waste heat recovery boilero Steam pressure – 66 kg/cm²o Steam temperature – 500°C