Palani Kumar
AeroLeads people directory · profile

Palani Kumar Email & Phone Number

System Engineer at SAGE Automation
Location: Adelaide, South Australia, Australia 8 work roles 2 schools
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
System Engineer
Location
Adelaide, South Australia, Australia
Company size

Who is Palani Kumar? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Palani Kumar is listed as System Engineer at SAGE Automation, a with 539 employees, based in Adelaide, South Australia, Australia. AeroLeads shows a matched LinkedIn profile for Palani Kumar.

Palani Kumar previously worked as Manager - Control System & Instrumentation at Europem India Pvt Ltd and Senior Engineer - Automation at Sietec Solutionz Private Limited. Palani Kumar holds Bachelor Of Engineering (B.E.), Electronics And Instrumentation, First Class from St. Peter'S Engineering College.

Company email context

Email format at SAGE Automation

This section adds company-level context without repeating Palani Kumar's masked contact details.

SAGE Automation

Review company-level records connected to Palani Kumar before choosing the right outreach path.

Profile bio

About Palani Kumar

Industrial Automation and Instrumentation specialist with 12 years of Erection, designing, programming and maintenance activities

Current workplace

Palani Kumar's current company

Company context helps verify the profile and gives searchers a useful next step.

SAGE Automation
Sage Automation
System Engineer
Adelaide, SA, AU
Website
Employees
539
AeroLeads page
8 roles

Palani Kumar work experience

A career timeline built from the work history available for this profile.

Manager - Control System & Instrumentation

Europem India Pvt Ltd

India

 Prepared key documents, including control philosophies, interlock descriptions, alarm and set point configurations, and cause & effect diagrams. Assisted in preparing and organizing documents such as bills of materials, system architecture, general arrangement drawings for panels, internal panel wiring, and input/output distribution. Programmed PLCs and developed SCADA systems to meet application requirements. Developed and implemented PLC code and SCADA systems for a modification automation project, reducing commissioning time. Led a team of five engineers on various automation projects involving PLC programming and SCADA development. Successfully completed programming for safety PLCs (Siemens S7-1500).Sector – Oil & Gas, Waste Management SystemPLC – Siemens, Honeywell SCADA – Siemens WinCC

Jan 2023 - Sep 2024

Senior Engineer - Automation

India

 Developed control system designs aligned with project requirements and specifications, including control logic design, hardware and software selection, and system architecture creation. Designed and implemented control strategies to optimize system performance and efficiency. Provided on-site support and training for end users. Prepared documentation for Factory Acceptance Testing (FAT) and coordinated with clients to ensure technical satisfaction. Successfully completed Site Acceptance Testing (SAT) for two automation projects. Designed and implemented safety interlocks, alarms, and emergency shutdown systems to protect personnel and equipment.Sector– Wastewater Treatment SystemPLC – Siemens, Emerson, Allen Bradley SCADA – Siemens WinCC

Feb 2020 - Dec 2022

Electrical Engineer

Western Dairy Pvt Ltd

Fiji

 Managed the operation and maintenance of machinery in a beverage plant. Oversaw the complete pasteurization process in a dairy plant. Supervised control room operations, including the maintenance of field instruments and control systems. Forecasted engineering manpower requirements to maintain project schedules.Sector– Dairy, Water & Beverages

Jul 2018 - Jan 2020

Senior Engineer - Instrument & Control

Global Instrument Service

India

 Prepared instrumentation documents, including the Instrument Index, datasheets, instrument termination details, and instrument layout. Performed calibration on field instruments such as transmitters, gauges, switches, and control valves. Installed field instruments according to drawings, including instrument location, P&ID, hook-up, and termination diagrams. Conducted continuity and loop tests for all field instruments. Selected appropriate instruments and sensors based on process requirements, accuracy needs, and industry standards.Sector – Oil and gas

Sep 2015 - Jun 2018

Executive - Technical

Tanzania

 Oversaw the erection and commissioning of machinery in a water bottling plant, including blowing, filling, labeling, and packing machines. Completed PLC programming for the CIP system in the food industry. Prepared bills of materials in line with project requirements. Conducted Site Acceptance Testing (SAT) for all machinery and ensured compliance with technical documentation. Diagnosed and resolved issues with control systems and instrumentation by identifying faults, repairing components, and implementing corrective actions.Sector – Water and BeveragePLC – Siemens HMI – Siemens

Oct 2013 - Jul 2015

Engineer - Instrumentation

National Contracting Company

Saudi Arabia

 Supervised the installation of control systems and instrumentation to ensure adherence to design specifications. Ensured accurate and regular calibration of all field instruments to maintain precision. Conducted various tests, such as continuity and loop tests, to verify the functionality and reliability of instruments and control systems. Coordinated and conducted technical discussions with clients regarding material receiving inspections and field inspections. Developed detailed installation plans and schedules, including resource allocation and coordination with other teams or contractors.Sector – Desalination plant

Mar 2012 - Dec 2012

Engineer - Instrument & Control

Global Instrument Services

India

 Collaborated with installation teams and contractors to ensure the timely and accurate installation of instruments and systems. Performed calibration of field instruments to maintain accuracy and reliability, ensuring calibration records were properly maintained. Tested instrumentation and control systems to verify they met design specifications and functioned correctly. Coordinated with construction teams for pre-commissioning and mechanical completion. Created and maintained detailed documentation, including instrument datasheets, calibration records, and system diagrams. Worked with project managers, engineers, and other stakeholders to ensure project goals were achieved.Sector – Oil and Gas

Jun 2009 - Jan 2012
Team & coworkers

Colleagues at SAGE Automation

Other employees you can reach at gotosage.com. View company contacts for 539 employees →

2 education records

Palani Kumar education

Diploma, Electrical, Electronics And Communications Engineering, First Class

Kamaraj Polytechnic
FAQ

Frequently asked questions about Palani Kumar

Quick answers generated from the profile data available on this page.

What company does Palani Kumar work for?

Palani Kumar works for SAGE Automation.

What is Palani Kumar's role at SAGE Automation?

Palani Kumar is listed as System Engineer at SAGE Automation.

Where is Palani Kumar based?

Palani Kumar is based in Adelaide, South Australia, Australia while working with SAGE Automation.

What companies has Palani Kumar worked for?

Palani Kumar has worked for Sage Automation, Europem India Pvt Ltd, Sietec Solutionz Private Limited, Western Dairy Pvt Ltd, and Global Instrument Service.

Who are Palani Kumar's colleagues at SAGE Automation?

Palani Kumar's colleagues at SAGE Automation include Gray Medlicott, Russell Hartup, Richard Morawski, Michelle Bloem, and Aaron Fredric.

How can I contact Palani Kumar?

You can use AeroLeads to view verified contact signals for Palani Kumar at SAGE Automation, including work email, phone, and LinkedIn data when available.

What schools did Palani Kumar attend?

Palani Kumar holds Bachelor Of Engineering (B.E.), Electronics And Instrumentation, First Class from St. Peter'S Engineering College.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Palani Kumar you were looking for.

View similar profiles