CurrentProject Undertaken.1.Khimti Those Siwalaya HEP 1216 MW (DPR).2.REHAR SHEP 24.9 MW (Detailed Design)3.ALLERI PUMPED STORAGE PROJECT (1800 MW) Pre-Feasibility Report4.Thenamalai PUMPED STORAGE PROJECT (2400 MW) Pre-Feasibility Report5.Bhatkot PUMPED STORAGE PROJECT (1500 MW) Pre-Feasibility Report6.Upper Bhavani PUMPED STORAGE PROJECT (1000 MW) Detailed Project Report Key Responsibilities –● Potential Site identification of Pump Storage Site.● Plant layout planning and its optimization. ● Preliminary power potential for the finalization of generation and pumping energy.● Fixation of maximum water level (MWL), full reservoir level (FRL) and minimum drawdown level (MDDL) of the project. ● Hydraulic design of Embankment dam, Chute spillway, Concrete gravity dam, Stilling basin, Power Intake Tunnel, Surge Shaft and Hydraulic Design. ● Economic Dia calculation of Penstock and Tunnel. Estimation and rate analysis of the project, including equipment planning.● Alternative Study and fixation of layout.● Reservoir Simulation ● Hydraulic design of diffuser intake. ● Stability analysis of Dam Overflow and Non- Overflow Section by Gravity Method. ● Hydraulic Design of Spillway Capacity & Calculation of Upstream and Downstream Profile. ● Design of Energy Dissipation Arrangement (Trajectory Bucket) of Dam.● Hydraulic Design of Diversion Tunnel. ● Calculation of dam Freeboard and fetch length calculation. ● Structural Design of tailrace pool. ● Stability analysis