Cng Engineer In Projects
Current•Conduct feasibility studies and site assessments to identify suitable locations for CNG stations.•Collaborate with stakeholders to define project scope, objectives, and technical requirements.•Develop detailed engineering designs and drawings for CNG stations and associated facilities.•Managing CNG project related activities including from land surveying to commission of CNG station.•Handling compressor installing having capacity of 250 SCMH, 450 SCMH ,600 SCMH and 1200 SCMH.•Handling CNG cascade installation of 3000 WL and 4500 WL.•Supervision of SS Tubing installation from compressor priority panel to dispenser/storage cascade and performing hydrotest.•Follow T4S guidelines •Verification of inter distances according to T4S schedule.•Supervision of foundation construction for compressor, storage cascade, Air compressor and CO2 flooding systems including fabrication of fencing and construction of SS Tubing trench according to issue for construction drawings.•Supervision of earthing grid installation and construction of earthing Pit Handling compressor and cascade erection filling pre commissioning check list according to T4S guidelines.•Managing commissioning of CNG stations. •Detailed Engineering Survey & Reconnaissance Survey validation & Soil stratification & Geotechnical Investigation.•To assists in execution and Laying of Steel & MDPE Pipeline by coordinating and Liaoning With various stake holders (contractor, Gov. Authorities, Local bodies) by strictly adhering to the guideline of PNGRB and to meet MWP targets.•Monitoring of HDD MACHINE Work Progress/Shots for Laying STEEL Pipeline After Calibration of Pilot.•To assist and Monitor Main Line Welding, Holiday test, Backfilling, Hydro test, Swabbing, Drying, Pre-Commissioning, schedule and execute different inspections Air flushing, Drying and testing activities with Contractor and PMC Engineers.• Fusion in MDPE tapping and coupling.•HDD Machine Route survey and Supervision of Operation.