Patrick Guilfoyle
AeroLeads people directory · profile

Patrick Guilfoyle Email & Phone Number

Senior Rc Detailer at JRL Group Ltd
Location: Borehamwood, England, United Kingdom 14 work roles 1 school
1 work email found @jrlgroup.co.uk LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email p****@jrlgroup.co.uk
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Rc Detailer
Location
Borehamwood, England, United Kingdom
Company size

Who is Patrick Guilfoyle? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Patrick Guilfoyle is listed as Senior Rc Detailer at JRL Group Ltd, a with 462 employees, based in Borehamwood, England, United Kingdom. AeroLeads shows a work email signal at jrlgroup.co.uk and a matched LinkedIn profile for Patrick Guilfoyle.

Patrick Guilfoyle previously worked as Group Senior RC Detailer/RC Detailing Manager at Kilnbridge Construction Services Limited and Technical Manager at K-Stress Engineering. Patrick Guilfoyle holds National Diploma In Civil Engineering, Construction Engineering, Distinction from Dundalk Institute Of Technology.

Company email context

Email format at JRL Group Ltd

This section adds company-level context without repeating Patrick Guilfoyle's masked contact details.

{first}.{last}@jrlgroup.co.uk
89% confidence

AeroLeads found 1 current-domain work email signal for Patrick Guilfoyle. Compare company email patterns before reaching out.

Profile bio

About Patrick Guilfoyle

Ambitious and versatile management professional with extensive experience in concrete frames, reinforced concrete detailing in both 2D and 3D, post tensioning and concrete water retaining structures. Proven capacity to evaluate buildability of design by utilising 3D/virtually modelling. Demonstrated success partnering with all project stakeholders and typically will act as primary contact with the various team members for a significant part of the works. Skilled at constructing VDC and Revit models.

Listed skills include Bim, Civil Engineering, and Virtual Design.

Current workplace

Patrick Guilfoyle's current company

Company context helps verify the profile and gives searchers a useful next step.

JRL Group Ltd
Jrl Group Ltd
Senior Rc Detailer
borehamwood, hertfordshire, united kingdom
Website
Employees
462
AeroLeads page
14 roles

Patrick Guilfoyle work experience

A career timeline built from the work history available for this profile.

Senior Rc Detailer

Current

Borehamwood London

Assisted in helping the JRL Group achieve Cares approval Part 2 for The Supply and or Installation of Post-tensioning Systems in Concrete Structures (Excluding Highways Structures), is for general structures such as concrete frames, floor slabs and containment structures. This scheme allows an approved specialist producer to supply post-tensioning systems and another approved specialist to install, stress and grout (where required) the post-tensioning system.

Jun 2019 - Present

Group Senior Rc Detailer/Rc Detailing Manager

Leverage RC Detailing expertise to all staff members on various projects to resolve potential problems and enhance buildability. Regulate tender process by delivering timely rebar quantities to estimation department. Initiate quantity take-off by employing 3D design models through Navisworks quantification that ensure reliability to ender process. Internalise and deliver services related to outsource RC detailing by the group.

Jun 2017 - Jun 2019

Technical Manager

K-Stress Engineering

K-Stress Engineering provide a full package of design, supply and installation of Post Tensioning Systems to Main Contractor and Concrete frame contractors. Post Tensioning - Design Supply and InstallationBridge Jacking, Sliding and Similar WorkPost Tensioning - Tenders and Design Development

Jun 2017 - Mar 2019

Design Manager / Technical Co-Ordinator

Spearheaded RC detailing and coordination process at group level to elevate design and production of calculations and drawings both at PT and RC level. Incorporated quantity measurements from the 3D design models using, Navisworks quantification in order to deliver certainty to tender process. Skilfully communicated with clients, contractors, architects, consulting engineers, site personnel, and key stakeholders for design cohesiveness.

Jul 2016 - May 2017

Technical Co-Ordinator/Bim Champion/Bim Co-Ordinator/Digital Engineering/Vdc

Dunne Group Limited/Conforce Post Tensioning Systems

Leeds, United Kingdom

Delivered RC Detailing technical recommendations across different departments of group on all concrete elements. Managed all PT and RC drawings on all our group projects. Championed the benefits of Bim/Digitally Engineering across the group. Tasked with the objective of gaining the group Bim level 2 by adhering to PAS 1192. Elaborated design models to demonstrate building sequences and pour layouts. Produced VDC models for tender presentations.

Jun 2007 - Jul 2016

Principal Structural Technician

Gifford Consulting Engineers/Now Ramboll

Gifford champion for the Cads-RC Detailing Software carrying out training both in house and external Gifford offices. Involved in the development of 3D Modelling in both design and detailing across the Gifford Group as a whole.Responsible for overseeing drawing production and maintaining draughting standards within the Gifford Leeds office and the Group as a whole.Outsource RC Detailing Coordinator for Gifford Northern offices.Major Projects worked on included:Rotherham Westgate Project Principle Technician responsible for producing General Arrangement and RC detaildrawings for a six storey concrete frame with 2 basement car park levels. Bromsgrove Schools PFI Preparing Reinforced concrete details for a total of 9No. Post tensioned flat slabs and associated concrete details for 2 different schools in the above PFI. Tradewinds GibraltarResponsible for producing all the Reinforced concrete details for the groundwork’s and first two floors of the above project which consists of 3No Towers which vary between 8 and 12 storey's in height. Elements consisted of pile caps, ground beams, retaining walls and lift core bases. Responsible for the management of the outsourced detailing work for the rest of the superstructureWest Tower Liverpool – 40 Storey Tower Responsible for checking all the foundation and vertical concrete element reinforcement details for the above structure. Responsible for the management of the outsourced detailing work. University Of PlymouthPreparing Reinforced concrete details for a total of 16No. Post tensioned flat slabs and associated concrete elements for the above structure. Other elements include numerous post tensioned concrete transfer beams. City Gate, ManchesterPreparing Reinforced concrete details for a total of 22No. Post tensioned flat slabs and associated details for the above residential development. John Radcliffe Hospital Oxford

Mar 2004 - Jun 2007

Senior Structural Technican /Rc Detailing Team Leader

Introduced CADS-RC to the Carl Bro Leeds OfficeWater Retaining StructuresManager and co-ordinator of a team of experienced technicians responsible for the production of reinforced concrete detailed drawings for various water retaining structures for the Carl Bro Water Department. Duties also include ensuring drawings are produced under budget and within deadline restraints. All RC drawings produced by myself were prepared using the CADS-RC detailing software.Dublin Port Tunnel – Southern Operations Building.Solely responsible for preparing the reinforced concrete details for the above building which is buried and constructed from concrete in its entirety

Aug 2002 - Mar 2004

Senior Structural Technician

Introduced CADS-RC to Curtins Leeds office.Duties include managing the office Cad system and overseeing and checking drawing production by junior members of staff.Responsible for the production of the General arrangement and RC details drawings of all the major projects carried out in the Leeds office which included two mental health hospitals constructed in Load Bearing Masonry and a seven story apartment block constructed in both concrete and steel.

Apr 2001 - Aug 2002

Senior Structural Technician

Fairhurst Consulting And Structural Engineers

Introduced CADS-RC to Fairhurst Leeds office. Responsible for over 90% of the R.C. Detailing work carried out by the W.A. Fairhurst Leeds office. On numerous occasions I was asked to carry out work for other Fairhurst offices.Tesco Superstore – Forest Fach SwanseaPreparation of all the structural drawings for the above project including Concrete G.A.’s, Steelwork G.A.’s and all the RC detailing work which includes 200m of retaining walls of varying complexity. Tesco Superstore - Central Park Wigan Preparation of General arrangement and R.C. drawings for the Enabling works for the above project, which included a new concrete access road bridge, a concrete pedestrian footbridge, a flood compensation moat and a pedestrian footbridge. BP Grangemouth Responsible for the production of over 50 general arrangement and R.C. detail drawings for a new chemical plant for BP at Grangemouth in Scotland. Work carried out for W.A. Fairhurst Edinburgh office.

May 1998 - Apr 2001

Assistant Section Engineer

Gifford And Partners

15.5 Million M621/M1 Link Road contract in Leeds. Site supervision in accordance with the ICE Conditions of Contract. Responsible for roadwork’s, drainage and several structures including 400m of cantilever retaining walls and a 200m long reinforced concrete water retaining structure to carry a sliproad which will be below the permanent water table.

May 1995 - May 1998

On Site Technician/Rc Detailer

Gifford And Partners

Hong Kong

Kwai Chung Viaduct Hong Kong. On Site CAD/Technician/Detailer during construction of £250 million Kwai Chung Viaduct which is a 3km long elevated highway with adjacent railway bridges and approach ramps. Sole Technician responsible for preparing and detailing the sub-structure drawings in line with the contractors requirements

Sep 1994 - May 1995

Structural Cad Technician

Gifford And Partners

Introduced CADS-RC to Gifford York office. Responsible for setting up and managing the office CAD system.Preparation of general arrangement and detail drawings on the following major projects:Leeds General Infirmary Redevelopment £40m new 7 storey hospital on congested city centre site. One corner of the building spans the A64 Inner Ring Road. Includes 400 metres of retaining walls and a 6 metre deep transfer beam which spans 32 metres, a concrete frame structure which started on site October 1993 and opened in 1997.Clerical Statistics Office, Cork, Ireland Preparation of tendon layouts and RC details of 10 post tensioned flat slabs for specialist pre-stressing contractor.£32M New Factory for British American Tobacco, Southampton Preparation of tendon layouts and RC retails of main factory post tensioned ground bearing floor slabs and associated warehouse post tensioned suspended ground slab.

Jan 1992 - Sep 1994

Structural Cad Technician

Richard Herrman Assocaites
Jan 1991 - Dec 1991
Team & coworkers

Colleagues at JRL Group Ltd

Other employees you can reach at jrlgroup.co.uk. View company contacts for 462 employees →

1 education record

Patrick Guilfoyle education

FAQ

Frequently asked questions about Patrick Guilfoyle

Quick answers generated from the profile data available on this page.

What company does Patrick Guilfoyle work for?

Patrick Guilfoyle works for JRL Group Ltd.

What is Patrick Guilfoyle's role at JRL Group Ltd?

Patrick Guilfoyle is listed as Senior Rc Detailer at JRL Group Ltd.

What is Patrick Guilfoyle's email address?

AeroLeads has found 1 work email signal at @jrlgroup.co.uk for Patrick Guilfoyle at JRL Group Ltd.

Where is Patrick Guilfoyle based?

Patrick Guilfoyle is based in Borehamwood, England, United Kingdom while working with JRL Group Ltd.

What companies has Patrick Guilfoyle worked for?

Patrick Guilfoyle has worked for Jrl Group Ltd, Kilnbridge Construction Services Limited, K-Stress Engineering, Byrne Bros (Formwork), and Dunne Group Limited/Conforce Post Tensioning Systems.

Who are Patrick Guilfoyle's colleagues at JRL Group Ltd?

Patrick Guilfoyle's colleagues at JRL Group Ltd include Alessandro Sarbia, Will James, Nick Cutler, Claudio Porcu, and James Reilly.

How can I contact Patrick Guilfoyle?

You can use AeroLeads to view verified contact signals for Patrick Guilfoyle at JRL Group Ltd, including work email, phone, and LinkedIn data when available.

What schools did Patrick Guilfoyle attend?

Patrick Guilfoyle holds National Diploma In Civil Engineering, Construction Engineering, Distinction from Dundalk Institute Of Technology.

What skills is Patrick Guilfoyle known for?

Patrick Guilfoyle is listed with skills including Bim, Civil Engineering, and Virtual Design.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Patrick Guilfoyle you were looking for.

View similar profiles