Senior Structural Technician
Fairhurst Consulting And Structural Engineers
Introduced CADS-RC to Fairhurst Leeds office. Responsible for over 90% of the R.C. Detailing work carried out by the W.A. Fairhurst Leeds office. On numerous occasions I was asked to carry out work for other Fairhurst offices.Tesco Superstore – Forest Fach SwanseaPreparation of all the structural drawings for the above project including Concrete G.A.’s, Steelwork G.A.’s and all the RC detailing work which includes 200m of retaining walls of varying complexity. Tesco Superstore - Central Park Wigan Preparation of General arrangement and R.C. drawings for the Enabling works for the above project, which included a new concrete access road bridge, a concrete pedestrian footbridge, a flood compensation moat and a pedestrian footbridge. BP Grangemouth Responsible for the production of over 50 general arrangement and R.C. detail drawings for a new chemical plant for BP at Grangemouth in Scotland. Work carried out for W.A. Fairhurst Edinburgh office.