Continuous Improvement Intern
Current5S Implementation for TIH (Teflon Inline Heater)• Conducted Gemba walks to develop a detailed process flow diagram and proposed a new layout, reducing travel time by 25%.• Performed time studies and corrected standard times for operations that exceeded expected durations.• Cataloged tools by operation and implemented a color-coding system, red-tagging unnecessary tools.• Installed shadow boards at each station, reducing tool search time by 15%.• Performed a gap analysis and a post-5S time study, resulting in a 5% improvement in process time.Profitability Analysis.• Identified a high-runner product in TIH based on sales data and performed a cost breakdown.• Conducted Pareto analysis on material costs, focusing on the top 80%.• Analyzed MRR data to identify problematic suppliers and collaborated with purchasing to source potential new suppliers.• Aligned the Kaizen event with profitability goals, reducing labor costs by $500.• Successfully increased profit margins from 31% to 40%.