Assistant Manager Maintenance Electrical
CurrentCurrently I am working as Electrical Maintenance Engineer in FACT .MAINTENANCE EXPERIENCEJob involves preventive and breakdown maintenance of the electrical system consisting of 1.Conveyors2.Pumps3.VFD (AC and DC)4.DG Set5.UPS6.HT and LT Switchgears7.TransformersDESIGN EXPERIENCEWorked in an Electrical System Analysis using ETAP project for Bharat Petroleum Corporation Ltd. Kochi Refinery. About the ProjectFact Engineering and Design Organisation(FEDO) got the project for the electrical system study in BPCL-KR as, the electrical system was experiencing frequent instability which lead to black outs. The entire electrical system was analysed using ETAP and various analysis were done as followingSystem ModellingLoad Flow AnalysisShort Circuit AnalysisTransient AnalysisRelay Coordination StudyMotor Start Impact Study The suggestions and recommedations given by FEDO have been implemented and the instability problem of the system has been mitigated.COMMISSIONING EXPERIENCE OF NUMERICAL RELAYSGE Numerical relays 339(motor protection) and 745(transformer protection) were commissioned in our plant replacing the old Electromechanical relays. The task involved1. Modification of existing old control circuit for protection.2. Programming of the relays.ERECTION AND COMMISSIONING OF 11 kV SUBSTATION Currently supervising the erection and commissioning of 11kV sub station in Willingdon Island.The job involves1. Erection ,testing and commissioning of HT and LT switchgears.2. Erection ,testing and commissioning of transformers.3. Cable laying and termination (power cable, earth cable,lighting).