Deputy General Manager - Projects
CurrentProject Summary : Execution of an LNG regasification project based on leased FSRU, moored at the LNG jetty, within Jaigarh port. The FSRU will receive LNG by ship to ship transfer from LNG Carrier (LNGC), which will moor side by side to the FSRU. LNG will be transferred from LNGC to FRSU via flexible hoses. The FSRU will store, pressurize and re-gasify the LNG. The high pressure natural gas will be exported from FSRU via articulated High Pressure Gas Unloading Arms mounted on one of the Breasting Dolphins near the jetty head and be transported via a gas pipeline from jetty to onshore terminal area where metering, power generation, fuel gas conditioning along with other necessary utilities will be located. From there, gas will flow approx. 60 km via Jaigarh – Dabhol Tie – in Pipeline (JDTPL)with a design capacity of 6 MMTPA to Dabhol. Key responsibilities are listed as below:1. Ensure that project is planned and engineered, within the time, cost and performance specifications as agreed in EPC Contract, ensuring safety and addressing environmental concerns.2. Analyze pre-contract correspondence vis-a-vis contract and resolve grey areas, if any, in the contract.3. Involved in EPC contract negotiation and preparation of Performance Guarantee Parameters.4. Preparing EPC Contracts including Scope preparation, RFQ preparation, Bids review, Contract negotiations and administration, award of contracts and contract amendments.5. Ensure that cost and work-hours are properly monitored, reported and take preventive / corrective action where necessary. Coordination with site team for measurement correctness and completing invoice verification.6. Deputed at Sener (Spain) as project coordinator for a period for six months, Co-ordination with internal Engineering team and main focal point with EPC Contractor’s team.7. Development of LNG regasification terminal FEED with Worley Parsons and Hyundai Engineering and development of PFD, UFD, P&IDs, various operating philosophies