Procurement Qc Supervisor / Senior Qa/Qc Engineer
Saudi Aramco approved PQCS (PROCUREMENT QUALITY CONTROL SUPERVISOR)Senior QA/QC Engineer with "American Society for Non-Destructive testing (ASNT) Level-II Certification in RT, UT, MT, PT" and "ISO 9001 : 2015 IRCA lead auditor". Saudi Aramco approved procurement quality control supervisor in (Mechanical) welding, piping, structural for offshore with SAP number . Having 13 years+ experience as QA/QC Engineer/QC supervisor /PQCS in international projects of Saudi Aramco for both offshore… Show more Saudi Aramco approved PQCS (PROCUREMENT QUALITY CONTROL SUPERVISOR)Senior QA/QC Engineer with "American Society for Non-Destructive testing (ASNT) Level-II Certification in RT, UT, MT, PT" and "ISO 9001 : 2015 IRCA lead auditor". Saudi Aramco approved procurement quality control supervisor in (Mechanical) welding, piping, structural for offshore with SAP number . Having 13 years+ experience as QA/QC Engineer/QC supervisor /PQCS in international projects of Saudi Aramco for both offshore construction and procurement quality control activities . SAUDI ARAMCO Approved “PQCS” - PROCUREMENT QUALITY CONTROL SUPERVISOR.Review of Project MRs based on Saudi Aramco specifications, Schedules,RVL, 9com etc.Review of vendors technical offers and selection of vendors based on TBE.Review of vendor’s project specific quality documents like Inspection & TestPlans (ITP), NDT procedures, Welding Procedures, Pressure test Procedures, PWHT procedures, painting Procedures, FAT procedures etc. and submission of the same to client as per schedule.Review of Inspection Assignment Packages and submission to client and to obtain inspection lot number (IL #) for the procured items.Review of Vendors MRB and issue IRN to the vendor for final dispatch of procured items.Issue complete MRB & FDR to Inward material inspection department of Construction sites for clearance of material at these sites.Ensure availability of required inspector for the inspection activities.Study of ITP along with Inspectors and decide which SAIC are applicable against each ITP stage. In addition to SAIC, required SATR or report format is also to be finalized.Walkthrough with SAPID and preparation of PMCC punch pointsMonitoring of LBEs and INCRs, root cause analysis and corrective actions and follow up for close out. Show less