Production Scheduler
CurrentFrom July to September, ran the turrets - Amada EM 2510NT.From September to November, aided in operating the LVD Phoenix FL, which is a flatbed laser cutter. Operating the laser also included using the Tower Automation System.From November onwards, I’ve been working on making and managing a scheduler that would aid in scheduling and tracking all the jobs in the workshop.One of our project managers was away on holiday from 28th May 2024 to 10th July 2024, and I’ve been shouldering his work while he’s away. This includes talking to the clients, sometimes converting their ideas into drawings, converting the drawings to machine code, ordering material for the job and ensuring they are made within the required timeframe.