Samir Banerjee

Samir Banerjee Email and Phone Number

RCM at Resonance Energy Private Limited @
Samir Banerjee's Location
Baduria, West Bengal, India, India
About Samir Banerjee

I have 28 years of comprehensive project execution experience in structural, piping, and civil projects, encompassing micro-planning, procurement, estimating, hookup, and commissioning in oil & gas, refinery, CGD, cross-country piping, and offshore projects. I have collaborated with ONGC, IOCL, and MNGL, and worked with third-party inspection and design agencies such as EIL, Bechtel, and ABB. With strong communication and team-building skills, I ensure success in EPC projects within time and budget constraints

Samir Banerjee's Current Company Details
ESTEEM PROJECT PVT  LTD.

Esteem Project Pvt Ltd.

RCM at Resonance Energy Private Limited
Samir Banerjee Work Experience Details
  • Esteem Project Pvt  Ltd.
    Project Manager
    Esteem Project Pvt Ltd. Feb 2023 - Present
    Guwahati
    1.Executed for fabrication & installation 0f Fired Heaters (as per API 560),Hydrogen Reformers & Gas Cracking Furnaces construction activities in CRU unit of IOCL Guwahati Noonmati refinay.2. Involved in this Project Estimating, Procurement and billing certification.
  • Resonance Energy Private Limited
    Rcm
    Resonance Energy Private Limited Nov 2019 - Dec 2022
    Nashik, Maharashtra, India
    1.Executed for laying of 400km long CGD Pipeline(10”/6”/4”) 6.4 mm thickness 150/100 schedule networking system as per ASTM A106,API 5L 60/52 with 3 Layer External PE Coating In NASHIK at GA., Job involved for the Specification finalization, Work Procedure as per Engineering requirement as well as overall in-charge for construction activities.2.The job involved Erection of CNG Tank foundation, Pipeline Laying along with Fire fighting system & Modifications as per site requirements. Also involved anti corrosive Rapping & Coating,Pigging,flashing, Hydro testing, Nitrogen purging, TCP installation as well as Billing certification as per contractual requirements. 3.Executed for MDPE( 80/90,SDR 11)laying along with G1(½”,3/4”,1”,2”) Pipe for interconnection and also installation of Service Regulator ( 25/50 SCMH – 4 Bar). Job involved Painting as per specification , Pressure testing and color coding.4.Deputed at Bangladesh for India Bangladesh Friend-Ship friendship HDD Pipeline project during June 2022 to October 2022.Job involved for 125 Km long long CGD Pipeline (12”/10” ) 6.4 mm thickness 150/100 schedule networking system as per ASTM A106,API 5L 52 (for Seven River crossing).
  • Essar Project Management Consultant Limited
    Project Manager
    Essar Project Management Consultant Limited Jun 2017 - Nov 2019
    Kharagpur Area,W.B. India
    1.Executed for laying of 160 km long CGD Pipeline networking system along with 120 TMTPA LPG bottling plant,involved in this project for finalizing the Specification & Engineering requirements and also Overall In charge for Construction activities like Land filling and Leveling,Boundary Wall & Approach Road,Tank Pad Construction also Equipment Erection.2.Deputation for IOCL Panipat Refinery to Executed 30 days Shutdown Job at Hydrogen Unit, involved in this job for Modification of Piping, Pipe Rack, Deck extension, Nitrogen Purging, Hot Tapping, Loop Preparation and finally hand over the System within the Stipulated time as per Safety Norms.
  • Nagarjuna Oil Corporation Limited, Cuddalore,Tamil Nadu.
    Piping Head
    Nagarjuna Oil Corporation Limited, Cuddalore,Tamil Nadu. Jun 2006 - Jun 2017
    1.Worked as AGM Project for Construction of Crude Distillation Unit (CUD)and also overall in charge for ISBL & Off Site Piping during Refinery Construction Phase.2.Executed the Ro-Ro jetty Construction for receiving the Oversize equipment, involve in managing Dredging, Breakwater also Off-Shore Jacket piping, Structural Walk Way for SPM as per HSE regulation. 3.To Lead the EPCM Piping department & Engineering Team as HOD ( Piping) for Preparing Piping Specification and MTO finalization during the Refinery Construction phase and also involved in Area Classification Drawing, 4.Executed the entire Direct / Indirect workforce to complete the Refurbish, Revamping activities relating to Static Equipment & Piping Item Like Insulation removal, Retrieving of fitting & support from the Pipe Spool, Re-tooling of Flanges, internal Cleaning, Cross Thickness checking as per piping Specification.
  • Reliance Industries Limited
    Dy Project Manager
    Reliance Industries Limited Jun 1998 - Jul 2006
    Jamnagar Area, India
    1.Worked as Consultant Engineer at Marine Tank Farm area & Off Site Piping as per ANSI / ASME B31.1 Like Carbon Steel 106 Gr.-B , A33 P11 & P22 from Construction to Commissioning during July 1998 to Jan 2000, involved in this project for Plan & Supervised all the Construction activity to ensure proper compliance with all Technical and safety aspect.2.420 km 42"Gas pipeline Cross country Project with gas Compression Pumping & Metering facility 52M man-hoursShutdown Job :-1.Worked as Dy. Manager Project for revamping the Crude Distillation of 28 days Shutdown Job during 2003, ensure to work permit system in the live area and also Tag/lock Out System. 2.Worked as Dy. Manager Project of Fluid catalyst Cracker Unit for Pre & Post Shutdown activities like Structural Rack Extension and Piping Net work system Laying in live Area for 32 days Shutdown job during 2005.
  • Hcc
    Dy.Project Manager
    Hcc Nov 1997 - Jun 1998
    Mumbai Area, India
    1.Worked as Manager Project for laying 50 Km long Cross Country pipe line for LPG (SA 333 Gr. B )Gas distribution at Mumbai under The Mahanagar Gas LTD. Involved in this project erection, Modification & Material procurement as per site requirement. Also involved in anti corrosive rapping & coating (Out Side).2.To co-ordinate all engineering & site activities during the project phase and also maintain of all operation record and compile reports which is submitted to Client’s representatives during monthly review meeting.
  • Duke Offshore Ltd - India
    Joining As Engineer And Promoted To Dy Manager
    Duke Offshore Ltd - India May 1995 - Nov 1997
    Bombay High Off Shore Project
    1.Worked as Engineer for Annual Maintenance contract of all the fire fighting Sprinkler & Utility System of all the Unman platform under the South & North field Area at Bombay High of M/s ONGC.2.Worked as Dy.Manager for Offshore Hook-up & Commissioning the Central Processing Platform at South Basin gas field Area at Bombay High & finally handover the project within the time,involved in this project Onshore Prefabrication and final Commissioning activity at Offshore in different type of materiel like Nace (C.S A-106 Gr-B) for Riser & S.S (ASTM-312) for permanent Well Fluid Flow Arms,Manifold installation,Flare installation & Deck extension,also involved for Nitrogen Purging,Gauging,Flooding,Pigging,Hydro-testing.

Samir Banerjee Education Details

Frequently Asked Questions about Samir Banerjee

What company does Samir Banerjee work for?

Samir Banerjee works for Esteem Project Pvt Ltd.

What is Samir Banerjee's role at the current company?

Samir Banerjee's current role is RCM at Resonance Energy Private Limited.

What schools did Samir Banerjee attend?

Samir Banerjee attended Northern Institute Of Engineering Technical Campus (Niet), West Bengal State Council For Science And Technology 243.

Not the Samir Banerjee you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.