Steven Anderson, P Eng.
AeroLeads people directory · profile

Steven Anderson, P Eng. Email & Phone Number

Sr. Completions Manager at HighPeak Energy
Location: Houston, Texas, United States 13 work roles 1 school
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Sr. Completions Manager
Location
Houston, Texas, United States
Company size

Who is Steven Anderson, P Eng.? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Steven Anderson, P Eng. is listed as Sr. Completions Manager at HighPeak Energy, a with 11 employees, based in Houston, Texas, United States. AeroLeads shows a matched LinkedIn profile for Steven Anderson, P Eng..

Steven Anderson, P Eng. previously worked as Completions Manager at Highpeak Energy and Completions Engineer at Highpeak Energy. Steven Anderson, P Eng. holds Bachelor Of Science - Bs, Mechanical Engineering - Mechanical Engineering Co-Op Program (Requires Five Internships) from University Of Victoria.

Company email context

Email format at HighPeak Energy

This section adds company-level context without repeating Steven Anderson, P Eng.'s masked contact details.

HighPeak Energy

Review company-level records connected to Steven Anderson, P Eng. before choosing the right outreach path.

Profile bio

About Steven Anderson, P Eng.

A data and solutions driven SENIOR OPERATIONS PROFESSIONAL specializing in the energy/oil and gas sector, with extensive experience in operations management, production, completions, procurement and supply chain facilities and construction, EHS ,and project/strategic planning and staff development. Parlays extensive experience, including international assignments as an engineer, to promote peak productivity and plan for future growth. Works to empower staff to enhance key metrics, with a focus on cost control, output, and overall efficiency. Proven success managing multidisciplinary teams to achieve stretch targets. • Work Process Analysis• Risk Assessment• Change Management • Asset Optimization• Asset and Operating Integrity• Field Development• Maintenance Management• Regulatory Compliance• P&L Oversight• Budgets/Cost Control•

Current workplace

Steven Anderson, P Eng.'s current company

Company context helps verify the profile and gives searchers a useful next step.

HighPeak Energy
Highpeak Energy
Sr. Completions Manager
fort worth, texas, united states
Employees
11
AeroLeads page
13 roles · 27 years

Steven Anderson, P Eng. work experience

A career timeline built from the work history available for this profile.

Sr. Completions Manager

Current

Houston, Texas, United States

Aug 2023 - Present

Completions Manager

Houston, Texas, United States

Aug 2022 - Aug 2023

Completions Engineer

Houston, Texas, United States

Jun 2022 - Aug 2022

Senior Operations Manager - Eagle Ford

Houston, Texas, United States

Managed completions, production, facilities & construction, procurement & supply chain, and EHS. Led multidisciplined teams with delineation of Eagle Ford and Austin Chalk wells, with wells continuing to exceed expectations and exhibit strong commercial economics. Guided operational and supply chain management teams in negotiating prices and improving logistics for all processes and materials. Built a positive work environment to ensure safe work practices and high morale with zero recordables. Fostered a culture of cross-functional collaboration to ensure team development and asset optimization.• Transformed company into Eagle Ford low-cost operator, reducing LOE from high of $0.39/Mcfe to low of $0.15/Mcfe.• Increased liquids production from 16% to 28% while keeping LOE at historic lows in heavy paraffin and sour environments.• Guided production volumes to high end of guidance quarter over quarter since 2019.• Identified, prioritized, budgeted, and conducted post-appraisal reviews of high rate of return workovers, facility optimizations, artificial lift installations, and other production enhancement techniques to elevate/support base, arrest decline, and lower field operating costs. • Built and facilitated culture of safety across multiple disciplines. Slashed TRIR from rate of 0.38 to zero.• Cut completion costs by 17% from 2021 to 2020, 13% from 2019 to 2020, and 26% from 2019 to 2018.• Collaborated with all company functions to bring on six wells, each with 10,000ft laterals, from farm-in to turn to sales in just six months, achieving a peak rate of 100MMcf/d.• Improved all aspects of Completions cycle times: pumping efficiency increased 12%/year, stages/day increased 7%/year, stimulated ft/day increased 7%, swap times decreased 50% from 2019 to 2021, and non-productive time on pad decreased 45% from 2019 to 2022.• Set pumping efficiency records in 2021 including Daily Pump Efficiency Record of 85.5% and Pad Pumping Efficiency Record of 80.1%.

Apr 2019 - May 2022

Operations Manager

Fort Worth, Texas, United States

Oversaw completions, production, and reserves. Managed corporate reserves database consisting of 266 proved producing wells, 59 proved non-producing wells, 122 proved undeveloped wells, 69 probable undeveloped wells, and 227 possible undeveloped wells. Updated corporate reserves on bimonthly basis, utilizing PHDwin. Updated Drill Schedule, most recent SEC Differential Pricing, applicable NYMEX Strip, and most current internal data from regulatory, land, and geology. Oversaw daily production of 6,600bbls of gross oil, 12,200mcf of gross gas, and 6,800bbls of gross water. Led two direct and ten indirect reports. Established biannual well reviews with all reservoir, production, and lease operating staff present. Developed and stewarded biannual failure reviews involving the production manager, production engineers, production superintendent, and lead lease operators as well as representatives from chemical, artificial lift, and compression. • Instrumental in securing $250 million loan to fund future operations by ensuring reserves database remained accurate and team updated and adjusted accordingly.• Presented compression consolidation project to foster and facilitate removal of nine compressors on multi-well pads, resulting in $24,800-per-month LOE reduction.• Utilized clarifier, circulating pumps, and best practices to reduce barrels of skim oil per month from 450 to 100. • Reduced compressor downtime from 900 hours month in November to less than 400 hours per month in less than six months.• Decreased total number of rejected loads of oil from average of 51 per month to less than 21 per month through utilization of circulating pumps while driving implementation of best practices.

2018 - 2019 ~1 yr

Completions Manager

Fort Worth, Texas, United States

Designed, modeled, and completed company’s first full slickwater Eagle Ford frac, placing 21 million pounds of proppant along 6,100ft. lateral (3,500#/ft). Named M&A team lead, coordinating land, regulatory, geology, reservoir, drilling, midstream, construction, and completions disciplines in evaluation and recommendation of external assets. Designed, modeled, completed, and tested the Glenn Rose, Buda, and Georgetown formations in 13,500-foot vertical well to determine economic viability of said formations within lease hold. Named pre-land quality control team lead, coordinating land, legal, reservoir, geology, and operations-based disciplines to address obstacles inherent with future wells.Presented research conducted on virtues of various proppant technologies, including FlowPro, Oil Plus, AquaBond, and Resin Coated 100 Mesh, to leadership team. Engaged leadership team in discussion of subject of refracs, including research on systems to include gel block (chemical packer) liner system, degradable particulate diverters, and straddle packer systems. Completed PHDwin reserves training and acted as reservoir engineer in addition to completions manager. • Researched and successfully incorporated dissolvable frac plug technology into completions portfolio, with total of 112 plugs utilized in three laterals in areas of known low-bottom-hole pressures. Drove implementation of dissolvable plugs to eliminate high-risk need for post-frac coiled tubing drillouts.• Researched and presented bulk proppant pricing programs to help reduce future proppant costs. • Reduced completions costs while increasing pound per foot of proppant placed.

2015 - 2018 ~3 yrs

Production Manager

Dallas, Texas, United States

Oversaw average daily oil equivalent production of 20,000boe/d from Haynesville, Eagle Ford, and Delaware Basin of Permian. Established repeatable record of compliance by utilizing biannual FLIR camera inspections at all production facilities. Spearheaded implementation of Merrick Production Manager software to assist staff with field data capture, hydrocarbon accounting, reporting, analytics, and technical data management. Implemented and facilitated office and field staff weekly operations meetings. Formalized rotating crew handovers, monthly LOE reviews, quarterly compression requirement meetings, and quarterly well reviews. • Brought 21 production locations into regulatory compliance by utilizing high-pressure and low-pressure controls.• Utilized $1.5 million for regulatory compliance conversions to realize $4.5 million/year in recovered fugitive emissions.

2014 - 2015 ~1 yr

Production Superintendent

Dallas-Fort Worth Metroplex, Texas, Usa

Managed 1bcf/d of natural gas production. Oversaw 1,425 wells in various stages of completion. Supervised 18 direct and 61 indirect reports. Standardized design of all production surface facilities, including wellhead configuration when utilizing artificial lift methods of gas lift and plunger lift. Ensured field-wide compliance with EPA Subpart W and OOOO prior to September 2013 deadline. • Fostered culture of safety, improving on metrics to include TRIR, motor vehicle accidents, and spills/releases. • Reduced LOE to $0.27/mcf – lowest level to date – by utilizing more efficient means of artificial lift, standardizing production equipment, rebidding contracted work, streamlining internal processes, and organizing monthly LOE review with corporate accountants to ensure correct allocation of charges. • Discovered $1 billion in incorrectly invoiced LOEs during 2013 calendar year, corresponding to companywide average field LOE reduction of 33%. • Rebid water hauling services across play, saving additional $650,000 per year. • Coordinated conversion of 13 high-BTU pad sites (43 wells in total) to capture previously unrealized condensate production (approximately 30bbls per week). • Utilized bio-filters to manage emissions from high-BTU pad sites, saving~$1.3 million in facility conversion costs across 13 sites. • Consolidated DFW and Tarrant field offices, saving $125,000 per year in redundant operating costs. • Reworked internal and third-party safety system testing among all production foreman and respective AOR, eventually resulting in $1.5 million in annual savings.

2013 - 2014 ~1 yr

Production Superintendent

Grapevine, Texas, United States

Accountable for 543 wells in various stages of completion and located in eight different cities (35 completing, one drilling, 464 producing, 21 waiting on completion, and 13 waiting on pipeline). Led seven direct reports, including intern, technician, and construction foreman. Managed 30 indirect reports. Established rebuild yard for lease operators to rebuild valves in effort to reduce LOE. Oversaw operational activity consisting of two drilling rigs, three workover rigs, and one frac crew. Organized on-site training of Grand Prairie Fire Department. Met with Mayor Cluck of Arlington, Texas to discuss operations and emergency response protocol.Reorganized lease operator routes to decrease response time in event of emergency as well as decrease miles traveled and more evenly distribute well count per lease operator. Worked to decrease lease operating expenses through well optimization techniques, with 93 compressors removed due to plunger lift installations. • Determined and highlighted areas of waste within daily operations of DFW Field Office, realizing $60,000 per year in savings and additional $36,000 in credits. • Saved $338,000 per month in lifting costs via ongoing LOE reduction efforts. • Established four new production records, with current production record of 397,654mcf/d.• Built economic/business case to support changing company’s current surface facility construction procedure, helping to save $2 million per 15-well pad.• Established number of pad site improvements to increase safety and optimize production as well as save $2,500 per well (equated to a total estimated savings of $215,000 over one-year span).• Drove rebid contracts for flowback and well testing (saving $476,000 per year); construction, repairs, and maintenance crews (saving $800,000 per year); construction, repairs, and maintenance supplies (saving $1.2 million per year); and water haulers (saving $2.3 million per year).

2011 - 2013 ~2 yrs

Asset Manager

Oklahoma City, Oklahoma, United States

Designed 100 fracture stimulations per year for multistage horizontal shale wells. Averaged drilling rig count of greater than seven rigs during three years as asset manager. Coordinated with reservoir, land, drilling, and pipeline area development for expansion. Produced guidelines for field on correct methods for pressure testing wireline pressure control equipment. Conducted remedial work on saltwater disposal well to stop watering out of adjacent wells. Researched use of X-Span casing patch technology as substitute for HOMCO expandable casing patch systems and expandable liner systems used for refracking and squeeze/DV tool isolation.

2008 - 2011 ~3 yrs

Completions Engineer

Calgary, Alberta, Canada

Provided technical support to multidisciplined development and exploration asset team. Participated in development and implementation of leading-edge completion and well intervention techniques. Conducted operations by utilizing coiled tubing embedded with fiber optics to record heat signature of deviated carbonate reservoir to assess effectiveness of acid stimulations. Investigated both retrievable and tubing-conveyed subsurface safety valves to determine most suitable valve for critical sour operations. Field-tested and implemented cased hole inspection logging suit to best address production casing integrity concerns.

2005 - 2008 ~3 yrs

Senior Field Engineer

Ciudad-Del-Carmen, Campeche, Mexico

Led and managed crew of four with zero safety incidents during tenure in Mexico. Introduced and established use of through-tubing mechanically set cement retainers in completion operations. Trained and mentored fellow field engineers on correct operation of high-resolution, high-temperature pressure/temperature gauges for use in pressure/temperature surveys. Completed 103-hour pressure and temperature survey in 5,600 meter-deep well with 6,500psi wellhead pressure. Set mechanical cement retainer in well with 2,000psi head pressure. Performed 200-plus explosive runs. Completed 4,200-meter reverse cut and thread operation.

2003 - 2005 ~2 yrs

Junior/Senior Field Engineer

Balikpapan, East Kalimantan, Indonesia

Managed crew of four with zero safety incidents during tenure in Indonesia. Completed first-ever cement bond log and ultrasonic image campaign on tension legged platform in 500-meter deep water. Facilitated proper transportation, storage, inventory, and usage of radioactive sources. Performed REW operations in presence of 7,000psi well pressures while using explosives and radioactive sources. Named active member of loss prevention team and ensured quality, health, and safety of both employees and environment. Supervised approximately $3 million of equipment during each offshore operation.

2000 - 2003 ~3 yrs
Team & coworkers

Colleagues at HighPeak Energy

Other employees you can reach at highpeakenergy.com. View company contacts for 11 employees →

1 education record

Steven Anderson, P Eng. education

  • University Of Victoria
    Mechanical Engineering - Mechanical Engineering Co-Op Program (Requires Five Internships)
FAQ

Frequently asked questions about Steven Anderson, P Eng.

Quick answers generated from the profile data available on this page.

What company does Steven Anderson, P Eng. work for?

Steven Anderson, P Eng. works for HighPeak Energy.

What is Steven Anderson, P Eng.'s role at HighPeak Energy?

Steven Anderson, P Eng. is listed as Sr. Completions Manager at HighPeak Energy.

Where is Steven Anderson, P Eng. based?

Steven Anderson, P Eng. is based in Houston, Texas, United States while working with HighPeak Energy.

What companies has Steven Anderson, P Eng. worked for?

Steven Anderson, P Eng. has worked for Highpeak Energy, Silverbow Resources, Md America Energy, Llc, Matador Resources Company, and Chesapeake Energy.

Who are Steven Anderson, P Eng.'s colleagues at HighPeak Energy?

Steven Anderson, P Eng.'s colleagues at HighPeak Energy include Nathan Carpenter, Alexander Torres, Connie Forbes, Taylor Rogers, and Aaron Garrison.

How can I contact Steven Anderson, P Eng.?

You can use AeroLeads to view verified contact signals for Steven Anderson, P Eng. at HighPeak Energy, including work email, phone, and LinkedIn data when available.

What schools did Steven Anderson, P Eng. attend?

Steven Anderson, P Eng. holds Bachelor Of Science - Bs, Mechanical Engineering - Mechanical Engineering Co-Op Program (Requires Five Internships) from University Of Victoria.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Steven Anderson, P Eng. you were looking for.

View similar profiles