Sankar Ram
AeroLeads people directory · profile

Sankar Ram Email & Phone Number

DIPLOMA MECHANICAL I CSWIP - 3.1 I QMS 9001 - 2015 I ASNT LEVEL II - PT, RT, MT & UT I SAUDI ARAMCO ( SAP # 80016373 ) PIPING, WELDING, NDT CBT CERTIFIED
Location: Kendujhar, Odisha, India 6 work roles 1 school
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 71%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
DIPLOMA MECHANICAL I CSWIP - 3.1 I QMS 9001 - 2015 I ASNT LEVEL II - PT, RT, MT & UT I SAUDI ARAMCO ( SAP # 80016373 ) PIPING, WELDING, NDT CBT CERTIFIED
Location
Kendujhar, Odisha, India

Who is Sankar Ram? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Sankar Ram is listed as DIPLOMA MECHANICAL I CSWIP - 3.1 I QMS 9001 - 2015 I ASNT LEVEL II - PT, RT, MT & UT I SAUDI ARAMCO ( SAP # 80016373 ) PIPING, WELDING, NDT CBT CERTIFIED based in Kendujhar, Odisha, India. AeroLeads shows a matched LinkedIn profile for Sankar Ram.

Sankar Ram previously worked as QA/QC MECHANICAL INSPECTOR at C.A.T. Group and QA/QC Engineer at A.A. Patel. Sankar Ram holds Mechanical Engineering, 1St Division from Orissa School Of Mining Engineering Keonjhar.

Profile bio

About Sankar Ram

Dear Sir,

6 roles

Sankar Ram work experience

A career timeline built from the work history available for this profile.

Qa/Qc Mechanical Inspector

Eastern, Saudi Arabia

 Ensure that project specifications, procedures and related documents are accessible, reviewed and understood, before commencing the work. Inspection as per the project specification, international code, and standard. Co-ordinate and send request for inspection (RFl) to client and third-party inspector as per ITP.  Pressure Test package preparation and review based on requirements of project specification. Verification of welding consumable storage and handling practice like storage, baking, or re-backing as per the project requirement.  Fit up and weld visual inspection.  Check, verify /review fabricated /erected or installed lines as per latest ISO –drawing for construction and coordinating with client inspection department at various stages of activities. Monitor the performance of a welder and maintain proper documentation regarding welder continuity.  Co-ordinate with NDT third party and NDT inspectors for tests like RT, UT, PT, MT, PMI, HT. Familiar with flange joint inspection, valve installation, support verification, orifice plate installation, strainer, and spring support installation. Familiar with pre-test punch listing as per latest isometric drawing and P&ID and closing of punch items. Review of all crossing drawings and confirmation of WT range as per approved alignment sheet. Lowering package review for lowering clearance. Trench inspection for before lowering and ensure the HDPE sheet laying at required power line crossing. Witness of pressure testing and manifold testing. Familiar with Drying and Lay-up as per project requirements. Familiar with reinstatement activities. Coordinate with the client in all technically related issued and resolve the quality technical issues by coordinating with the concerned discipline. Inspect leak test as per project specifications and monitor piping systems preservation.

Oct 2021 - Nov 2023

Qa/Qc Engineer

A.A. Patel

Gujarat, India

 Ensure that project specifications, procedures and related documents are accessible, reviewed and understood, before commencing the work. Inspection as per the project specification, international code, and standard. Co-ordinate and send request for inspection (RFl) to client and third-party inspector as per ITP.  Quality check on the material and installation as per the quality specifications/ manual and client quality standards and requirements. Ensure material preservation and traceability before and after fabrication as per quality procedure and client requirements. Also working of MS structure & support fabrication & erection activity. To handle a division/unit independently having about 60 workers’ team of designated fitter, rigger, welder, helper etc. To take total responsibilities like manpower handling, communication with all plant HOD and engineer staff. To take all work responsibilities, to take care about safety rules and regulation, discussing with plant HOD, purchasing, requirements etc. How to achieve production target as per schedule in time limit Also. Also responsibilities of quality checks as per standards and client requirements. To take care about safety standard, rules & regulation as per OSHO standard, etc.( also as per client requirement). Also take care about material management, inventory control, etc. Daily to daily discussion & reporting to company proprietor. Preparation and updating inspection records, communicating with related departments for corrective and preventive actions.  Vendor & subcontract Co-ordination and inspection, evaluation of vendor capabilities.  Perform quality surveillance at supplier premises to confirm contract requirements independently or instruct third party inspector. Follow up on non-conformances. Request corrective action to eliminate cause of deviations. Perform expediting intervention at supplier premises to confirm agreed contractual dates.

Dec 2019 - Sep 2021

Qa/Qc Piping Inspector. (Saudi Aramco Approve)

Petro Rabigh (Cp3/4 Project) (Aramco Project) Saudi Arab

 Review of inspection and Test plan (QAP) per QC-Procedure, Client Specification and Approved Drawing.  Review of the project scope of work, material specifications, and drawings for any conflict with the requirement of the Quality standards and advise the Engineering Dept. to initiate the corrective actions with the client prior to commencement of work. Inspection of Pipe Laying, spool Erection and Installation on pipe racks and sleeper ways. Receiving inspection of raw material, Pipe and pipe fittings which is using in piping work. Inspection of Tie in work like valve Installation, flange joint inspection, flange faces inspection. Review of hydro test package And verify all equipment calibration.  Arrange all documents which one needed in Pressure test .and check list attached In Pressure test package as per quality inspection. Inspection and testing of safety relief devices. Preparation of test pack and witnessing of pressure test. Verification of package punches lists and preparation of Quality dossiers. After hydro test witnessing the piping lay- up. Verifying all punches should be clear before piping Re-instatement and final test limit bolt tightening. After completion of every work in pressure test and visual test submitted that test package to the project inspection department for signature. Inspection of weld joints. Preparation of daily welding report Interpretation of radiography films as per applicable code. Monitoring of Preheating/ Post heating / post weld heat treatment and electrode backing activities. Witness the Welding for establishing PQR for welding processes GTAW, SMAW. Accountable for preparing NDT plan, seam-wise check list. Review subcontractors welding procedures and ensure compliance to the Client specification. Coordinating for the preparation of project specific Procedures, Work Instructions and Quality Plans as required and issue as per the Subcontractor Quality System Procedures.

Apr 2015 - May 2017

Qa/Qc Piping Inspector. (Saudi Aramco Approve)

Shyabah Package4(Gosp1) Increase Gas Handling Capacity(Aramco Project)Saudi Arab

 Review of Quality Control procedures / Method Statement of various disciplines and comment / recommend for development, if required, to comply the requirements of Codes and or specification.  Ensure that all Quality Control activities on shop / site are fully implemented and maintained throughout all stages of contract execution in accordance with Project Specifications and Code requirements.  Review Welding Procedure Specifications (WPS), Procedure Qualification Records (PQR)  Advise the sub-contractor for the proper selection of test coupons for the PQR & WQT, conduct/witness procedure qualification testing and welder's qualification testing.  Constant monitoring and control of shop & field welding activities for Structural, Piping and its material verification, pre-weld inspection, pre-heating, application of approved welding procedure, extent of welder's qualification, proper storage/handling of welding consumables, in-process welding surveillance, welders performance. Control non-conforming work activities through the implementation of the non-conformance control procedure. If occurs, initiate in raising NCR, discrepancy reports, site inspection reports, and site instruction reports on structural, pipe work fabrication and installation.  Responsible for the close-out of the field discrepancy& non-conformance reports (NCR).  Resolutions & Technical advices to the technical queries (TQ) rose by the sub-contractors.  Coordinates and schedules the quality inspection and testing with Construction Team.  Determine the need for inspection tools & equipment, establishes proper calibration parameters for these items.  Perform inspection, examination and test as required by quality procedures.  Review and Approval of Sub Contractor's Piping Test Packages.  Witness / Accept piping leak testing (hydro / pneumatic) as per project requirement.

May 2013 - Mar 2015

Qa/Qc Engineer

Gas Treatment Unit (Gtu) Of South Yoloten Gas Development,Turkministan

 Perform inspection activities, non-destructive testing, repair, rerating, retirement thickness and corrosion rate calculations, remaining life calculations and of pressure vessels, heat exchangers, process columns, piping, tank and other plant equipment.  Carrying out Fitness For Service calculation as per API for various plant equipment.  Developing inspection plans/frequencies for process plant equipment inspection as per API. Internal and external inspection carried out on heat exchangers, pressure vessels, fired heaters, columns and tanks. Well conversant with use of various inspection tools like pit gages, boroscopes, infrared camera, etc.  Preparing inspection reports, pre and post T&I reports, after every inspection with detailed analysis and recommendations.  Carrying out survey for CUI (corrosion under insulation) of entire plant complex as per API along with preparation of reports with recommendations.  Witnessing hydrostatic pneumatic tests on static equipment to check integrity of equipment.  Experience in all types of NDT Inspection like UT, DP, MP, RT, and advanced NDTs for determining defects, corrosion, mechanical damage etc.  Carrying out welding inspection during and after repair welding of existing pipes, tanks and pressure vessels. Reviewing welder performance and welding procedure qualification records.  Preparing and issuing WPS for GTAW and SMAW process for various materials like Carbon steel, Low Alloy steels, Stainless steels, Inconel, Aluminum alloys. Preparing failure analysis reports for equipment breakdown based on metallographic studies, corrosion mechanism study, material identification and provide necessary recommendations.  Review & Approval of the Test Packages and procedures of subcontractors for testing.  Witness of Hydro test for Piping, static equipment and Leak test for pressure vessels as per Company specifications.

May 2012 - Apr 2013

: Trainee Qa/Qc Engineer.

Vishal Engineering & Construction Private Limited

R.P.L. Ghansali, Navimubai

Job Profile Review of inspection and Test plan (QAP) per QC-Procedure, Client Specification and Approved Drawing.  Review of the project scope of work, material specifications, and drawings for any conflict with the requirement of the Quality standards and advise the Engineering Depth to initiate the corrective actions with the client prior to commencement of work. Preparation of manufacturing and quality documentation for fabrication of heat exchanger products. Conduct technical validation of the offers with regards to quality. Identify and specify project and country specific requirements to engineering team. Initiate or conduct supplier qualifications process. Perform quality surveillance at supplier premises to confirm contract requirements independently or instruct third party inspector. Follow up on non-conformances. Request corrective action to eliminate cause of deviations. Perform expediting intervention at supplier premises to confirm agreed contractual dates. Review of supplier’s procedures, quality documentation, welding book and End of manufacturing report. Maintain set of standard quality control requirements for heat exchangers. Co-ordination with client or TPI or Contractor. Carry out internal audit of related shops and office. Preparation of QC Report. Witness & Review of all documents prior to Pneumatic testing & Hydro testing,& documentation of the same. Surveillance activities at fabricators and monitors compliance to approved quality plan.  Ensure piping scope is managed in accordance with the test and inspection Plan (TIP) process.

Feb 2010 - Mar 2012
1 education record

Sankar Ram education

FAQ

Frequently asked questions about Sankar Ram

Quick answers generated from the profile data available on this page.

What is Sankar Ram's role at their current company?

Sankar Ram is listed as DIPLOMA MECHANICAL I CSWIP - 3.1 I QMS 9001 - 2015 I ASNT LEVEL II - PT, RT, MT & UT I SAUDI ARAMCO ( SAP # 80016373 ) PIPING, WELDING, NDT CBT CERTIFIED.

Where is Sankar Ram based?

Sankar Ram is based in Kendujhar, Odisha, India.

What companies has Sankar Ram worked for?

Sankar Ram has worked for C.A.T. Group, A.A. Patel, Jcc China Petroleum 中油吉林化建, Ilk Construction Co., and Vishal Engineering & Construction Private Limited.

How can I contact Sankar Ram?

You can use AeroLeads to view verified contact signals for Sankar Ram, including work email, phone, and LinkedIn data when available.

What schools did Sankar Ram attend?

Sankar Ram holds Mechanical Engineering, 1St Division from Orissa School Of Mining Engineering Keonjhar.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Sankar Ram you were looking for.

View similar profiles