Pipeline And Riser Engineer
Riser Concept Development Study for Deepwaters, Statoil Oct 2014 – June 2015• Design and In-place Analysis of Steel Catenary Riser (SCR), Steel Lazy Wave Riser (SLWR), Flexible Risers and Catenary Offset Buoyant Riser Arrangement• Fatigue & Non-Linear Time domain extreme analysis of risers.• Riser Concept Evaluation for deep waters in Harsh Environment, Gulf of Mexico and West Africa.• Developed a new riser concept for Dis-connectable Turret moored FPSO in Harsh environment – Improvised Steel Lazy Wave Riser that can withstand large content density variation.• Worked on a concept to reduce payloads of steel lazy wave risers.• Installation operation schedule, Riser concept costing, Detailed report presentation and concept presentation to client. Tommeliten, Conoco Philips - Pipe in Pipe Flowline Study Jan – Mar, 2015• Installation method statement for a reelable electrically trace heated ‘Pipe in Pipe’ flowline• Preliminary installation analysis and Evaluation of various installation options.Lianzi, Chevron, Angola - 6” Gas line with Inline Structures July - Oct, 2014• Development of Limiting sea state matrix for a wide range of installation depths.• Extensive fatigue analysis and Installation analysis of large Inline Structure Installation.Valhall, BP – Retrieval of a 6” Produced Water Hose Oct 2013 – Feb 2014• Analysis for retrieval of a water hose hanging from a platform through subsea transfer using platform crane and vessel crane and reeling on to a Togi reel aboard the vessel.Tendors and Studies (July 2013 - July 2015)Preliminary Installation analysis inputs for numerous tenders and studies for Rigid Pipelines, Flexibles, Umbilicals and other end structures.Tools: Orcaflex, Riflex, VIVANA (DNV SIMO), AutoCAD, Mathcad, MS Office Suite Offshore Campaigns: 3 offshore campaigns spanning 7 weeks with 2 involving reeled rigid pipeline installation.