Lead Loss Prevention Engineer
India
2023-2024 Maleeha Phase II -New Gas Treatment Plant-Egypt Lead Engineer – Safety & Risk Responsible for client meeting, project management, review and preparation of Schedule, Philosophy, reports, MR/TR, P&ID, layouts. • Philosophy: F&G, HSE, Active & Passive Fire Protection, HAZID closeout Report. • Reports: Fire Water Demand Calculation, Fire Water Hydraulic Calculation, Fire Proofing Calculation based on FERA/ API 2218, Safety Distance verification, HAZID, HAZOP Closed Out, FERA report study, COSHH Assessment, F&G Cause & Effect Chart.• P&ID: Fire pump Room, fire water storage tank, Fire Water Network, Foam water network, MV Water spray system`s for Vessel Storge protection, Foam water Spay system for Equipment Protection, Safety Shower & Eyewash.•Documents: TQ, TR, TC, VDR document, interdisciplinary document related to process safety. •Layouts: HAC, Fire Zones, Safety Signs, F&G, Escape route, Fire Protection System Master Plan, Evacuation & Rescue Analysis (EEERA)• Line-In list for Active Fire protection system2023-2024 Sour Gas Treatment Facility (SGTF)-Maj noon-IraqLead Engineer – Safety & Risk SGTF is a brown field project, responsible for client meeting, consultant meeting, project management, review and preparation of Schedule, Philosophy, reports, MR/TR. • Reports: Technical Safety Studies’ plan, TOR for HAZID, TOR for HAZOP, TOR for SIL, Control of Substances Hazardous to Health (COSHH) Assessment. SIL Study, HAZID Closeout, HAZOP Closed Out, FERA report study, HAC Schedule based on EI-15 & API, Consultant report review for HSE Studies, RAM Study, Noise Assessment Study. F&G Mapping (3D), Vent Dispersion Study, QRA (including Alarm Demonstration), Physical effect Modelling, Escape, Evacuation & Rescue Assessment (EERA), F&G Cause & Effect Chart. SOW, RFQ, I&C, ToR for QRA, PEM & EERA, HEMP Tracking Register, TQ, TC, VDR document, interdisciplinary document related to process safety. Layouts: HAC, Fire Zones, Safety Signs, F&G, EERA