Scott Parker, Pe Email & Phone Number
Who is Scott Parker, Pe? Overview
A concise factual answer block for searchers comparing this professional profile.
Scott Parker, Pe is listed as Senior Engineer at NewFields Mining Design & Technical Services, LLC, a company with 63 employees, based in Woodland Park, Colorado, United States. AeroLeads shows a matched LinkedIn profile for Scott Parker, Pe.
Scott Parker, Pe previously worked as Senior Engineer at Newfields and Staff Engineer at Catamount Engineering. Scott Parker, Pe holds Civil Engineering, Civil Engineering from Metropolitan State University Of Denver.
Email format at NewFields Mining Design & Technical Services, LLC
This section adds company-level context without repeating Scott Parker, Pe's masked contact details.
Review company-level records connected to Scott Parker, Pe before choosing the right outreach path.
About Scott Parker, Pe
Over 15 years of experience in technical roles and over 11 years of supervision roles on civil and environmental projects in the areas of environmental health and safety, project engineering, project management, design, construction, transportation, foundation and retention systems, dams and dam rehabilitation, mining (including arctic and non-arctic heap leach facilities), tailings disposal and water diversion, and permitting (design, engineering management, state submittals, construction, inspection). MSHA experience (including multiple years of mine-oriented contractor site and safety training), safety protocol oriented, and career incident free. Corporate supply chain experience (JDE/Oracle software), bid development and management; requisitions and shipping; schedule, delivery, and storage). August 2019 to October 2021; shifted focus from professional to personal, chose to stay home and help manage our young family.Cajamarca, Peru - Conga Project / Yanacocha Mine (2011-2013)Constancia Copper Mine Project - Cuzco Region, Peru (2011-2013) Complete mine startup preliminary and feasibility phases. Segovia, Columbia - Gran Colombia Gold - Antioquia, Colombia (2013-2014) Complete solo mine startup preliminary phase investigation. Gramalote Project- Anglo Gold Ashanti/B2Gold - Antioquia, Colombia (2013-2015) Complete coordination of geotechnical aspects of mine startup preliminary and feasibility phases of investigations. Directed subsurface investigation program related to various mining facility foundation developments (Tailings storage facility, waste rock dumps, rail transport, and ponds). Trained (3) newly hired Colombian engineers (in project) for all aspects of geotechnical assessment. Responsible for guiding test Pits, soil, rock (RMR/RQD) designations and logging, geologic mapping, waste rock and tailings material sampling. Responsible for collection of samples and management of shipment for US based laboratory testing. Guided geophysical bedrock assessment. Directed in-situ sampling and shipment of dynamic cyclic shear testing samples.Fairbanks, AK - Fort Knox Gold Mine - Tailings Storage Facility Raise and Walter Creek Heap Leach Pad Expansion Projects (2014-2016)Supervision of annual raise of Tailings Storage Facility construction. Performed supervision of Heap Leach Facility expansions.Round Mountain, NV – Gold Mine - West 6A Heap leach Pad expansion, Tailings Storage Facility Cell A raises, Tailings Storage Facility Cell B (concept to construction), various pipeline projects, various infrastructure improvements. (2014-2016)
Scott Parker, Pe's current company
Company context helps verify the profile and gives searchers a useful next step.
Scott Parker, Pe work experience
A career timeline built from the work history available for this profile.
Senior Engineer
CurrentStaff Engineer
- CAD Design of residential and commercial municipal utility systems (e.g., street, water, sanitary, and storm sewer) across multiple cities (Colorado Springs, Woodland Park) and counties (El Paso, Douglas, Teller).
- Develop various design reports, including, but not limited to: CSWMP, Grading and Erosion Control plans, Street Improvement plans, Detail Grading, Pond Outlet Structure design, and preliminary and final Drainage Report.
- Assess city, county, and state municipal regulations (stormwater, engineering, and land development code research) for the purpose of private and commercial development.
- Coordinate with regional developers, architects, and municipal agencies (e.g., city, county and various water districts) for all applicable aspects of development.
Operations - Chief Home Officer
- Primary Daily Care Provider – Manage multiple schedules for our 2 children (both under 3). Create daily routines with built-in flexibility.
- House Manager – Perform and manage most of house shopping, cooking (including meal preparation), cleaning, and maintenance (including indoor and outdoor).
- Home Remodeling – Designed and constructed multiple remodeling projects for all 4 of our owned homes including, but not limited to: Carpentry, tile, electrical, bathrooms, concrete, gravel, drainage, insulated and.
- Real Estate Development – Developed and implemented real estate approaches to purchase homes and improve for investment. 4 homes in 5 years.
- Family Move Manager – Performed and managed most of the house preparations (including packing, moving, and cleaning) for moving our family from Fairbanks, Alaska to Omaha, Nebraska; and then 21 months later to Woodland.
Capital Projects - Senior Project Engineer
- Barnes Creek Heap Leach Pad Startup – Aided in overseeing all project startup aspects of a new valley fill heap leach facility, including assisting in guiding final design, technical specifications, CQA Construction.
- Gilmore Trail Expansion – Oversaw all project aspects of a trail expansion and relocation along the eastern limits of the FGMI property. Wetland and migratory bird protections required careful attention throughout.
- Various Capital Projects Tasks – Managed all Fort Knox Capital Project requisitions for nearly 2 years. Developed complete construction bid packages (with pay line items and mto’s), solicited, and managed numerous.
Capital Projects - Project Engineer
- Tailings Storage Facility Expansion – Aided in overseeing all project aspects of annual expansion to the Fort Knox tailings storage facility dam, shortened construction season. Established all project requisitions and.
- Walter Creek Heap Leach Expansion – Aided in overseeing all project aspects of an annual expansion and eventual completion of the heap leach facility construction across multiple seasons (~2.1 M sq.ft. of finished heap.
- Heap Leach Expressway w/ Tunnel – Oversaw and designed a new haul road crossing, incorporating a tunnel crossing for loaded 200T haul trucks to cross over the mine access road, from conception to operation. Performed.
Staff-Scientist Engineer Iii
Cajamarca, Peru - Conga Project / Yanacocha Mine (2011-2013)Constancia Copper Mine Project - Cuzco Region, Peru (2011-2013) Complete mine startup preliminary and feasibility phases. Segovia, Columbia - Gran Colombia Gold - Antioquia, Colombia (2013-2014) Complete solo mine startup preliminary phase investigation. Gramalote Project- Anglo Gold.
Staff Engineer
- Confidential Projects, CO and WY, USA
- Performed subsurface investigations, field drilling, sampling, soil classification, and laboratory program design. Work included supervisor/manager roles for coal bed methane water storage reservoirs and Bureau of Land.
- Performed reservoir stability and seepage analyses.
- Management and training of field and laboratory personnel. Managed all laboratory testing equipment, testing procedures, and process control documentation.
- Designed and installed monitoring wells, piezometers, and inclinometers. Performed construction supervision, inspection, quality control, and quality assurance on hundreds of residential, commercial, municipal.
- Experience with soil, rock, mortar, concrete, roadway subgrade; HDPE, LLDPE and GCL liner, and rebar inspection. Designed septic, irrigation, pipeline, roadway, specialty projects (stone columns, foundation and.
Scott Parker, Pe education
Civil Engineering, Civil Engineering
Mechanical Engineering
Frequently asked questions about Scott Parker, Pe
Quick answers generated from the profile data available on this page.
What company does Scott Parker, Pe work for?
Scott Parker, Pe works for NewFields Mining Design & Technical Services, LLC.
What is Scott Parker, Pe's role at NewFields Mining Design & Technical Services, LLC?
Scott Parker, Pe is listed as Senior Engineer at NewFields Mining Design & Technical Services, LLC.
Where is Scott Parker, Pe based?
Scott Parker, Pe is based in Woodland Park, Colorado, United States while working with NewFields Mining Design & Technical Services, LLC.
What companies has Scott Parker, Pe worked for?
Scott Parker, Pe has worked for Newfields Mining Design & Technical Services, Llc, Newfields, Catamount Engineering, Parker Family Development, and Kinross Gold Corporation.
How can I contact Scott Parker, Pe?
You can use AeroLeads to view verified contact signals for Scott Parker, Pe at NewFields Mining Design & Technical Services, LLC, including work email, phone, and LinkedIn data when available.
What schools did Scott Parker, Pe attend?
Scott Parker, Pe holds Civil Engineering, Civil Engineering from Metropolitan State University Of Denver.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Scott Parker, Pe you were looking for.
View similar profiles