With over 26 years of experience in the power transmission sector, I am an accomplished and versatile project manager with a proven track record of delivering high-quality substation and switchyard projects across diverse markets and geographies. As the Asst. General Manager of Project Execution at KALPATARU POWER TRANSMISSION LIMITED (KPTL), I oversee the end-to-end execution of complex and challenging projects, from feasibility studies and engineering design to procurement and commissioning.I have successfully managed multiple projects for prestigious clients such as Société Tunisienne de l'électricité et du gaz, Siemens, and Crescent Power, ensuring timely completion, cost optimization, and customer satisfaction. I have also demonstrated my ability to adapt to different environments and cultures, having worked in Nigeria, Botswana, and Tunisia. I am skilled in project planning, budget management, contract management, risk management, resource management, and team leadership. I am passionate about continuous improvement, innovation, and excellence in the power transmission industry.

Santanu Das's Current Company Details

Asst. General Manager @ KALPATARU POWER TRANSMISSION LIMITED | Expertise in Project Management
Santanu Das Work Experience Details
  • Kalpataru Power Transmission Limited
    Asst. General Manager - Projects, Tli - Substation
    Kalpataru Power Transmission Limited Nov 2017 - Mar 2024
    Tunisia
    Projects (Oct-2021 to Mar-2024):Studies, Manufacturing, Factory Tests, Supply, Civil Engineering, Transport on The Workfront, Assembly, Testing And Commissioning Of Classic HT (AIS) Stations. Client: Société Tunisienne de l'électricité et du gaz (STEG):Responsibilities: Initial responsibility of setting up of facilities and resource, stakeholder identifications. Estimated the cost of construction for all the substations and obtained approval from Top Management. Prepared the construction schedule in line with the AOP of company as well as the project timeline. Identified the risks and estimated the time and cost implications of the risks on projects. Built up communication protocol to ascertain the proper instructions and follow ups can be made through entire duration of the projects.Projects:The Provision of Detailed Engineering Design, Procurement, Construction and Commissioning of 220/132kV Legotlhwane Substation and Associated Works for the North West Transmission Grid Connection Project.Responsibilities: Shouldering the Complete Project Management responsibilities from Post Award to Contractual Closure of the project. Completed design milestone with the design team with active participation towards achieving the reduction in costs. Driving the project with safety and quality even in the stringent constraint of resource availability at North-West of Botswana. Implemented and ensured quality works delivery towards Client’s Satisfaction. Identified the Risks and developed the Risk Mitigation Plan for complying with the Contract Conditions. Managing the civil subcontractor effectively even with severe shortages in resource availability by extending them the timely payments, transferring the knowledge for substation works and so on. Developing the employees from the local citizens to get the work done in line with the Contractual Requirements.
  • Emirates Electrical Engineering Llc
    Site Manager
    Emirates Electrical Engineering Llc Nov 2015 - Jun 2017
    Dubai, United Arab Emirates
    Responsibilities:Initiated the resource requirements, established the project site facilities and obtained the required permits for starting the activities.Prepared detailed manpower, materials & tools requirement and timely raised the Purchase Requisition for just-in-time delivery of the materials at site.Also planned for the Plant & Machineries requirements and made a schedule to engage, monitor and release the plants without incurring additional cost.Directly took the initiative to interact with the Engineering Department and suggested a few changes to be incorporated to save cost and time. In the process, I also interacted with Site Representatives of Client to convince them the changes required.Devised a tool in excel to monitor the cost to control the cost for the local materials and labour and controlling the variation claim by sub-contractors, if any.Ensued timely registering legitimate claims to client for variation due to changes in contract parameters like work scope and time delays etc. In the process I also devised a tool to correctly monitor the site hindrances.Ensured the proper Safety and Quality measures are in place as per the approved HSE & Quality Plan and achieved zero LTI Free time for the last 10 months. Ensured timely submission of Site Measurement Sheets, Invoices, Progress claim of Sub-contractors resulting in achieving the PV.Coordinated between Civil, MEP & FPS related activities leading the team of site engineers to ensure timely completion as per schedule.Coordinated with client's various departments (TED, TCD, TPD etc.) for scheduled start & finish of pre-commissioning and testing activities involving the testing engineers.Ensured world class DEWA Standard of safe work practices and safe work environment involving Safety Officer.
  • Nespak Nigeria Limited
    Project Manager
    Nespak Nigeria Limited Nov 2012 - Oct 2015
    Abuja, Nigeria
    Directed and managed the complete projects except the 3rd Project. which I commissioned almost single-handedly.Made the complete schedule management plan, define the activities, made the activity sequence, estimated the activity resources, estimated the activity durations and developed the complete project schedule.Made the complete cost estimate for the project and derived the budget and the cost management plan as well. Derived the HSE & Quality Plan in line with the company policy and complying with the customer requirement.Made the complete engineering deliverables (Master Drawing List) along with the engineering sub-contractor and got the same approved from client within very reasonable time.Was the first point of reviewing the engineering drawings before submission to client and as a result we got the drawings approved with a very few comments/no comments thus saving precious time in the project duration.During execution stages I mobilised optimal numbers of skilled manpower and thus achieved a cost savings over the initial cost estimate.Also derived the communications management thus enabling proper and timely responses from all the stakeholders reducing considerable time for correspondences.In the actual procurement stages, took the lead for finalisation of technical particulars of different equipment. In this stages I was able to convince and introduce new vendors (complying with GTPs) to Client and thus saved a considerable cost of procurement.Introduced several formats for monitoring and controlling the project progress, quality & safety so that the feedback process is streamlined for meeting desired project timeline.Also identified several risks and developed the risk management plan for mitigating such risk during the tenure of the project. I was appreciated by my upper management for developing such details.Ensured the timely submission of Invoices, certification from Client and payment
  • Sterling And Wilson
    Manager - Projects
    Sterling And Wilson Dec 2010 - Nov 2012
    Kolkata Area, India
    Key Result Areas• Managed 6 small projects including one in Kolkata Metro Rail (value Rs. 19.50 Cr.), cumulative Value of Rs. 38.34 Cr.; before that 19 small projects with cumulative value of Rs. 68.54 Cr.• Conducted technical evaluation of suppliers and ensured conformity with supplier’s drawings • Participated in review meetings and technical discussions with Metro Railway, Kolkata.• Involved in the deployment of manpower and other resources• Supervised the progress with PM Tools, etc. for Metro Railway, KolkataHighlights• Instrumental in finalizing & analysing the specifications of HSCB for Metro Railway• Played a stellar role in monitoring all project related activities from post award period to final hand over of project viz. resource mobilisation, material indenting, drawing approval, contractor deployment, site support, etc.• Successfully ensured timely submission of invoices, meeting of the budgeted turnover with payment collectionProject Undertaken• Eastern Region Projects under Electrical Division
  • Siemens Energy
    Executive - Project Installation
    Siemens Energy Jan 2008 - Nov 2010
    Kolkata Area, India
    Key Result Areas• Executed overall site responsibility as the Site-in-charge and looked after the logistics, resource requirement as well as allocation, meeting procedural / contractual obligations & overall coordination between clients, contractor & regional office• Handled the site with optimal manpower of 2 Supervisors, 1 Safety Officer & 1 Site Commercial• Liaised for materials inflow (materials ordering and transportation in scope of Marketing & CCIL Respectively) for getting the right work done at right timeHighlights• Played a vital role accomplishing:o The 132KV Switchyard Part for Calcom Cements single-handedly including the Civil Supervisiono Record 4.5KM of Cable Tray erection including 30MT of Cable Tray Support Structures in MRSS Building, CCR Building, LC3 Building, LC1 Building within 1 and half montho Instrumentation works including installation of Field Instruments (like ZSS, PCS, BSS, PT etc.), cable laying for PLCs, MCCs etc. and termination for only one Cement Mill as per requirement and readiness by client Finally one Cement Mill had been put in commissioning Since Jul’10Project Undertaken• 132KV Switchyard & E&I Project for 1.73MTPA Clinker Grinding Unit for Calcom Cement India Limited at Lanka (CCIL), Assam with a Project Value of Rs. 42 Crores• BOPE & 132KV Switchyard Package for 30MW Co-generation Power Plant Project at Phillips Carbon Black Limited, Durgapur
  • Areva T&D
    Asst. Manager - Projects
    Areva T&D Apr 2006 - Dec 2007
    Kolkata Area, India
    Role: Site-in-Charge (Assistant Manager – Projects)Project: 132/33 KV New Sub-Station Project at Contai and 132 KV Bay Extension at Egra& New-Haldia under NABARD scheme (WBSETCL erstwhile WBSEB).Responsibilities: Overall responsibility of the Project Execution from Site Mobilization to Commissioning and closure of the project. Work involves managing Site Engineers, Supervisors & Contractors for Site Contour Survey, Land Development and Structural Civil Work for Building, Structure foundation works, electrical equipment erections and all other related works for sub-station. Job involves Planning, Scheduling of Staff, Manpower, Materials and Machineries along with coordination with client for desired output. Additional involvement of Cost Estimation & Drawing as and when required.Achievements: Single handedly completed the Egra & New-Haldia bay extension works including the foundations. Completed all the foundation activities including piling works within eight months at Contai Sub-Stations.
  • Larsen & Toubro Limited
    Engineer (Electrical)
    Larsen & Toubro Limited Aug 1997 - Nov 2005
    Satna Area, India
    Period: March 2005 – November 2005Role: Planning (Scheduling), Procurement & Billing EngineerProject: Satna - Hatta 400KV D/C Transmission Line – 142 KmPeriod: March 2004 – February 2005Role: Planning (Scheduling), Billing & Materials EngineerProject: Indore – Indirasagar 400KV D/C Transmission Line Project – 80KMDuration: August 1997 – February 2004Role: Planning, Scheduling & Contracts EngineerProject: 1. Nandurbar – Jalgaon Railway Electrification Project (Gr. 109) – 149Rkm, 179 Tkm 2. Titwala – Asangaon Railway Dc-Ac Conversion Project 3. Udhna – Nandurbar Railway Electrification Project (Gr. 108) – 162 Rkm, 230 Tkm 4. Jhajha – Mokama Railway Electrification Project (Gr. 96) – 98 Rkm, 215 TkmResponsibilities: Chalked out the logistics and support required from management resulting in improved resource inflow. Also initiated all efforts for resource mobilization, resulting in increased productivity.  Closely monitored day to day progress and feedback from site. Ensured the right support to site at right time to enable the site engineers to achieve the targeted performance. At right time raised the invoices and liquidated the due payments in very short duration keeping the working capitals as low as possible. Used the P&M Vehicles with zero book value to avoid the erosion of site contribution due to depreciation cost to be borne by Project Site. Prepared all monthly MIS Reports such as Monthly Financial Status, ROCE-EVA-GM, Reconciliation of Materials as well as LOA Works quantity, Revenue ledger reconciliation, Supplier & Sub-contractor ledger reconciliation.Achievements: In one month completed 28 foundations for transmission lines while self-supervised the site with the help of 6 sub-contractors in a well-planned manner. Also got certification for all the documents related to those foundations and was able to make invoice for the foundations.

Santanu Das Skills

Substation Power Transmission Power Distribution Project Planning Construction Project Management Client Focused Project Estimation Commissioning Project Engineering Scada Epc Civil Engineering Procurement Vendor Management Electrical Engineering Ms Project Ms Office Autocad Primavera P6 Process Scheduler Materials Management Infrastructure Erp Continuous Improvement Automation Microsoft Project Team Management Management Contract Management Microsoft Office

Santanu Das Education Details

  • Apc Ray Polytechnic
    Apc Ray Polytechnic
    83.8%
  • Calcutta University
    Mathematics, Physics & Chemistry
  • Ramakrishna Mission Vidyalaya, Narendrapur
    Ramakrishna Mission Vidyalaya, Narendrapur
    Madhyamik Examination
  • Ramakrishna Mission Residential College, Narendrapur
    Ramakrishna Mission Residential College, Narendrapur
    First Division

Frequently Asked Questions about Santanu Das

What is Santanu Das's role at the current company?

Santanu Das's current role is Asst. General Manager @ KALPATARU POWER TRANSMISSION LIMITED | Expertise in Project Management.

What is Santanu Das's email address?

Santanu Das's email address is da****@****ail.com

What schools did Santanu Das attend?

Santanu Das attended Apc Ray Polytechnic, Calcutta University, Ramakrishna Mission Vidyalaya, Narendrapur, Ramakrishna Mission Residential College, Narendrapur.

What are some of Santanu Das's interests?

Santanu Das has interest in Digital Photography, Chess.

What skills is Santanu Das known for?

Santanu Das has skills like Substation, Power Transmission, Power Distribution, Project Planning, Construction, Project Management, Client Focused, Project Estimation, Commissioning, Project Engineering, Scada, Epc.

Not the Santanu Das you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.