Deputy Lead Marine Engineer,Naval Arch
Current• CNOOC RC Compliant Piled Platform FEED• CNOOC RC Flexible Riser Third Party Verification. • Trex Delfin Sur Platform Transportation and Installation. • Key technology Study for CCS TianJin for the large offshore structure transportation and installation. • ZOMC/NOBEL Tom Prosser Jack-up Transportation. Responsible for the detail engineering including loading/off-loading and voyage analysis, loading manual documentation.• ZOMC/McDermott DB30 Transportation Project. Responsible for the detail engineering for the McDermott derrick barge DB30 transportation, size inspection and instruction.• Dragados Tekel-a Jacket Engineering. Basic design and detail design of Tekel-A jacket, including: transportation, launch, floatation and upending analyses of the jacket.• Pemex Jacket Design. Provide engineering basic design of 2 jacket (PP-PIT-A and PG/H-PIT-A platforms) for Pemex.• ZPMC Transporting SSCV H206 SEMI. • Anardako Red Hawk Spar Decommissioning Analysis. The topside on the Spar would be lifted off by heave lift vessel and the Spar hull reefs down to the seafloor by flooding its tanks. • DOCKWISE HZ 25-8 DPP Jacket Independent Verification. Involved in the jacket transportation marine analysis, responsible for jacket launch analysis and slamming check. • SHELL Malaysia Malikai TLP Engineering. • CNOOC / RC HZ 25-8 DP Floatover Study. • Savia/San Gabriel Jacket Project. Lead marine engineer. • BPZ/Horton Wison Deepwater Buoyant Tower Floatover Study.