Systems Engineer Ii
Cockeysville, Md
After promotion, continued performance as standards coordinator. Added duties as a RAMS engineer: Tracked KPIs on the Shadow UAS program, including availability, flight time, and failures during training events. Also ran the engineering spares demand model for the Gray Eagle UGCS program.In March 2017, transitioned to the OSRVT program. On PPSS 2017, documented requirements using DOORS, developed behavioral and structural architecture models using SysML in MagicDraw. On both the PPSS 2017 and CLS 2017 projects, and integrated and tested new features as well as performed regression tests using SpiraTest. On an extension to the CLS 2017 project, assessed customer's list of CCIs for RMF and transformed those applicable to system requirements. On the TS-11 SRM project, performed an early integration with Linux software. Worked requirements and architecture changes, and coordinated design-for-ilities and safety discussions between an initial and final PDR. Guided two other systems engineers in their own contributions to the project. Presented at the final PDR. On TS-11 SRM, added EV CAM duties to tasking.Subsequently transitioned to lead systems engineer of a team of 5 systems engineers on OSRVT CLS 2018 as well as CAM, completing final integration and qualification of the 40500-20 baseline. Primary author of the submitted and accepted ECP. After the completion of that project, became OSRVT lead systems engineer (two projects, CLS 2019 and TS-11 SRM) as the 40600-10 development baseline moves toward system integration and subsequent qualification (including CAM duties for both). Regarding the 40500 line, executed the short integration testing of an information assurance update, labeled as the 40500-30 baseline, as well as internal validation of the software upgrade procedure. Primary author of the update's ECP, submitted and accepted by the customer.