Systems Engineer Iii
In preparation for the 40600-10 development baseline, continued to lead the team of engineers during integration and test of the 40600-10 system. Organized, prepared, and delivered a technical report as a CDRL item on TS-11 SRM which documented the differences in the software between the 40500 baseline and the 40600-10 baseline. This concluded the major.