Sudath Pathmal Kularathna
AeroLeads people directory · profile

Sudath Pathmal Kularathna Email & Phone Number

Chief Technology Officer at WKV Group of Companies
Location: Sri Lanka 14 work roles 3 schools
1 work email found @wkvgroup.lk LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email s****@wkvgroup.lk
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Chief Technology Officer
Location
Sri Lanka

Who is Sudath Pathmal Kularathna? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Sudath Pathmal Kularathna is listed as Chief Technology Officer at WKV Group of Companies, based in Sri Lanka. AeroLeads shows a work email signal at wkvgroup.lk and a matched LinkedIn profile for Sudath Pathmal Kularathna.

Sudath Pathmal Kularathna previously worked as Project Manager at Ceylex Engineering Pvt. Ltd. and Project Manager at Ltl Holdings. Sudath Pathmal Kularathna holds Bachelor Of Science - Bs, Mechanical Engineering, First Class Honours Degree from University Of Moratuwa.

Company email context

Email format at WKV Group of Companies

This section adds company-level context without repeating Sudath Pathmal Kularathna's masked contact details.

*@wkvgroup.lk
68% confidence

AeroLeads found 1 current-domain work email signal for Sudath Pathmal Kularathna. Compare company email patterns before reaching out.

Profile bio

About Sudath Pathmal Kularathna

I am an enthusiastic and professional Mechanical Engineer with Managerial experience, who enjoys being part of, as well as leading, a successful and productive team. I am quick to grasp new ideas and concepts, and to develop innovative and creative solutions to problems. I am able to work well on my own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. I started my primary education in St Aloysius College, Ratnapura. Passed GCE OL with distinctions for all subjects and completed my ALs in Colombo Royal College with 3 As and a B becoming 62 in all island rank in 1997.I was passed out from University of Moratuwa with a First Class Honors Degree in the field of Mechanical Engineering. I joined LTL Holdings, in year 2003 and started my professional life as a young mechanical Engineer who is responsible for complete erection of cooling water system, and structure erection of 100MW Heladhanavi Power Plant, Pattalam.After the project I was appointed as an Operation Engineer in the same Power Plant. After four years, I was promoted as the Plant Manager for Lakdhanavi Power Plant, Sapugaskanda. Adding managerial experience to my professional carrier, I was tempered to be a real life Engineer during my two years stay at Lakdhanavi Power Plant.In late 2010 I got the opportunity to be the first Engineer to be deployed to Bangladesh as LTL started its first Power Plant Project for overseas market. We could complete erection and commissioning of 2 x 100MW power Plants within just 9 months.After these two projects, I was appointed as the Project Manager of Vavuniya Kilinochchi Transmission Project Lot A. Even at toughest conditions, we completed the Project with in scheduled time with appreciation from the client, CEB.After this I was involved in almost all Power Plant Projects of the company and time to time participated for bid and offers preparation for Power Plant Projects and MVAC installations.

Listed skills include Commissioning, Power Plants, Engineering, Project Engineering, and 40 others.

Current workplace

Sudath Pathmal Kularathna's current company

Company context helps verify the profile and gives searchers a useful next step.

WKV Group of Companies
Wkv Group Of Companies
Chief Technology Officer
Sri Lanka
AeroLeads page
14 roles

Sudath Pathmal Kularathna work experience

A career timeline built from the work history available for this profile.

Chief Technology Officer

Current

No: 278, 4Th Floor, Access Tower – I, Union Place, Colombo 02, Sri Lanka

I am the Chief Technology Officer of “• WKV Hydro Technics Pvt. Ltd.”, a company mainly engaged in renewable energy sector which owns thirteen mini hydro power plants in Sri Lanka and an ongoing Solar Project at Polonnaruwa District.I am the executive in charge of the engineering department. I am responsible for evaluating and implementing new systems and infrastructure, technological needs as well as research and development (R&D) of Power Plants. Entire operations of all thirteen Mini Hydro Power Plants, their performance monitoring and supervising of planning maintenance activities are my key responsibilities.

Jan 2018 - Present

Project Manager

Ceylex Engineering Pvt. Ltd.

132/33Kv Grid Substation Project At Kegalle And Thulhiriya

Ceylex Engineering Pvt Ltd which is formerly known as LTL Projects Pvt Ltd was awarded a project for construction of new Grid Substation at Kegalle with 15MVAr (3x5MVAr) Capacitor Banks at 33kV and Augmentation of Existing 132/33kV Grid Substation at Thulhiriya for Ceylon Electricity Board. I performed as the Project Manager for this Substation Project. Project was completed successfully and waiting for the transmission line which is under a different project to energize the substation.

Mar 2016 - Sep 2017

Project Manager

1.25Mw Samanalawewa Mini Hydro Power Project

LTL Holdings was awarded its first ever EPC contract in renewable energy division to setup 1.25MW Mini Hydro Power Plant utilizing the leak of the Samanalawewa reservoir together with bottom release from the dam for irrigation purposes to produce 1250kW Electricity to national grid. Plant consists with a water diversion weir across the Walawe River close to Samanalawewa Dam base, 2.6m wide channel in 2500m length and a power house with Francis turbine.I was assigned as the Project Manager and I am elated that, we could complete the project on time and handed over to client, Ms. Sri Lanka Energies Pvt Ltd. even under severe weather conditions such as heavy rain and landslides.

Dec 2014 - Mar 2016

Senior Mechanical Engineer

52.2 Mw Power Plant Project At Comilla, Bangladesh

Lakdhanavi was awarded another EPC contract to setup a 52.2 MW Power Plant at Comilla, Bangladesh. I was assigned as the procurement in charge additional to the responsibilities related to all mechanical designing, erection and commissioning works of the project.Radiator Support Structure, Charge Air Filter Platform, Engine Maintenance Platform, Exhaust Gas Module Support Structure, Pipe Supports and other auxiliary platforms were designed and stress analyzed by me. All fabrication drawings were arranged under the guidance of me and fabrication work was guided to achieve project time schedule. Complete material ordering, shipping arrangements, planning shipments, monitoring the documentation was done under the supervision of myself. All vertical storage tanks were designed by me according to the eleventh edition of API 650 standard. There were two HFO Storage Tanks of capacity 2500 m3, two units of 100m3 tanks, three units of 55m3 tanks, one 700m3 tank and nine units of smaller capacity tanks. Reviewing of Fabrication Drawings was also done by me.After the resignation of civil engineer, I was assigned to manage the balance civil works also, of the project.

Feb 2014 - Dec 2014

Senior Mechanical Engineer

Ltl Holdings

52.2 Mw Power Plant Project At Rajshai, Bangladesh

Lakdhanavi was awarded an EPC contract to setup a 52.2 MW Power Plant consisting of six units of Wärtsilä 20V32 DG Sets at Natore, Rajshai. I was assigned as the in charge designing of Steel Structures, Fuel, Water, Lube Oil and Oily Water Tanks and arranging all shipments from Sri Lanka to Bangladesh.Radiator Support Structure, Charge Air Filter Platform, Engine Maintenance Platform, Exhaust Gas Module Support Structure, Pipe Supports and other auxiliary platforms were designed and stress analyzed by me. All fabrication drawings were arranged under the guidance of me and all material ordering was done and fabrication work was guided to achieve project time schedule.All vertical storage tanks were designed by me according to the eleventh edition of API 650 standard. There were one HFO Storage Tanks of capacity 2500 m3, two units of 100m3 tanks, three units of 55m3 tanks, one 700m3 tank and nine units of smaller capacity tanks. Reviewing of Fabrication Drawings were also done by me. In this project most of Plant and Equipment and some of the raw material were delivered through Sri Lanka due to financial clauses of the contract. I was in charge of planning and executing of shipments. Strategic management of deviations of suppliers and various issues related to shipping was a biggest challenge for me and I could successfully deliver all shipments to site considering the project schedule.

Feb 2013 - Feb 2014

Manager-Erections

Ltl Holdings

24 Mw Power Plant Project At Jaffna, Sri Lanka

This was not another Power Plant Project in my carrier. We had only Eight months to complete all Design, Construction, Erection and Commissioning works of the project. Northern peninsula of Sri Lanka was under a civil war for 30 years and we were facing so many difficulties during the project period. But none of them could force us back. We completed the project on time with highest level of appreciation from our client CEB, and started delivering energy to much needed Jaffna Peninsula before the due date of 15th January 2013.I was the in charge of all erection works while playing a special role to manage and coordinate different disciplines to focus on one common goal and expedite the project. Not only as a manager, but also as a Mechanical Engineer, I could drive my junior engineers and subordinates by giving necessary guidance and solutions to achieve this challenging time target.

Aug 2012 - Feb 2013

Project Manager

Ltl Projects Pvt Ltd

132/33 Kv Grid Substation Project At Kilinochchi And Vavuniya

I was the Project Manager for this Substation Project. Although it is completely different field compared to my previous experience, I could manage the situation and complete the project on time with higher level of appreciation not only from the client CEB but also from government of Sri Lanka.

Aug 2011 - Sep 2012

Mechanical Manager

Ltl Holdings

100 Mw Iel Power Plant Project At Magnaghat, Bangladesh

One of the best achievements in my engineering carrier; We were in a very tight schedule as two power plant projects needs to be managed simultaneously. Each power Plant equipped with 12 units of Wärtsilä 20V32 Diesel Engines and thousands of auxiliary equipment to be erected and commissioned within seven months. Facing severe difficult conditions during various phases of the project, two power plants’ erection and commissioning was completed within the scheduled time with appreciation from client and also from Government of Bangladesh.

Oct 2010 - Jul 2011

Mechanical Manager

Ltl Holdings

100 Mw Dbpl Power Plant Project At Siddirgang, Bangladesh.

One of the best achievements in my engineering carrier; We were in a very tight schedule as two power plant projects needs to be managed simultaneously. Each power Plant equipped with 12 units of Wärtsilä 20V32 Diesel Engines and thousands of auxiliary equipment to be erected and commissioned within seven months. Facing severe difficult conditions during various phases of the project, two power plants’ erection and commissioning was completed within the scheduled time with appreciation from client and also from Government of Bangladesh.

Oct 2010 - Jul 2011

Plant Manager

Ltl Holdings

22.5Mw Lakdhanavi Power Plant Sapugaskanda, Sri Lanka

I was the Plant manager of “Lakdhanavi Power Plant,” which is the first ever IPP in Sri Lanka, a 22.5 MW thermal Power Plant equipped with four units of Wärtsilä Vasa 18 V 32 Diesel Generator sets. During this period, one major overhaul was successfully completed while addressing several technical issues such as high crank case pressure, turbo charger gas inlet casing cracking and bearing fatigue failure.

Oct 2008 - Aug 2010

Maintenance Engineer

Ltl Holdings

100Mw Heladhanavi Power Plant At Puttalam, Sri Lanka

During this period I could actively participate for a Major Overhaul of Wärtsilä 18 V 46 Gen Sets including Boiler maintenance.

Apr 2008 - Oct 2008

Operations Engineer

Ltl Holdings

100Mw Heladhanavi Power Plant At Puttalam, Sri Lanka

After commissioning the Heladhanavi Power Plant in September 2004, I worked as an Operations Engineer for more than three years. Operations Involved:Operation of six 18 V 46 Generator SetsOperation of Centrifugal SeparatorsOperation of RO Water Treatment PlantOperation of Oily Water Treatment PlantOperation of three Exhaust Gas Boilers and a Diesel BoilerOperation of High and Low voltage Switch-gears and Electrical units

Sep 2004 - Apr 2008

Site Engineer - Mechanical

Ltl Holdings

100Mw Heladhanavi Power Plant Project At Puttalam, Sri Lanka

I was an active member of the engineering team which setup the 100 MW Heladhanavi Power Plant consists 6 units of Wärtsilä 18 V 46 Gen sets at Puttalam. I enjoyed civil installations as well as mechanical installations. Complete cooling system with fire fighting system installation was done with my supervision and guidance. Over 2000 meters of pipelines were laid and hundreds of mechanical units were installed, integrated and commissioned during this project. Our team could complete the project and start commercial operations, three months prior to the scheduled date.

Nov 2003 - Sep 2004
3 education records

Sudath Pathmal Kularathna education

3As And 1B, Mathematics

Study in the discipline of Mathematics Passed GCE Advanced Level in 1997 with 3As and a B with aggregate of 308 marks ranking 62nd.

8 Distinctions, O/Ls

St Aloysious College, Ratnapura

Primary Education in Sinhala Language Passed GCE Ordinary Level in 1994 with Distinctions for all compulsory subjects and Credit for Grade.

FAQ

Frequently asked questions about Sudath Pathmal Kularathna

Quick answers generated from the profile data available on this page.

What company does Sudath Pathmal Kularathna work for?

Sudath Pathmal Kularathna works for WKV Group of Companies.

What is Sudath Pathmal Kularathna's role at WKV Group of Companies?

Sudath Pathmal Kularathna is listed as Chief Technology Officer at WKV Group of Companies.

What is Sudath Pathmal Kularathna's email address?

AeroLeads has found 1 work email signal at @wkvgroup.lk for Sudath Pathmal Kularathna at WKV Group of Companies.

Where is Sudath Pathmal Kularathna based?

Sudath Pathmal Kularathna is based in Sri Lanka while working with WKV Group of Companies.

What companies has Sudath Pathmal Kularathna worked for?

Sudath Pathmal Kularathna has worked for Wkv Group Of Companies, Ceylex Engineering Pvt. Ltd., Ltl Holdings, and Ltl Projects Pvt Ltd.

How can I contact Sudath Pathmal Kularathna?

You can use AeroLeads to view verified contact signals for Sudath Pathmal Kularathna at WKV Group of Companies, including work email, phone, and LinkedIn data when available.

What schools did Sudath Pathmal Kularathna attend?

Sudath Pathmal Kularathna holds Bachelor Of Science - Bs, Mechanical Engineering, First Class Honours Degree from University Of Moratuwa.

What skills is Sudath Pathmal Kularathna known for?

Sudath Pathmal Kularathna is listed with skills including Commissioning, Power Plants, Engineering, Project Engineering, Power Generation, Substation, Autocad, and Project Management.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.