Tim Lovell Email and Phone Number
Tim Lovell work email
- Valid
Tim Lovell personal email
Tim Lovell is a Senior Project Manager at BY Group at BY Group. He possess expertise in highways, civil engineering, engineering, subcontracting, construction safety and 23 more skills.
By Group
View- Website:
- bygroup.com.au
- Employees:
- 12
-
Senior Project ManagerBy Group Oct 2024 - PresentSydney, New South Wales, AustraliaMarsden Park Data Centre for CDC. -
Samf & Mainline Project ManagerCaf (Construcciones Y Auxiliar De Ferrocarriles) Aug 2022 - Oct 2024Sydney, New South Wales, AustraliaSaMF & Mainline Project Manager for the Parramatta Light Rail Project -
Samf Project ManagerCaf (Construcciones Y Auxiliar De Ferrocarriles) Feb 2022 - Aug 2022Sydney, New South Wales, AustraliaParramatta Light Rail Stabling and Maintenance Facility (SaMF) Project Manager -
Project ManagerVentia Pty Ltd Apr 2019 - Feb 2022Sydney, AustraliaCamellia Remediation Project ($105M)Stage 1 Early Works - Parramatta Light RailPortion 1 & 2 As part of the Parramatta Light Rail Stage 1 Project, the site for the future light rail Stabling and Maintenance Facility (SaMF) at Camellia, was required to be remediated to address chemical contamination resulting from the land's historical industrial use. The remediation approach included the construction of hydraulic barrier around the perimeter and an engineered capping system and a containment cell. Ground improvement was required through the contaminated materials to facilitate the SaMF construction. Tim led the team as Project Manager which delivered on:• Construction of over 1.0km of low permeability soil bentonite cut-off wall • Excavation of over 65,000m3 of contaminated material, requiring stockpiling, waste classification and offsite disposal to a licensed landfill or placed in the on-site containment cell,• Over 4,000 CFA piles constructed over a complex pilling platform that varied in height and staging requirements to meet capping system constraints.• Over 218,000m2 of liner materials placed to form the capping system, comprising of geocomposite and geosynthetic clay lining products;• Approximately 35,000 tonnes of aggregate imported and placed to form the capillary break layer.• Approximately 28,000 tonnes of bearing soil imported to form an impermeable layer over the capillary break and to provide a smooth surface for the placement of an impermeable clay liner;• Over 250,000 tonnes of Sydney sandstone imported, placed, and compacted on the site to finish levels. Sandstone was sourced from other Sydney based infrastructure projects due to its suitability for re-use on the site as an engineered product. • Inclusion of an on-site containment cell which holds over 14,500m3 of re-directed site won contaminated spoil originally destined for offsite disposal to a landfill.• Project maintained a zero Lost Time Injury rate. -
Senior Project EngineerVentia Pty Ltd Sep 2018 - Mar 2019Sydney, AustraliaCamellia Remediation ProjectStage 1 Early Works - Parramatta Light Rail -
Senior Project EngineerVentia Pty Ltd Mar 2018 - Aug 2018Kendall Bay Sediments Remediation ProjectA legacy impact of the Mortlake Gas Works left large areas of sediments within Kendall Bay with contamination from hydrocarbons posing potential human health and ecological risk as well as aesthetic impacts.Tim was responsible for managing and executing on the design and implementation of the Kendall Bay Sediments Remediation Trial Works which involved trialling the in-situ stabilisation (ISS) of sediments within Kendall Bay.The ISS Trial required the mobilisation of various plant and equipment including a barge mounted batch plant and in-situ injection excavator from White Bay to the shallow marine environment of Kendall Bay. -
Project EngineerVentia Pty Ltd Jul 2017 - Feb 2018Decommissioning Of The Former Pad Facility, Cfa Training Campus Fiskville($3M)Team lead delivering on the decommissioning of the PAD facility at the former CFA training campus, Fiskville. Tim’s Responsibilities included;» Manage client/contractor interface.» Lead and manage the project team to ensure project deliverables are met.» Manage and report on Project Finances» Management of subcontractors (City Circle demolition) for the demolition of major CFA fire training infrastructure and buildings. -
Project EngineerVentia Pty Ltd Dec 2016 - Jun 2017Sydney, AustraliaPart of the team delivering on Ventia’s Joint Venture Partnership with SUEZ to design and deliver a Soil Processing Facility in Dandenong South, Victoria. During this time, tender support was also provided on some key tenders. Responsibilities included;» Development of functional specifications for various components of the soil processing facility;» Development of tender packages for the soil processing facility; » Tender support for key bids -Involvement included development of methodologies, project scheduling and pricing. -
Project EngineerVentia Pty Ltd Jan 2016 - Nov 2016Cox Peninsula Remediation Project ($17.4M)Engaging with the Commonwealth Government, Ventia performed extensive remediation across several sites of the Cox Peninsula, NT. The remediation of the land will facilitate the progression of the long running Indigenous land claim (Kenbi Land Claim). Responsible for managing the following packages and works:» Site establishment infrastructure (site offices and septic systems) » Civil Infrastructure (DTD Plant Footings, Tapa Bay Bore Transfer Station)» Major Demolition two large redundant buildings.» Bulk Earthworks (Excavation of ~450m3 of lead impacted soil, ~5000m3 of asbestos impacted soil and ~1600m3 of OCP/PCB impacted soil) and associated backfill.» Treatment of Lead impacted waste using Ventia’s track mounted soil recycler.» Removal of over 10,000 lineal meters of underground services -
Site EngineerVentia Pty Ltd Nov 2015 - Dec 2015Macdonaldtown Gasworks Remediation Project ($13M)Under contract with RailCorp, Ventia is performing the major remediation works on a suburban site adjacent to six of Sydney Trains’ active lines. Tim is responsible for overseeing works which include:» Establishment of remediation facilities (negative pressure enclosure, retaining walls and water treatment plant and emission control system);» Heritage restoration works on one of NSW’s last remaining Gasholder structures.» Excavation, treatment and disposal of 17,000m3 of contaminated materials including validation requirements for the site;» Backfilling and landscaping of the remediated site; -
Site EngineerThiess Nov 2014 - Nov 2015Macdonaldtown Gasworks Remediation Project ($13M) , Sydney NswUnder contract with RailCorp, Thiess is performing the major remediation works on a suburban site adjacent to six of Sydney Trains’ active lines. BTim is responsible for overseeing works which include:» Establishment of remediation facilities (negative pressure enclosure, retaining walls and water treatment plant and emission control system);» Heritage restoration works on one of NSW’s last remaining Gasholder structures.» Excavation, treatment and disposal of 17,000m3 of contaminated materials including validation requirements for the site;» Backfilling and landscaping of the remediated site -
Site EngineerThiess Feb 2014 - Nov 2014Elizabeth Quay ($32M) , Perth WaThiess undertook several major packages of work at Elizabeth Quay on behalf of the managing contractor, Leighton Broad. Elizabeth Quay will re-establish the city's historic links with the Swan River by creating a magnificent precinct featuring a 2.7 hectare inlet surrounded by a split level promenade, shops, cafes, restaurants and other exciting entertainment venues. Tim was responsible for:» Construction of limestone/granite bund; 400m combined total length;» Reclamation of two islands with a combined area of 16,000m2 forming part of the permanent Elizabeth Quay works involving displacement/mechanical removal of 16,000 m3 unstable swan river alluvium followed by placement and compaction of 74,000 tonnes limestone; and» Construction of pilling platforms required as forward works for the diaphragm wall contractor.» Installation of sheet pile walls including in river pilling works to aid removal of contaminated soils and construction of a reclaimed bund within the Swan River.» Bulk earthworks to form promenades and road reserves as part of the public space.» Excavation, tracking and disposal of over 65,000m3 of hydrocarbon and acid sulphate affected materials and overburden material.» Demolition and disposal of 1000 lineal meters of diaphragm wall -
Graduate Civil EngineerThiess Aug 2013 - Feb 2014Toowoomba Gasworks Remediation Project ($17M) Toowoomba, QldThiess was commissioned by Energex to remediate the old Toowoomba Gasworks site for sale and redevelopment. The heavily contaminated site posed challenges, including the demolition of structures containing asbestos, the need to salvage recyclable materials, the removal of 100,000 tonnes of contaminated soil. Tim was responsible for:» Excavation and disposal of 100,000 tonnes of contaminated waste including validation requirements for the site;» Backfill and landscaping of the remediated site; and» Reinstatement of the Chalk Drive car park. -
Graduate Civil EngineerThiess Feb 2013 - Aug 2013Hunter Expressway Alliance ($885M), Newcastle, NswThiess joined Roads and Maritime Services (RMS), Parsons Brinckerhoff and Hyder Consulting in an alliance to construct the 13-kilometre eastern section of the Hunter Expressway project. Traversing the rugged Sugarloaf Range in NSW, the team navigated undulating, environmentally-sensitive forest terrain, water courses, and areas of historical mining activity and cultural heritage to complete one of the largest and most complex projects in the State’s history.The scope included construction of two major grade separated interchanges, light and heavy vehicle rest areas, three twin-viaduct bridges, 23 additional bridges and mine subsidence foundation treatment.Tim’s role covered:» Post stressing and precast erection engineer for 564 segments of the balanced cantilever viaducts over the Sugarloaf ranges; and» Roads finishing works including detailed earthworks, re-vegetation and installation of fauna fencing and signage over the 13km alignment. -
Undergraduate Civil EngineerThiess Nov 2010 - Dec 2012Hunter Expressway Alliance ($885M)Thiess joined Roads and Maritime Services (RMS), Parsons Brinckerhoff and Hyder Consulting in an alliance to construct the 13-kilometre eastern section of the Hunter Expressway project. Traversing the rugged Sugarloaf Range in NSW, the team navigated undulating, environmentally-sensitive forest terrain, water courses, and areas of historical mining activity and cultural heritage to complete one of the largest and most complex projects in the State’s history.The scope included construction of two major grade separated interchanges, light and heavy vehicle rest areas, three twin-viaduct bridges, 23 additional bridges and mine subsidence foundation treatment.Tim’s role covered:» Post stressing and precast erection engineer for 564 segments of the balanced cantilever viaducts over the Sugarloaf ranges; and» Roads finishing works including detailed earthworks, re-vegetation and installation of fauna fencing and signage over the 13km alignment.
Tim Lovell Skills
Tim Lovell Education Details
-
University Of NewcastleCivil Engineering
Frequently Asked Questions about Tim Lovell
What company does Tim Lovell work for?
Tim Lovell works for By Group
What is Tim Lovell's role at the current company?
Tim Lovell's current role is Senior Project Manager at BY Group.
What is Tim Lovell's email address?
Tim Lovell's email address is ti****@****.com.au
What schools did Tim Lovell attend?
Tim Lovell attended University Of Newcastle.
What are some of Tim Lovell's interests?
Tim Lovell has interest in Economic Empowerment, Politics, Education, Environment, Science And Technology, Disaster And Humanitarian Relief, Human Rights, Arts And Culture.
What skills is Tim Lovell known for?
Tim Lovell has skills like Highways, Civil Engineering, Engineering, Subcontracting, Construction Safety, Construction Engineering, Construction Management, Subcontractor Management, Project Management, Cost Planning, Forecasting, Primavera P6.
Who are Tim Lovell's colleagues?
Tim Lovell's colleagues are Annie Li, Campbell Russell, Tane Mundine, Lyle Harris, Gülperi Bayraktar, Tarquin Hor, Robert De Brincat.
Not the Tim Lovell you were looking for?
-
-
Tim Lovell
Investor | Chairman | Board & Governance | Director | Ceo | Founder | Entrepreneur | Innovator | Analyst | Mentor |Southbank, Vic -
-
2yahoo.com, holmesglen.edu.au
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial