Senior Project Manager
CurrentDSRT Surf, Palm DesertDSRT Surf is a new 17-acre resort destination in Palm Desert, with the main attraction being its 5-acre surf lagoon where artificial waves will be generated to accommodate up to 80 surfers simultaneously. Morley's scope of work includes foundations, walls, and shore slabs-on-grade for the Surf Lagoon and its support buildings.MCAS P-201 F-35C Joint Strike Fighter Maintenance Hangar, San DiegoThe P-201 Hangar project will provide the Marine Corps Air Station Miramar base with a new facility supporting two F-35C aircraft maintenance squadrons and ancillary support areas. Morley's scope of work includes a 166,000-square-foot Type II hangar and five ancillary buildings. Pacific Center, San DiegoPacific Center is an 815,000 square-foot life science campus located in Sorrento Mesa that features two life sciences buildings, ample outdoor and collaboration space, a parking garage, and an amenity building. Morley Construction was selected as the concrete subcontractor for one of the three new structures within this campus development. Morley's scope of work, Building B, is a six-story cast-in-place structure with one level below grade. Building B contains the most prominent architectural concrete features of the project, including ground level exposed cast-in-place walls with reveal patterns and tapered architectural slab edges on all levels. UCSD Viterbi Family Vision Research Center, San DiegoThe Viterbi Research Center is the new expansion of UC San Diego’s vision facilities focused on discovering how to reverse glaucoma. This project is a six-story cast-in-place concrete structure, providing approximately 100,000 gross square feet of new space, including new space for computational analytics and clinical trial research, open laboratory space to conduct clinical trial research, a core laboratory, meeting and support space, and a small amount of retail.