AeroLeads people directory · profile

Tore Andersen Email & Phone Number

Engineering Project Manager at TechnipFMC at TechnipFMC
Location: Oslo, Norway 42 work roles 1 school
1 work email found @technipfmc.com LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email t****@technipfmc.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Engineering Project Manager at TechnipFMC
Location
Oslo, Norway
Company size

Who is Tore Andersen? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Tore Andersen is listed as Engineering Project Manager at TechnipFMC at TechnipFMC, a with 41486 employees, based in Oslo, Norway. AeroLeads shows a work email signal at technipfmc.com and a matched LinkedIn profile for Tore Andersen.

Tore Andersen previously worked as Engineering Project Manager at Technipfmc and Specialist Field Development Engineer at Technipfmc. Tore Andersen holds B.Sc., Mechanical from Høgskolen I Sør-Trøndelag / Sør-Trøndelag University College (Hist).

Company email context

Email format at TechnipFMC

This section adds company-level context without repeating Tore Andersen's masked contact details.

{first}.{last}@technipfmc.com
89% confidence

AeroLeads found 1 current-domain work email signal for Tore Andersen. Compare company email patterns before reaching out.

Profile bio

About Tore Andersen

Specialties: Engineering Management within Subsea Production SystemsSenior Marine Engineer on marine operation projects related to Subsea installations.Wide Experience from Subsea Technology and Engineering.

Listed skills include Subsea Engineering, Offshore Drilling, Feed, Engineering, and 31 others.

Current workplace

Tore Andersen's current company

Company context helps verify the profile and gives searchers a useful next step.

TechnipFMC
Technipfmc
Engineering Project Manager at TechnipFMC
london, greater london, united kingdom
Website
Employees
41486
AeroLeads page
42 roles

Tore Andersen work experience

A career timeline built from the work history available for this profile.

Engineering Project Manager

Current

Lysaker

Project: Fenja (Earlier Pil & Bue) Client: Neptune EnergyEngineering Manager for the SPS and SURF deliverables to the Fenja Project

Dec 2017 - Present

Specialist Field Development Engineer

Lysaker, Akershus, Norge

Project: Pil & Bue FEED and Tender Client: VNG NorgeFEED/Tender Engineering Manager for the Subsea Production System for the Pil & Bue Oilfield

Jan 2017 - Dec 2017

System Engineering Mps Global Standards

Kongsberg

Project: MPS Global Standards, Internal Project

Feb 2015 - Sep 2016

Engineering Manager

Oslo Area, Norway

Projects: Gullfaks Sør Olje & Oseberg Delta 2, Client: Statoil

Aug 2014 - Feb 2015

Engineering Manager

Oslo Area, Norway

Project: Gullfaks Sør Olje, Client: Statoil

Aug 2013 - Aug 2014

Engineering Manager

Oslo Area, Norway

Project: Knarr Field Development, Client: BG NorgeEngineering responsible for SPS incl, Intervention & Connection, Template Manifolds, Well Completion, Controls, Flow Management and Flow Assurance

Mar 2010 - Aug 2013

Department Manager

Aker Marine Contracors

Oslo Area, Norway

Department Manager “Systems & Installation”Administration of “Subsea Construction Methods” department. Coordination of resources for different tenders and projects. Involved in tenders and projects.

Apr 2009 - Mar 2010

Deputy Department Manager, “Subsea Construction Methods”

Aker Marine Contractors

Oslo Area, Norway

Administration of “Subsea Construction Methods” department. Coordination of resources for different tenders and projects. Involved in tenders and projects

Dec 2008 - Apr 2009

Specialist Engineer

Aker Marine Contractors

Oslo Area, Norway

Project: InternalPerformance of Internal Work Instructions and Technical Support for various Tenders and Projects

Jan 2008 - Dec 2008

Engineering Manager

Aker Marine Contractors

Oslo Area, Norway

Project: Chestnut, Client: Sevan MarineInstallation of Mooring System for the Sevan Marine FPSO “Hummingbird” in GB sector, North sea.Towing and installation of the FPSO “Hummingbird”.

Dec 2006 - Jan 2008

Engineering Manager

Aker Marine Contractors

Oslo Area, Norway

Project: Oudna, Client: Petrofac/Lundin PetroleumTender Manager for Installation of Subsea Hardware and Mooring System for the re-deployment of the FPSO vessel “Ikdam”.Installation of Subsea Hardware and Mooring System for the re-deployment of the FPSO vessel “Ikdam” in Tunisian sector, Mediterranean. Hardware included 4”, 6” Flexible and umbilical installation. All hardware installed from Maersk A-Class vessel

Aug 2005 - Dec 2006

Technical Support

Aker Marine Contractors

Oslo Area, Norway

Project: Skarv, Client: AKETSkarv Subsea development study, marine installation method and cost. Client: Aker Kvaerner Engineering and Technology, ultimate client BP

Apr 2005 - Jul 2005

Lead Engineer

Fmc Energy Systems, Kongsberg Subsea As

Kongsberg

Project: Ormen Lange, Client: Norsk HydroTie-in & Intervention, Connector Actuating Tool, Running Tools, ROV Tools, Hubs & Clamps including specifications, manuals and procedures

Nov 2003 - Apr 2005

Lead Engineer

Fmc Energy Systems, Kongsberg Subsea As

Oslo Area, Norway

Project: Development Program, Technology Dept.,Client: InternalMarinization of Nucleonic level instruments for Subsea process vessel and development of Running Tool for level instruments

Aug 2002 - Nov 2003

Lead Engineer

Fmc Energy Systems, Kongsberg Subsea As

Project: Development Program, Technology Dept.,Client: InternalComposite Cable and Topside equipment development for LWI. Composite Cable Topside equipment to be used for well service as an alternative to wire technology

Dec 2001 - Aug 2002

Lead Engineer

Fmc Energy Systems, Kongsberg Subsea As

Oslo Area, Norway

Project: DEMO 2000, Client: InternalIntervention and Marine Operation, Technology Dept.DEMO 2000 and Ultra Deep Water project. Design and ideas for the next generation Subsea Production System, Design and ideas for next generation Tie-in Systems, cost exercise/comparison for different subsea production, tie-in and intervention systems.

Jan 1999 - Dec 2001

Lead Engineer Intervention

Abb Offshore Tech. As

Oslo Area, Norway

Project: Snorre B, Client: Saga PetroleumROV Component Replacement tool (RCR) for Control Modules, Insert Chokes and Multi Phase Meters

Aug 1998 - Jan 1999

Project Manager Intervention

Abb Offshore Tech. As

Oslo Area, Norway

Project: Troll Pilot, Client: Norsk HydroLevel Indicator Running Tool (LIRT), LIRT Landing Structure, Marinization of nucleonic and inductive Level Instruments, Connector System for Flex loop pipe joints and Guide Post System

Aug 1997 - Aug 1998

Project Manager

Kongsberg Offshore As

Houston, Texas Area

Project: Zafiro, Client: Mobil ExplorationMobil Equatorial Guinea phase II, 4 off Templates and Manifolds incl. Intervention equipment. All work performed from FMC’s offices in Houston, Texas

May 1996 - Aug 1997

Project Engineer

Kongsberg Offshore As

Kongsberg

Project: Study, Client: InternalField study of the Malampaya Oilfield

Apr 1996 - May 1996

Project Engineer

Kongsberg Offshore As

Kongsberg

Project: LaminariaBid work of the Laminaria Oilfield. The work included evaluation of potential subcontractors for manufacturing companies in Perth, Australia

Dec 1995 - Apr 1996

Lead Engineer

Kongsberg Offshore As

Kongsberg

Project: Frame Contract Statoil, Client: StatoilLead Engineer for the Intervention Group

Sep 1995 - Dec 1995

Offshore Supervisor

Kongsberg Offshore As

Heidrun Oilfield

Project: Heidrun Riser Base Project, Client: ConocoSubsea Tie-in Operations for the Pull-in and Connection Tools at the Heidrun Oilfield

Jul 1995 - Sep 1995

Project Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Norne, Client: StatoilIntervention Group, design of swing-arm

Oct 1994 - Jul 1995

Offshore Supervisor, Kongsberg Offshore As

Borg Technology As

Heidrun Oilfield

Project: Heidrun Water Injection Project, Client: Conoco Subsea Tie-in Operations for the Pull-in and Connection Tools at the Heidrun Oilfield

Aug 1994 - Oct 1994

Offshore Supervisor, Kongsberg Offshore As

Borg Technology As

Heidrun Oilfield

Project: Heidrun Water Injection Project, Client: ConocoOffshore Supervision at one of the Heidrun Templates after a Protection Roof accident. Work performed; securing Pin-Connector Pedestal and retrieval of a Pressure Test and Monitoring Tool

Jul 1994 - Aug 1994

Offshore Supervisor, Kongsberg Offshore As

Borg Technology As

Statfjord

Project: Statfjord Satellite Project, Client: StatoilOffshore Supervision during the Intervention Operation of replacement of Insert Ball Valves with Running Tool

Jun 1994 - Jul 1994

Project Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Heidrun, Client: ConocoMechanical, Heidrun Tie-in Operations, Responsible for the Preparations with Logistics, Spare Parts and Crew for the Heidrun Tie-in Operations

May 1994 - Jun 1994

Project Engineer, Kongsberg Offshore As

Borg Technology As

Project: Internal, Client: Kongsberg OffshoreMechanical, Development Project, ROV-operated High Pressure Single-Port Hot-Stab, GA Drawings by AutoCAD

Mar 1994 - May 1994

Field Supervisor, Kongsberg Offshore As

Borg Technology As

Tønsberg

Project: Heidrun Riser Base Project, Client: ConocoSite Supervision at NLI Husøy, Tønsberg. Test of the “Tie-in and Connection Operations” and Static Umbilical and Test Equipment

Dec 1993 - Mar 1994

Field Supervisor, Kongsberg Offshore As

Borg Technology As

Tønsberg

Project: Heidrun Subsea Water Injection Project, Client: Conoco, Site Supervision at Kaldnes de Groot, Tønsberg, during the Site Integration Test for Tie-in Operations

Oct 1993 - Dec 1993

Offshore Supervisor, Kongsberg Offshore As

Borg Technology As

Statfjord

Project: Statfjord Satellite Project, Client: StatoilSubsea Tie-in Operations for the Pull-in and Connection Tools at the Statfjord Oilfield

Jul 1993 - Oct 1993

Mechanical Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Wanaea/Cossac OilfieldBid Drawings, GA’s and Detail of Manifold, Manifold Piping and Diver Operated Control Module

Jun 1993 - Jul 1993

Mechanical Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Joanne Oilfield UK, Client: Phillips PetroleumDevelopment-Project of a Diver Operated Multi Quick Connection (MQC) plate. Drawing and AutoCAD

Mar 1993 - Jun 1993

Field Engineer, Kongsberg Offshore As

Borg Technology As

Tønsberg

Project: Statfjord Satellite Project, Client: StatoilSite Supervision at Kaldnes de Groot, Tønsberg, Site Integration Test and Shallow Water Test for Universal Running Tool, Pull-in and Connection Tools

Aug 1992 - Mar 1993

Mechanical Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Statfjord Satellite Project, Client: StatoilEngineering and Design of Guide Post and Universal Running Tool, including Liaising with sub-contractor

Feb 1992 - Aug 1992

Mechanical Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Albacora Oilfield, Client: PetrobrasManifold and templates. Bid drawings; Arrangement and details for Pull-in & Connection Tools

Jan 1992 - Feb 1992

Mechanical Engineer, Kongsberg Offshore As

Borg Technology As

Kongsberg

Project: Draugen Subsea Well Facilities, Client: Norske ShellDesign and Detail Engineering of Piping, Pipe Support and Connecting Tools, including GA’s

Jun 1991 - Dec 1991

Piping Designer

Borg Technology As

Sarpsborg

Project: Borregaard Fine Chemicals A/SClient: Borregaard Fine Chemicals A/SPiping GA’s and Fabrication Isometrics by HP Draft for Process Lines in Chemical Plant

Mar 1991 - Jun 1991

Mechanical Engineer

Borg Technology As

Fredrikstad

Project: Internal Development, Client: InternalMechanical Designer,Subsea Quick Release Connector, GA Drawings by AutoCAD

Feb 1991 - Mar 1991

Piping Designer

Borg Technology As

Fredrikstad

Project: Tine, Norske Meierier, Client: Tine, Norske MeierierAutoCAD drawings for pipelines, Vessels and equipment for dairy productionJan

Jan 1991 - Feb 1991
Team & coworkers

Colleagues at TechnipFMC

Other employees you can reach at technipfmc.com. View company contacts for 41486 employees →

1 education record

Tore Andersen education

FAQ

Frequently asked questions about Tore Andersen

Quick answers generated from the profile data available on this page.

What company does Tore Andersen work for?

Tore Andersen works for TechnipFMC.

What is Tore Andersen's role at TechnipFMC?

Tore Andersen is listed as Engineering Project Manager at TechnipFMC at TechnipFMC.

What is Tore Andersen's email address?

AeroLeads has found 1 work email signal at @technipfmc.com for Tore Andersen at TechnipFMC.

Where is Tore Andersen based?

Tore Andersen is based in Oslo, Norway while working with TechnipFMC.

What companies has Tore Andersen worked for?

Tore Andersen has worked for Technipfmc, Forsys Subsea - An Fmc Technologies & Technip Company, Fmc Technologies, Aker Marine Contracors, and Aker Marine Contractors.

Who are Tore Andersen's colleagues at TechnipFMC?

Tore Andersen's colleagues at TechnipFMC include Katherine Pieruzzini, Ogy Nzyan, Venkata Mallikharjuna Rao Kavuri, Tannu Kanojiya, and Nana Akosua Korankye.

How can I contact Tore Andersen?

You can use AeroLeads to view verified contact signals for Tore Andersen at TechnipFMC, including work email, phone, and LinkedIn data when available.

What schools did Tore Andersen attend?

Tore Andersen holds B.Sc., Mechanical from Høgskolen I Sør-Trøndelag / Sør-Trøndelag University College (Hist).

What skills is Tore Andersen known for?

Tore Andersen is listed with skills including Subsea Engineering, Offshore Drilling, Feed, Engineering, Oil/Gas, Petroleum, Pipelines, and Piping.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Tore Andersen you were looking for.

View similar profiles