Project Manager
Pan Arabian Enterprises For Pipeline Construction
Abu Dhabi
Project Abu Dhabi Municipality (Contract No. SPC-308) Civil Works for Liwa Sewerage SystemLocation Abu DhabiDescription Construction of septic tanks, 60 km of pipeline 250mm dia. 200 m dia, 300mm dia, 350 mm dia. GRP & UPVC pipes, 22 nos. of septic tank, pump stations, sewerage treatment plant.Construct all related chambers along gravity line and force major linesConstruct all house connection at Liwa Villages along sewerage pipelines with all related collection chambers and all related backdrops.Laying of sewer network at LIwa Villages including House connection and all collection and inspection chambersConstruct of asphalt road at Liwa site including all servicesProject Abu Dhabi Municipality (Contract No. D-01-0008) Pumping Mains at MIrfaDescription To construct a 600 mm diameter pipes from Irfa Desalination Plant to Mirfa Town, with connections to existing tanks and pump stationTo construct various pipeline interconnections inside Mirfa TownTo construct reinforced concrete valve chambers along over the pipeline which included the air valves, washout valves, pilot operated valves, flow control valves, flow meters, control valves, etc. after the different diameters of pipes dia 600, 500 and 300mmTo execute NDRC (Non Disruptive Road Crossing) for some road crossing at different locations for diameter 600mm and 300mm at Mirfa Town.Construction and install precast R.C. protection slabs and marker posts at different location along over the pipeline route.Supply 30 m3 surge vessel, complete with level transmitter, pressure sensor and panel mounted indicator for the existing pump station inside the desalination plant.