ENSURE SESAR 3 project
Company

ENSURE SESAR 3 project

Airlines And Aviation Madrid, Es 126 employees
Employees
126

ENSURE SESAR 3 project Overview

Headquarters
Madrid, Es
Website
www.sesarju.eu
Industry
Airlines And Aviation
Employees
126
Founded
2023
NAICS
Air Transportation
Scheduled Air Transportation
Nonscheduled Air Transportation

About ENSURE SESAR 3 project

The ATM – U-space interface will build on the work performed under PJ34 AURA Horizon 2020 Industrial Research (IR) project, focusing on the standardisation of data models and information exchanges required between ATM and U-space system. In addition, the operating methods derived from the common interface will be refined as well as the U-space services available, adding new ones according to the identified needs. The main objective is the consolidation of the common ATM/U-space interface with a standardized data model, architecture and an operation method refined and complete to achieve a minimum TRL7. The project is also focused on the development of a refined and complete Dynamic Reconfiguration Service mentioned in U-space regulation, necessary to establish the operating methodology and develop the standard interface to help ATC actors in charge of airspace reconfigurations to implement necessary changes. ENSURE Consortium: Indra, as project coordinator, Aerocámaras S.L., Airbus, Collins Aerospace, D-flight, ENAIRE, ENAV, AirNav Ireland, EUROCONTROL, HungaroControl, Leonardo, LFV, NAIS, NATS, NLR, ORO NAVIGACIJA, TERN Systems, SABCA and Unifly. A fast track project funded by SESAR 3 Joint Undertaking.

Compare Similar Companies to ENSURE SESAR 3 project