Lefdal Mine Data Centers

Lefdal Mine Data Centers

It Services And It Consulting Kjølsdalen, No 35 employees
Employees
35

Lefdal Mine Data Centers Overview

Headquarters
Kjølsdalen, No
Phone Number
Available in AeroLeads
Website
lefdalmine.com
Industry
It Services And It Consulting
Employees
35
Founded
2011
Company Email
Available in AeroLeads
NAICS
Computer Systems Design and Related Services
Other Computer Related Services

About Lefdal Mine Data Centers

Our vision is to offer the most cost effective, secure, flexible and green data center solution in Europe. Several key differentiators build up our unique value proposition. Power – Renewable, stable and at low cost LMD is located near 350 MW renewable power production. The national grid is next to the facility with a capacity of 2 500 MW. Surplus power production in the region of 6.7 TWh. Long term power prices available at leading low cost. Effective cooling solution The LMD cooling solution will enable the facility to run with an industry leading PUE guaranteed between 1.08 and 1.15 depending on UPS configuration. Our water cooling enables 50 KW/rack. Leading green LMD is Europe’s greenest data center. In addition to running on renewable power and operating with low PUE, the CO2 emission is “0” and the footprint limited. The mine is already there and the material required to build out capacity is low. The main part of the facility is not visible to the surroundings. There is no need for evaporative systems for cooling and the WUE (Water Usage Effectiveness) is “0”. Flexibility – Growth, density and product solutions The flexibility is unique, with a “pay as you go” capacity. The size of the facility - 120.000 m2 whitespace - and the logistics allows different product solutions in a cost effective way. We can facilitate all known concepts for white space solutions and the facility structure enables a streamlined solution for containers in different shapes and sizes. LMD can customize power density, temperature, humidity, operational equipment, tier level and all related services. Time to market is 8 weeks for large scale capacity. Services up to IaaS are offered on pure lease models. High Security LMD is a Tier 3 data center service inside several secure mountain halls. The data is EMP protected. The facility has access from two single points of entry. This offers a high level of natural security and access control.

Lefdal Mine Data Centers Contact Details

People in AeroLeads
1

Lefdal Mine Data Centers Org Chart

Sample employees and titles
Name Title Contact
Ash Kelso Head of European Infrastructure
View

Employees by Management Level

Individual contributor 7 profiles
VP / Head 2 profiles
Manager 2 profiles
Executive 1 profile

Department Contact Coverage

Department Contacts Email Phone
IT 5 5 0
General 1 1 0
Operations 1 1 0

Lefdal Mine Data Centers Tech Stack

Cloud / infrastructure 2 profiles
Data / AI 2 profiles

Compare Similar Companies to Lefdal Mine Data Centers