Ahmed Rashwan Email and Phone Number
Over 15 years of extensive experience on various civil work projects in Egypt; KSA and Qatar. With profound knowledge of project construction supervision in construction activities and has gained knowledge of the quality of work done in a given period and budget. Worked on various projects in Horizontal and Vertical Structures such as Villas, Residential Houses, playgrounds, and Parks, Familiar with International Specifications & Standards in the construction industry. The focused Project Manager is adept at planning, directing, and maintaining continuous operations in various departments. Experienced at directing manufacturing employees and keeping efficient production by quality standards. Applying a creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training, and empowering teams to excel in performance.
-
Project ManagerSawaed Developments Sep 2022 - PresentCairo, EgyptMonitor & Evaluate the progress of work versus time and suggest measures to expedite the work if found to be behind schedule; describe how would like to complete the project and its consequences.Attend to Inspection Request (IR) submitted by Contractor and take appropriate action promptly; Monitor Quality of works and assess the safety at the site; Maintained records for daily activities on site including progress photos and readily available for inspection at the time needed arises.Met project deadlines without sacrificing build quality or workplace safety.Updated operational methods and oversaw accounting procedures for improved efficiency. -
Project ManagerInternational Constructions Dec 2019 - Sep 2022Cairo, EgyptMonitor & Evaluate the progress of work versus time and suggest measures to expedite the work if found to be behind schedule; describe how would like to complete the project and its consequences.Attend to Inspection Request (IR) submitted by Contractor and take appropriate action promptly; Monitor Quality of works and assess the safety at the site; Maintained records for daily activities on site including progress photos and readily available for inspection at the time needed arises.Met project deadlines without sacrificing build quality or workplace safety.Updated operational methods and oversaw accounting procedures for improved efficiency.
-
Project ManagerAk Formwork Trading & Contracting Oct 2015 - Sep 2019Doha, QatarMonitor the quality of work and assess the safety at the site; monitor & evaluate the progress of work versus time and suggest measures to expedite the work if found to be behind schedule; describe how we would like to complete the project and its consequences.Assist in checking of as Built Drawing; Preparing Snag list before the closing of the project.Maintained relationships with material vendors to lower costs and diversify capabilities.Developed and initiated projects managed costs and monitored performance.Achieved project deadlines by coordinating with contractors to manage performance.
-
Project ManagerMshari Al-Shathri Engineering Consulting Company Is A Closed Saudi Closed Joint Stock Company May 2013 - May 2015Tabuk, Saudi ArabiaEnsures that the work complies with the requirements of the specification and relevant codes and standards.Ensures that the contractors approved shop drawings, method statements, quality control procedures and safety plans are being implemented on-site.Checks for the requirements of other disciplines are coordinated and incorporated into the civil/structural works.Assist with inspection of completed works for handover to operating authorities. -
Senior Site EngineerInsha Contracting & Trading W.L.L. Jan 2011 - Feb 2013Doha, Qatarpreparing excavation for installing water lines, sewage lines, electrical lines, and agriculture lines (mainline and lateral lines) for the entire park and all buildings (mosque, cafeteria, bathrooms, and bodyguards room) as approved drawing and Qatar specification and method statementConcrete works: Starting from works, preparing material and quantities as specification depending on approved drawing, steel distribution depending on approved drawing and the British code, preparing to shutter and to install the steel rebar, starting casting concrete after finishing concrete testing (slump test and preparing the cubs ), starting curing for 28 days to get the maximum strength for the concrete.Finishing works: block works, plumping works for water lines and sewerage lines, woodwork, electrical works, plaster works, paint works( texture paint ), GRC works, floor finishing (granite, marble, ceramic )Landscape: Hardscape works: Stamped concrete, slate tiles, granite fish scale, limestone, marble, clay tiles, interlock, and kerbstone and asphalt works. Soft escape works: Including palms, trees, and grass.Assist in managing planned construction projects.Survey a construction site, and describe how you would like to complete the project and its consequences.Liaise with federal entities, environmental agencies, and local authorities on the implications of the constructionAddress the concerns of the workers and advise them on the subject of the construction process.Assist in Facilitating the Management Review on maintenance planning issues, performance, inspection, and progress.Obtain the materials required for construction and check them.Analyzed survey reports, maps, blueprints, and other topographical and geologic data to plan infrastructure and construction projects. -
Site EngineerWadi El Nile For Contracting & Real Estate Investments Jun 2008 - Dec 2010Cairo, EgyptSupervises, an inspection of work general assignment for the general areas engaged, advice on work procedure, prepares consolidated reports on the condition of structure & work progress and performs other duties engaged by the Project Engineer.Assigned the works to work on construction projects, kept daily time records, submitted reports on the construction undertaken, and inspected the works of the various sections of the project areas.Supervises all tasks of masonry, carpentry, & semi-skilled work for the construction of various city projects.Checked technical designs and drawings for adherence to standards.Prepared site reports and organized subcontractor invoices, code documentation and schematics.
-
Site EngineerElwha Land Investment Jun 2007 - Apr 2008Alexandria, Egypt· Supervise Manpower for various projects for the construction of Residential Housing & Roads.· Oversaw quality control and health and safety matters for construction teams.· Checked technical designs and drawings for adherence to standards.
Ahmed Rashwan Education Details
-
Faculty Of Engineering - Department Of Civil EngineeringPass
Frequently Asked Questions about Ahmed Rashwan
What company does Ahmed Rashwan work for?
Ahmed Rashwan works for Sawaed Developments
What is Ahmed Rashwan's role at the current company?
Ahmed Rashwan's current role is Project Manager.
What schools did Ahmed Rashwan attend?
Ahmed Rashwan attended Alexandria University, Faculty Of Engineering - Department Of Civil Engineering.
Who are Ahmed Rashwan's colleagues?
Ahmed Rashwan's colleagues are Mohamed Con, Eihab Abosina, Ahmed Taher Shaltout, Gelan Saeed.
Not the Ahmed Rashwan you were looking for?
-
2nokia.com, nsn.com
-
Ahmed Rashwan
Senior Software Engineer @ Afaqy | Laravel | Node.Js | Building E-Commerce Solutions | Fleet Management SystemsEgypt -
-
1ymail.com
-
3gmail.com, dell.com, telus.com
2 (866) 5XXXXXXX
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial