Alan Kernaghan Email & Phone Number
Who is Alan Kernaghan? Overview
A concise factual answer block for searchers comparing this professional profile.
Alan Kernaghan is listed as CIVIL/STRUCTURAL/MECHANICAL CHECKER at Primero Group, a with 356 employees, based in Perth, Western Australia, Australia. AeroLeads shows a matched LinkedIn profile for Alan Kernaghan.
Alan Kernaghan previously worked as SMP CHECKER at Primero Group and S & M CHECKER at Lycopodium.
Email format at Primero Group
This section adds company-level context without repeating Alan Kernaghan's masked contact details.
Review company-level records connected to Alan Kernaghan before choosing the right outreach path.
About Alan Kernaghan
Alan Kernaghan is a CIVIL/STRUCTURAL/MECHANICAL CHECKER at Primero Group. He possess expertise in steel, steel structures, navisworks, microstation, structural engineering and 33 more skills.
Listed skills include Steel, Steel Structures, Navisworks, Microstation, and 34 others.
Alan Kernaghan's current company
Company context helps verify the profile and gives searchers a useful next step.
Alan Kernaghan work experience
A career timeline built from the work history available for this profile.
S & M Checker
Mechanical Checker
Structural, Mechanical & Piping Checker
Smp Checker
Long Service Leave
Structural Checker
Lead Structural Designer
Structural Designer/Checker
Civil, Structural And Mechanical Checker
Structural Checker
Structural Designer
Emergency Subsea Pipeline Repair system for Qatar Petroleum and Pluto Platform module installation study for Woodside Energy
Senior Structural Designer
Supervising the design of Multidiscipline supports for the Hebron Oil Platform project.Based in Beijing, responsible for ensuring the consistency and quality of the output of Pipe, HVAC and Cable tray supports.One of the main functions was to review the input of pre-modelled supports against the Stress Isometric requirements prior to the model being released to the HVEC personnel for engineering design, to assist with any queries they may have had and to ensure that the final engineered and re-modelled support complied with the Stress Isometric, pipe span charts, and that the support conformed to correct structural practice, and was clash free.I provided guidance and mentoring to HVEC employees to ensure production targets were met, answer any queries they had and communicated with the piping and stress groups in the Home and Perth offices for clarification as required.I also travelled to the Home Office to provide input on how the quality and consistency of the output from there could be improved.
Senior Civil/Structural Designer
Bozshakol Copper Project, Kazakstan, checking structural steel and concrete drawings for the project including the out put of the Indian low cost centre.
Senior Structural Checker
BHPIO Port Hedland Expansion Project.Structural checker on the brownfields modifications to the existing plant, the new wharf structures and new build transfer stations for structural steel and concrete.
Lead Checker, Mds Group
NR2 Gas ProjectI was the main pipe support checker leading a team of 5 checking the output from the Beijing HVEC centre.I travelled to Beijing to provide input to the team there on checking and structural constructability, and interface with pipe attachments. I eventually spent 4 months in the HVEC centre supervising the output and ensuring standards, quality and compliance with piping requirements were met
Structural Checker
Angel Gas Platform Topsides Design
Lead Civil Designer
Dampier Port Upgrade - Pilbara Iron
Structural Checker
Dampier Port Upgrade - Pilbara Iron
Lead Designer - Supports Group
Rang Dong Oil Platform Topsides DesignI lead a team of piping and structural designers to complete the design and issue of pipework, and pipe, hvac, and cable tray supports. The work involved a large amount of GRE pipework which required many additional supports above the normal amount common for steel piping. The client insisted that this be reviewed by the GRE suppliers, and the result was that the supplier claimed we “had raised the bar’ for GRE pipework and the quality of the work performed should be regarded as best practice.
Senior Structural Designer/Checker
Bayu Undan ProjectChecking of structural drawings and pipe support modelling, review of pipe support drawings.
Lead Structural Designer/Checker
Woodside Maintenance ContractI was lead structural draftsman on the Karratha Domestic Gas Plant expansion project. This was a complex project involving tie-ins to existing facilities and access through them for pipe runs, pipe bridges over roadways and existing equipment etc. This also involved some very complicated pipe support structures due to the tight access.At the same time we also installed two new stabiliser columns and the refit and upgrade of several others. In addition there was various upgrade projects on GWA and NRA.
Structural Designer/Checker
Jakrawan Central Process PlatformGoodwin A Drilling Modules Shale Shaker Upgrade project
Structural Checker
Cossack - Wanea FPSOResponsible for checking the deck pipe rack, and vessel supports.
Sub-Contractors Drawing Office/Fabrication Supervisor
BHP Factory Building, CilegonConstruction of 11,000 square metre Factory at Cilegon for BHP• Supervision of production of shop detail drawings by local Draftsmen and general fabrication & painting supervision
Structural Designer Checker
Pagerungan Field Development - Natural Gas Processing and Compression Plant – Indonesia• Checking of structural design drawings for buildings, pipe racks and modules• Checking of reinforced concrete design drawings for buildings, sumps and road crossings• Responsible for checking and approving shop detail contractors drawings for entire project and answering detailers queries• Supervision of modification of shop details to suit local (Indonesian) steel size substitution• Answering site construction queries• Preparation of design drawings for redesign of sewage treatment module• Spent 4 weeks at site involved in material controlDhodak Gas/Condensate Plant – Pakistan - Checking of structural design drawingsClough Stena JV - Preparation of structural design drawings for barge deck equipment for anchor and coflexip cable laying
Structural Designer/Checker
Goodwin A Module ConstructionConstruction contractor building Module A (2800t) and Module D (2400 t) for Goodwyn A platform at Jervoise Bay offshore construction site, WA• 2-I-C Drawing Office• Liaison with client (W.O.P.) site representatives to clarify design changes and co-ordinate resolution of engineering queries• Analyse design changes for impact on shop detailing and construction programs, raising of associated engineering queries and variation claims, clash checking of design changes with existing design and as construction situation• Responsible for answering major shop detailing contractor’s queries on design and construction methods, checking plate nesting drawings, clarification of client comments on shop details, approval of timesheets and variation claims. Included 3 months in-house at shop detailer supervising acceleration of drafting program• Responsible for issue of drawing packages to major offsite fabricators, organising revisions to shop drawings to suit fabricators methods and on site requirements, selection of module components suitable for off-site fabrication, answering fabricators queriesMiscellaneous:• Production of paint area manuals and passive fire protection drawings for subcontractors• Checking and approval of vendor drawings for grating and answering supplier’s queries• Redesign of structural details to aid installation• Answering site construction queries• Supervision of drawing office annex
Senior Structural Designer
Goodwyn A Platform Topside DesignMainly involved with the accommodation quarters module and helideckSeconded to Woodside in April 1990 to check and approve construction contractor’s drawings and answer queries
Structural/Civil Draftsman
Design drawings for Channar Iron Ore project at Paraburdoo, WA Design drawings for M.M.M. Mining, Broken Hill, NSW (Mine refit and re-location) Design drawings for Alumina Refinery at Wagerup, WA (Slurry tanks, Agitators, Cranes, Walkways etc) Design drawings for concrete and structural steelwork for Boddington Gold Mine expansion WA
Structural Draftsman
Wesfarmers LPG Process PlantDesign and detail drawings for:• Export wharf facilities• Plant facilities, i.e. Pipe racks, equipment and pipe supports, vessel and general access platforms.• Coordination between piping and vessel sections
Structural Draftsman
Ocean Shipyards Jetty• Design and detail drawings for a new jetty for Ocean Shipyards Pty Ltd at Jervoise Bay in Cockburn Sound.Mt Hawthorn Reservoir Roof• Shop detail drawings for aluminium roof and walls to cover the reservoir, for the Water Authority of WABP Kwinana Refinery• Shop detail drawings for the "C.D.U.2 Debottlenecking" project at the Kwinana RefineryLPG Process Plant• Proposal drawings for export wharf facilities, Cockburn Sound for Wesfarmers Kleenheat GasShip loader• Checking and revising detail and design drawings for a new salt ship loader for Shark Bay Salt Joint Venture
Structural Draftsman
Harriet A Platform Design• Checking and reviewing sub-contractors shop detail drawings for Platform superstructure• Production of non-destructive test traceability drawings for all field welds• Alteration of existing & production of new design drawings• Production of layouts from engineer's sketches and design concepts (Equipment and Structural)• Updating design drawings to "as built" situation• Complete "as built" material take off
Structural Draftsman
Piping MTO Paddington Gold Project
Structural Draftsman
North Rankin A Platform ModificationsProduction of general arrangements, sketches, material take offs and shop details for:• Flare stack support structure pile plugging operations• Pile guide removal proposals for both the F.S.S. and the main jacket• Conductor installation and testing• Insert pile proposal
Site Structural Draftsman
North Rankin A Module Construction• On site at Jervoise Bay (now known as Henderson), work involved the production of detailed construction drawings, as built plans and shop details for the building of eight modules for the North Rankin 'A' Platform. Work also involved preparing hydro test packages and as built piping isometrics• I also took material take offs and made erection sequence drawings for several bids on other projects• During this period I was also engaged as Company photographer for the duration of the module project
Draftsman
Detail drawings for various projects including:• New housing sub-division for East Newman• North West Shelf construction camp, layout of buildings, car parks, roads and caravan park• Structural steel drawings for new buildings and shops
Draftsman
Detail drawings for a foundation block for a generator set for extensions to Mount Newman Power Station
Trainee Draftsman/Draftsman
Traffic Service Division - plotting surveys from surveyor's field books and drafting plans for intersections on major roadsBridge Design Section - Reinforced concrete detailed drawings and bar bending schedules for major highway bridges
Colleagues at Primero Group
Other employees you can reach at primerogroup.com.au. View company contacts for 356 employees →
Cameron Warren
Colleague at Primero GroupPinjarra, Western Australia, Australia
View →
PN
Peter Nolan
Colleague at Primero GroupPerth, Western Australia, Australia
View →
CT
Chris Tan
Colleague at Primero GroupPerth, Western Australia, Australia
View →
RA
Ron Allan Santos
Colleague at Primero GroupPerth, Western Australia, Australia
View →
MJ
Michael Jenkin
Colleague at Primero GroupSingleton, Western Australia, Australia
View →
TZ
Tony Ziegelaar
Colleague at Primero GroupPerth, Western Australia, Australia
View →
MP
Maria Pulcini
Colleague at Primero GroupLaval, Quebec, Canada
View →
AB
Abdrahamane Belem
Colleague at Primero GroupMontreal, Quebec, Canada
View →
GH
Gregory Hocking
Colleague at Primero GroupDoubleview, Western Australia, Australia
View →
JS
Jack Spence
Colleague at Primero GroupAustralia
View →
Frequently asked questions about Alan Kernaghan
Quick answers generated from the profile data available on this page.
What company does Alan Kernaghan work for?
Alan Kernaghan works for Primero Group.
What is Alan Kernaghan's role at Primero Group?
Alan Kernaghan is listed as CIVIL/STRUCTURAL/MECHANICAL CHECKER at Primero Group.
Where is Alan Kernaghan based?
Alan Kernaghan is based in Perth, Western Australia, Australia while working with Primero Group.
What companies has Alan Kernaghan worked for?
Alan Kernaghan has worked for Primero Group, Lycopodium, Dra Global, Primero Group Ltd, and Mintrex - Engineering Professionals.
Who are Alan Kernaghan's colleagues at Primero Group?
Alan Kernaghan's colleagues at Primero Group include Cameron Warren, Peter Nolan, Chris Tan, Ron Allan Santos, and Michael Jenkin.
How can I contact Alan Kernaghan?
You can use AeroLeads to view verified contact signals for Alan Kernaghan at Primero Group, including work email, phone, and LinkedIn data when available.
What skills is Alan Kernaghan known for?
Alan Kernaghan is listed with skills including Steel, Steel Structures, Navisworks, Microstation, Structural Engineering, Autocad, Mineral Processing, and Steel Detailing.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Alan Kernaghan you were looking for.
View similar profiles