Controls Engineer
CurrentTerminal 1 Baggage System Installation and Commissioning: -Verify electrical and mechanical installation of new conveyor implementation and network setup -Test functionality of isolated system elements (HMI/alarm response, unit reactivity, procedure accuracy, etc.) and correct errors using Siemens Step 7 PLC program -Conduct on-site performance testing of pre-start up system and optimize functionality for smooth movement of bags through merges and handoff spacing between beltsTerminal 3 Baggage System Sortation Recontrol: -Developed programs, emulated, and commissioned upgrade of PLC equipment to an existing baggage sortation system from PLC-5 hardware to ControlLogix to increase system performance visibility, improve bag tracking, and achieve line throughput of 1000 bags/hr