Carl A.

Carl A. Email and Phone Number

Engineering Manager @ NMDC Dredging & Marine
Dubai, AE
Carl A.'s Location
Dubai, United Arab Emirates, United Arab Emirates
About Carl A.

Carl is a highly skilled and accomplished civil engineer, who holds a Master's degree in Port and Coastal Engineering, as well as a professional engineering registration with extensive experience in the marine design and construction industry. With a strong technical and practical background, he possesses a remarkable ability to manage complex projects and deliver results with optimal effectiveness, cost, reliability, and safety.His career began as a site engineer on commercial building construction projects, however, with an eye for detail and a passion for excellence, that passion led to the design transition where he focus on nearshore marine infrastructure.He has worked on a range of projects that include offshore pipelines, quay walls, pile-on-deck jetties, seawater intake and outfalls, among others. His expertise in structural design coupled with his practical site experience has allowed him to approach projects with a unique perspective during the execution phase.He is a problem solver and is known for his ability to collaborate effectively with clients, contractors, and stakeholders to ensure the successful completion of projects on time, within budget, and to the highest standards. With an unwavering commitment to excellence, he continues to push the boundaries making a significant impact on the projects involved.

Carl A.'s Current Company Details
NMDC Dredging & Marine

Nmdc Dredging & Marine

View
Engineering Manager
Dubai, AE
Website:
nmdc.com
Employees:
2680
Carl A. Work Experience Details
  • Nmdc Dredging & Marine
    Engineering Manager
    Nmdc Dredging & Marine
    Dubai, Ae
  • Ayesa
    Resident Engineer
    Ayesa Mar 2023 - Present
    Dubai, United Arab Emirates
    Four Season Hotel Marine Works, Oman Omran Group planned a luxury development overlooking the sea of Oman. Part of this development is to upgrade the existing Marina Bander Al Rowdha.l was appointed as the Project Manager during the detailed design of the marine works where I managed the resources, schedule, and budget. During the schematic and detailed design stages, I was responsible for the analysis and design verification of the refurbished Launching/Refuelling quay wall, including the new Promenade marine wall extensions.
  • Ayesa
    Resident Engineer
    Ayesa Feb 2023 - Present
    Dubai, United Arab Emirates
    Marine and Topside Facilities for Jabal Dhana As part of an initiative to develop Abu Dhabi into a global maritime city, Abu Dhabi Ports (the Client) planned to undertake the development of several onshore and maritime facilities across the Emirate of Abu Dhabi. The Jabal Dhanna Marina and Ferry Terminal formed part of this initiative.I was responsible for the schematic design of the temporary Ro-Ro ramp to facilitate the operations during the construction stages. The Ro-Ro ramp consisted of a marine quay (concrete blocks) wall, which was analysed, and the design verification was done using advanced engineering software to optimize the design.
  • Ayesa
    Resident Engineer
    Ayesa Jun 2022 - Oct 2023
    Dubai, United Arab Emirates
    Marsa Al Arab Beach Development Dubail was assigned to the Marsa Al Arab beach development project located in Dubai. ASGC (Client) appointed Ayesa for as the construction supervision consultant for the marine works scope of the project. As such, I was responsible for the following to name a few:• shoring walls (i.e. Diaphragm walls and L-shape concrete crown walls) construction supervision and all document/drawings/material submittal reviews.• Review and monitor contractor’s work progress.• Interface with client and sub-contractor on construction issues
  • Ayesa
    Resident Engineer
    Ayesa Dec 2021 - Oct 2023
    Dubai, United Arab Emirates
    I was assigned to the Natural History Museum project located in the Cultural District Abu Dhabi. As part of the PMC, I was responsible for all marine works site deliverable reviews. In addition to this, is the supervision related to construction of all the marine work structures. To name a few as follows:- Dredging works - Marine pile installation and testing- New quay wall stonebed foundation construction incl, anti-scour rock- New quay wall block construction and installation - Pile on concrete deck structure (precast pile caps, beams and slab with in-situ topping)
  • Ayesa
    Resident Engineer
    Ayesa Aug 2022 - Mar 2023
    Dubai, United Arab Emirates
    Dubai DB 17 Outfall Pipeline Dubail was assigned to the Dubai DB 17 Outfall pipeline located at the Dubai Offshore Sailing Club (DOSC) in Dubai. Dubai Municipality commissioned Dubai Shipbuilding & Engineering (DSBE) to construct the proposed outfall through a Design and Build (D&B) contract. DSBE subsequently appointed Ayesa to complete the detailed design and construction supervision.l was responsible for overseeing all aspects of the HDPE pipeline construction supervision (S-lay float and sink). In addition, I liaised directly with the Coastal Environment Section (CES) of Dubai Municipality to ensure DSBE is fully compliant with the No Objection Certificate (NOC) conditions. This included the submission of the monthly reports to CES.
  • Overseas Ast Co Llc
    Senior Engineer
    Overseas Ast Co Llc Nov 2018 - Aug 2021
    Dubai, United Arab Emirates
    Served as a technical lead/senior engineer for the project/tender to ensure that engineering process and related deliverables are developed for the project in accordance with company requirements. The aim was to deliver safe, on time, on cost, and a quality project. Notable involvement in the following projects and tenders: Layyah Combined Cycle Power Plant extension project. 2019 - 2021The scope cover Intake and Outfall Works consisting of Engineering, Procurement, Construction, Commissioning and Testing including all marine, civil, pipeline and structural works. The project included work packages as follows:• Dredging and disposal• Seawater intake and outfall pipelines with offshore intake heads and diffusers respectively.• Chlorination line• New land reclamation• Shoreline protection consisting of Core-Loc TM units• Temporary cofferdam consisting of secant pilesDubai Marina Vehicular Bridge tender (unsuccessful) | 2019CICPA Al Jazirah Al Hamrah CICPA breakwater and pontoon Facility tender (successful) | 2019Dubai harbor Bay Marina tender (successful) | 2019
  • .
    Family Sabbatical
    . Apr 2017 - Oct 2018
    Russian Federation
    My first child was born, I decided to take a break to be a full time dad to assist my wife in raising our child. This was the most memorable and exciting phase of my life. At the same time I stayed current on industry trends and learning to remain fully prepared for the next new challenge.
  • Penta-Ocean Construction Company Limited
    Senior Design Engineer
    Penta-Ocean Construction Company Limited Aug 2016 - Mar 2017
    Central Singapore
    I was assigned to the design team of the new PT Asahimas Chemical power plant project in Cilegon on Java Indonesia. Penta Ocean was responsible for the detailed design and construction of an offshore jetty, seawater intake and pump station. The design was outsourced to a sub consultant in Singapore. My duties were as follows:• reviewed the intake head structure, offshore GRP seawater intake pipeline and pump station design.• liaised with site on design issues and coordinate with design sub consultants.• managed the design deliverables and issuance thereof to site.
  • Clough Murray & Roberts Marine
    Senior Design Engineer
    Clough Murray & Roberts Marine Mar 2016 - Jun 2016
    Cape Town
    During this period I formed part of the engineering team supporting the Saldanha Liquefied Petroluem Gas (LPG) project. I was tasked with the following temporary works design items:• performed overburden calculations to assess 4m of fill incl. various construction plant impact due to vertical stress on top of an existing Strategic Fuel Fund (SFF) pipeline (1.5m below ground level) • conduct a design verification on existing SFF pipeline.• designed lifting hooks for 22ton concrete blocks, including rigging for the onshore handling and offshore installation thereof.
  • Murray & Roberts Marine
    Senior Design Engineer
    Murray & Roberts Marine Nov 2015 - Apr 2016
    Singapore
    I was seconded to Penta-Ocean Construction Co. by Clough Murray & Roberts Marine. I formed part of the engineering team of Penta-Ocean/Koon Joint Venture (Main Design & Build Contractor), who have been awarded the land preparation works for Singapore Changi Airport Development by The Ministry of Transport. The contract value was approximately S$1,108 million and scheduled for completion by 2020. The project was for 600 ~ 700 hectares of land preparation work for the future expansion of the Airport and extension of existing Runway 3 which will be constructed on 1,080 hectares of reclaimed site. I was responsible for the following:• reviewed designs and drawings from local engineering consultants and subcontractors;• assisted in the design and development schemes of the new Changi bridge; • developed temporary works design concepts to support existing structures;• managed and controlled the civil work design approvals for various authority submissions by engineering consultants.The above responsibilities relate to various areas listed as follows:• Ground Improvement• Airside Services Diversion• Changi Coast Road Diversion• Diversion of Existing Services
  • Murray & Roberts
    Engineering Co-Ordinator Tanjung Bin 4 Cooling Water Intake & Outfall Culverts Project
    Murray & Roberts Oct 2012 - Feb 2015
    Johor, Malaysia
    During this period I was part of the project team to ensure successful execution of the project. I assisted both the site based Project Manager and the head office based Project Engineer by fulfilling the roles and responsibilities as follows:• co-ordinated the design approval submissions by the local 3rd party engineer to local authorities• coordinated with test laboratories with regards to soil sampling tests, material testing, methods and frequencies• assisted and guided site engineers in developing construction method statements and site works procedures synchronized with the design constraints for the different work areas.• managed the implementation and processed results for deep excavation structural monitoring i.e displacements using inclinometer readings from diaphragm and cofferdam wall, strut forces using vibration wire strain gauges.• was actively involved during quality control inspections to offsite structural steel fabrication, i.e gantry girders and built up columns for 50 ton gantry structure and lifting frame for lifting 450ton heavy precast culvert• developed heavy lift plan for lifting the 450 ton precast culverts.• developed procedure for the lifting frame load test of 450 ton heavy precast culvert to DNV standard.• conducted Safe Practice Observation (SPO’s) on site and communicate/create an awareness of “working safe” amongst the project team.
  • Murray & Roberts - Engineered Excellence
    Engineering Co-Ordinator Manjung 4 Cooling Water Intake Project
    Murray & Roberts - Engineered Excellence Oct 2011 - Sep 2012
    Malaysia
    Similar roles and responsibilities as Tanjung Bin 4
  • Murray & Roberts Marine
    Design Engineering Technologist
    Murray & Roberts Marine May 2007 - Sep 2011
    A variety of marine projects worked on, some design only and some on- site support which are as follows:• ADCOP Pipeline Bahrain; Value: AED 66 Million; Location: Fujairah United Arab Emirates • Mosselbay Desalination Plant Pipelines; Value: ZAR 50 Million; Location: South Africa• Vale Malaysia Manufacturing Project MHQ; Value: MYR 48 Million; Location: Malaysia• Barrow Island Gorgon Project Value AUD 115 Million Location AustraliaRoles and responsibilities to above projects as follows:• executed conceptual and detailed design of both permanent works and temporary works• executed engineering and designs in accordance with the specific design criteria, nominated codes and findings and results of specialist studies and model testing.• kept the project team informed on all relevant aspects of technical & engineering issues that arise during the detailed design phase of the project• assisted with engineering input into tenders, proposals and method statements • provided technical direction and assigns work to sub-consultants and draftsmen• planned, scheduled, conducted and coordinated detailed phases of engineering work on the project.• liaised with project field personnel
  • Kfd Wilkinson Consulting Engineers
    Civil Engineering Technician
    Kfd Wilkinson Consulting Engineers May 2005 - Apr 2007
    During this period, I was a part time B-Tech student completing my final year dissertation. I got elementary concrete/steel structural analysis and design exposure during my time in the design office. Preparation of structural layouts and rebar detailing formed part of my daily duties. I was assigned to two projects during this period which are as follows:• The Cape Town International Convention Centre (CTICC) Spearhead Building, which was a new office tower and an extension of the existing CTICC exhibition hall.• The refurbishment of the existing retail and mall areas of The Link building, to the standards of the adjacent Cavendish Square shopping mall, named Cavendish Connect.
  • Murray & Roberts - Engineered Excellence
    Site Engineer
    Murray & Roberts - Engineered Excellence Jan 2004 - Apr 2005
    I commenced employment with Murray & Roberts Construction as a Junior Site Engineer and was assigned to the construction team responsible for converting an 18 story building (63 years old at the time) named Mutual Heights into a loft apartment complex of 178units, with shopping outlets and restaurants in Darling Street, Cape Town South Africa. My roles and responsibilities were as follows:• Set out of works and carried out surveys from engineer’s drawings.• Calculating concrete quantities and placing concrete orders for concrete elements to be cast.• Place reinforcement orders.• Conduct reinforcement inspections as per engineer’s drawings.• Quality control and supervision of works between different building trades.

Carl A. Education Details

Frequently Asked Questions about Carl A.

What company does Carl A. work for?

Carl A. works for Nmdc Dredging & Marine

What is Carl A.'s role at the current company?

Carl A.'s current role is Engineering Manager.

What schools did Carl A. attend?

Carl A. attended Stellenbosch University, Cape Peninsula University Of Technology, Cape Peninsula University Of Technology.

Not the Carl A. you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.