Office Engineer
CurrentProject: Mid-Coast Corridor Transit ProjectMr. Magallon served as an Office Engineer on the $2B Mid-Coast Corridor Transit project, an 11-mile extension to the existing San Diego Trolley system. Mr. Magallon’s responsibilities included preparation of monthly progress payment, development of change orders, response to RFIs and Submittals, prepare and update weekly and monthly reports. Project: Perris Valley LineMr. Magallon served as an Office Engineer on the $150M Perris Valley Line project, a 24-mile extension of the Metrolink 91 Line from Riverside to Perris, California. Project elements included two railroad bridge replacements, upgrade of existing siding tracks, and construction of new track and control points to provide future Metrolink passengers service between Perris and Riverside on the former Burlington Northern Santa Fe (BNSF) San Jacinto Industrial Spur. Mr. Magallon’s responsibilities included claim analysis, developing exhibits used in mediation and assisting with components of the settlement. Preparation of monthly progress payment, development of change orders, and response to RFIs, aided the Resident Engineer with project closeout activities including preparation of change orders, item adjustments, reports, project files review, and as-needed inspection. As an Office Engineer, Mr. Magallon gained a comprehensive understanding of proper documentation desired to contest a claim accurately.