Senior Technician
Edinburgh, United Kingdom
I was employed as a Senior Technician with Jacobs Infrastructure, based in their Edinburgh office's highways team. During my time in this role I served as a coordinator for a small CAD team, meeting with project managers on a weekly basis to maintain a two week program of their CAD requirements, prioritizing this work and then distributing it amongst the team. I worked on the A9 Dualling Scheme, using MX to produce proposed alignments for consideration. I am also producing other drawings that will be included in the report, including drawings showing the existing conditions, existing utilities and accident locations as well as plan and profile drawings showing the proposed design and drawings showing the existing constraints that were to be taken into consideration.I produced mainline alignment drawings for a series of options that were included in the DMRB stage 2 report for the A96 Dualling Scheme, as well as landowner consultation drawings. I also designed road signs for the proposed alignment using KeySign.I have produced planning appliaction drawings for the Elgin Western Link Road project and figures to be included in the A83 Trunk Road Study report as well as a series of drawings showing the departures from standards on the proposed M8/M73/M74 improvements tender. On this project I have also produced drawings showing existing utilities that will be affected by the works and the proposed street lighting and associated ducting.