AeroLeads people directory · profile

Kyle Rolland Email & Phone Number

Senior Engineering Manager at Ediom Pty Ltd
Location: Melbourne, Victoria, Australia 12 work roles 1 school
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Engineering Manager
Location
Melbourne, Victoria, Australia
Company size

Who is Kyle Rolland? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Kyle Rolland is listed as Senior Engineering Manager at Ediom Pty Ltd, a with 40 employees, based in Melbourne, Victoria, Australia. AeroLeads shows a matched LinkedIn profile for Kyle Rolland.

Kyle Rolland previously worked as Senior Design Manager at Symal Group and Design Manager at Symal Group. Kyle Rolland holds Bachelor Of Engineering (Be), Civil Engineering, 2Nd Class First Division Honours from University Of Auckland.

Company email context

Email format at Ediom Pty Ltd

This section adds company-level context without repeating Kyle Rolland's masked contact details.

Ediom Pty Ltd

Review company-level records connected to Kyle Rolland before choosing the right outreach path.

Profile bio

About Kyle Rolland

Kyle Rolland is a Senior Engineering Manager at Ediom Pty Ltd. He possess expertise in structural engineering, civil engineering, structural analysis, contract management, quality assurance and 7 more skills.

Listed skills include Structural Engineering, Civil Engineering, Structural Analysis, Contract Management, and 8 others.

Current workplace

Kyle Rolland's current company

Company context helps verify the profile and gives searchers a useful next step.

Ediom Pty Ltd
Ediom Pty Ltd
Senior Engineering Manager
North Sydney, NSW, AU
Website
Employees
40
AeroLeads page
12 roles

Kyle Rolland work experience

A career timeline built from the work history available for this profile.

Senior Design Manager

Melbourne, Victoria, Australia

Currently working as an Area Engineering Manager as part of the North East Link South Alliance.

Design Manager

Melbourne, Victoria, Australia

Sep 2021 - Jul 2023

Engineering Manager

Auckland, New Zealand

Eastern Busway Stage 2,3, and 4 - Auckland's first urban busway connecting Pakuranga to Botany to enable commuters to travel between Botany and Britomart in under 40 minutes. 5km of dedicated busway. Working as the Engineering Manager for the Eastern Busway Alliance, currently conducting value engineering to achieve the project and funding objectives during the IPAA phase to enter into the PAA and continue with Detailed Design and Construction.https://at.govt.nz/projects-roadworks/ameti-eastern-busway/

Sep 2020 - Aug 2021

Design Coordinator

Melbourne, Victoria, Australia

Tender Design Management:North East Link - Victoria's Biggest Road Transport Project ($12B), 6km twin tunnels with connecting links to the existing ring roads. Major interchanges provided at Manningham Road and Lower Plenty Road.Worked as the Design Manager for the Manningham Road Interchange which included over 600m of cut and cover tunnel up to 35m deep and allowed for access both in and out of the tunnels. Structures, Civil, Surface works, Urban Design, and Motorway Operations. https://northeastlink.vic.gov.au/aboutM6 Stage 1 ($2.5B) - 4km twin tunnels to deliver the missing link (M8 Arncliffe - Kogarah) from Sydneys south to the wider Sydney Motorway Network. Including 3 access structures into the tunnel. https://www.rms.nsw.gov.au/projects/f6/index.htmlWorked as the Design Coordinator for the 400m Cut and Cover structure connecting to President Avenue in the south. Access structures from the RMS depot and the Ancliffe construction yard (previously used by the M8). Structures, Civil, Urban Design, and Motorway Operations.

Oct 2019 - Sep 2020

Design Coordinator

Melbourne, Australia

Design coordinator for the O'Herns Road Upgrade Stage 2 on behalf of MRPV. Downer was awarded a $70 M design and construct contract to provide additional connectivity for future developments in Epping. This included a full diamond interchange with upgrade to the local arterial route. Undertook the management of the detailed design from Tender award with several design partners most notably, Arcadis and CMW as major design partners.

Oct 2018 - Oct 2019

Construction Phase Support (Cps) Manager

Auckland, New Zealand

As the Design Manager for the Construction Phase, I managed the design and construction interface on behalf of the Joint Venture (Fletcher and Acciona) on the $709M (PPP) 18.5km Motorway extension from Puhoi to Warkworth, Auckland New Zealand. https://www.nzta.govt.nz/projects/ara-tuhono-puhoi-to-warkworth/Key Responsibilities:- Design management- Contract variations- Scope creep reduction- Compliance requirements- Key stakeholder relationsCultural Involvement:- JV Culture Committee & Social Club- Wellness Initiatives - Language aid

Feb 2017 - Oct 2018

Design Engineer - Secondment To Well Connected Alliance

Auckland, New Zealand

Waterview Shared Path, September 2015 – June 2016The Waterview shared path is a 2.4km shared path connecting Waterview and Mt Roskill. Lead structural engineer for the Alford Street Bridge ($4 million). A 90m long 3-span, 13m high reinforced concrete bridge with precast pre-stressed super T superstructure. The bridge also had several cultural aspects (Te-aranga principles) incorporated into the design. This role included interdisciplinary co-ordination, stake holder management, and concept design through to detailed design. Waterview Connection, August 2014 – February 2017The Waterview Connection project is one of the most important infrastructure developments ever to take place in New Zealand. Structural engineer who carried out a quality assurance role in the construction phase support team. This role included co-ordinating between the Design and Construction teams for design implementation, verification, modification and value engineering. Compliance with delivery requirements and implementation of appropriate corrective and preventative actions required. This included the Southern Ventilation Building ($20 million) and the Hendon Park Footbridge ($5 million).

Aug 2014 - Feb 2017

Structural Engineer

Auckland, New Zealand

Wairau Stream Footbridge Detail Design, June 2014 – August 2014Wairau footbridge was commissioned to allow pedestrians access across the Milford marina to continue the beautiful coastal walks along the east coast bays of the North Shore, Auckland. This was enabled by a pedestrian draw bridge across the estuary.Structural engineer who carried out modelling of the bridge in Spacegass and designed the concrete piers, deck, abutment, wing walls. This also included the design of the steel/timber members in the draw bridge section.Vanuatu Tourism Infrastructure Project, April 2014 – July 2014This multi-million dollar project involves the upgrade of Port Vila’s seafront. The aim of the project was to boost tourism in Vanuatu. Structural engineer who carried out the detail design of the sheet pile walls, concrete capping beam and concrete deck for the central pier and sea steps along the main seawall.Auckland Transport Asset Management, April 2013 - June 2013This project included management of over 3000 assets on behalf of Auckland Transport. Teams were trained and managed to deliver forward work plan reporting and costing for up to 10 years ahead. Development of inspection and reporting to increase productivity lead to tablet based geo-tagging and reporting.

Apr 2013 - Feb 2017

Civil Engineer

Auckland, New Zealand

Narrowneck Beach Ramp Replacement, August 2012 – October 2013This project involved the replacement of an existing public access/boat ramp on an inner city beach. Works included the construction of a reinforced concrete ramp cast partially in situ and partially precast suspended slabs above the sand. It involved assessing options for the boat ramp structure and progressing through to construction completion.Civil engineer who prepared drawings for resource consent application and tendering, detailed design, construction drawings and construction monitoring.Tuvalu Ship to Shore Project, June 2012 - April 2013This role included concept and detailed design for navigation system through reef system, preparation of tender documents through to contract management including progress payments, construction assistance, and variations orders.Birkenhead Wharf, March 2012 – September 2012The project assessed the current condition of the Birkenhead wharf and repaired the wharf as effectively as possible whilst remaining within the budget allocated. Civil engineer who carried out condition assessments on Birkenhead wharf, carried out visual inspections and preparation of drawings and the preparation of tender and contract documents for repair works, together with wharf plans detailing the location and extent of repairs. Also acted as the MSQA Rep for Auckland Transport during construction. This included site inspections to verify contractor’s work, monitoring of concrete quantities and costs, conduct health and safety audits, issuing minutes of site meetings, and preparing progress payment certificates and variation orders.

Feb 2012 - Apr 2013

Assistant Engineer

Auckland

Civil engineer who assisted in design of cut and cover access ways, structural design, and construction monitoring.

Dec 2010 - Nov 2011

Assistant Engineer

Auckland, New Zealand

Geotechnical engineer who assisted with logging bore hole information to produce geological cross sections, pile driving analysis, slope stability assessments, and retaining wall design.

Nov 2008 - Dec 2009
Team & coworkers

Colleagues at Ediom Pty Ltd

Other employees you can reach at ediom.com.au. View company contacts for 40 employees →

1 education record

Kyle Rolland education

FAQ

Frequently asked questions about Kyle Rolland

Quick answers generated from the profile data available on this page.

What company does Kyle Rolland work for?

Kyle Rolland works for Ediom Pty Ltd.

What is Kyle Rolland's role at Ediom Pty Ltd?

Kyle Rolland is listed as Senior Engineering Manager at Ediom Pty Ltd.

Where is Kyle Rolland based?

Kyle Rolland is based in Melbourne, Victoria, Australia while working with Ediom Pty Ltd.

What companies has Kyle Rolland worked for?

Kyle Rolland has worked for Ediom Pty Ltd, Symal Group, Acciona Geotech, Downer, and Acciona.

Who are Kyle Rolland's colleagues at Ediom Pty Ltd?

Kyle Rolland's colleagues at Ediom Pty Ltd include Nada Ibn Hachmi, Michael Van Doorene, Brandon Chapman, Jamie Threader, and Peter Shanahan.

How can I contact Kyle Rolland?

You can use AeroLeads to view verified contact signals for Kyle Rolland at Ediom Pty Ltd, including work email, phone, and LinkedIn data when available.

What schools did Kyle Rolland attend?

Kyle Rolland holds Bachelor Of Engineering (Be), Civil Engineering, 2Nd Class First Division Honours from University Of Auckland.

What skills is Kyle Rolland known for?

Kyle Rolland is listed with skills including Structural Engineering, Civil Engineering, Structural Analysis, Contract Management, Quality Assurance, Asset Management, Construction Management, and Concrete.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Kyle Rolland you were looking for.

View similar profiles