Paul Way

Paul Way Email and Phone Number

Senior Engineer at Knights Brown @ Knights Brown
ringwood, hampshire, united kingdom
Paul Way's Location
Cardiff, Wales, United Kingdom, United Kingdom
About Paul Way

Experienced Site Engineer with a demonstrated history of working in the construction industry. Skilled in Structural Engineering, Construction, Drainage, Water Resource Management, and Construction Drawings. Strong engineering professional with a Bsc (Hons) focused in Civil Engineering from The University of Glamorgan.

Paul Way's Current Company Details
Knights Brown

Knights Brown

View
Senior Engineer at Knights Brown
ringwood, hampshire, united kingdom
Employees:
158
Paul Way Work Experience Details
  • Knights Brown
    Senior Engineer
    Knights Brown Oct 2019 - Present
    Wales, United Kingdom
  • Walters Group
    Senior Engineer
    Walters Group Jun 2018 - Sep 2022
    Cowbridge, Vale Of Glamorgan, United Kingdom
  • Alun Griffiths (Contractors) Ltd
    Site Engineer
    Alun Griffiths (Contractors) Ltd Jan 2018 - Sep 2022
    Swansea, United Kingdom
  • Dyer And Butler
    Site Engineer
    Dyer And Butler Jan 2016 - Jan 2018
    Barry, Vale Of Glamorgan, United Kingdom
    Drainage, earthworks, soil nails, roads, rc structures.
  • Bell Contracting Limited
    Site Engineer
    Bell Contracting Limited Mar 2015 - Jan 2016
    Newport, United Kingdom
    Drainage, piling, roads
  • Raymond Brown Construction Ltd
    Site Engineer
    Raymond Brown Construction Ltd Sep 2014 - Mar 2015
    Cardiff, United Kingdom
    Flood defence
  • Birkett Lga
    Section Engineer
    Birkett Lga Mar 2013 - Sep 2014
    South Wales, Uk
    Cardiff County Council Framework Agreement contractsI was responsible on all projects for the setting out, staff and subcontractor supervision, liaising and solving of any problems arising, the health and safety on site and the taking off and ordering of plant and materials. Litchfield CourtRemoval of existing hard standings, re-grading of landscaped areas, construction of low retaining walls and two meter high walls, installation of automated vehicular gates, pedestrian gates, footpaths, roads and parking facilities.Radyr Comprehensive SchoolDemolition of existing fire exit on science block, construction of new fire exit involving reinforced concrete stairs, walls and slabs. Improving existing footpaths, installation of drainage channels and landscaping.Warren Evans courtImprovements to rear communal areas including paved areas, installation of storm drainage and landscaping. Improvements to front including paved areas, construction of new roads and parking bays, various duct installation for services and road drainage.Bridgend County Borough Council Contracts Maesteg outdoor marketA £2.5Million project involving the demolition of existing outdoor market area, construction of new market units, improvements to bus station, construction of sandstone performance area, storm and foul water drainage installation, street lighting and Gifas box installation, sandstone and granite cobbled paving.Nolton Street, Rhiw and Elder StreetA £2 million regeneration scheme in Bridgend town centre involving widening of footpaths, a new one way system, installation of storm drainage, retaining walls for new footpaths and landscaping.
  • Andrew Cunningham
    Site Engineer
    Andrew Cunningham Feb 2013 - Mar 2013
    Cardiff, United Kingdom
    Site Engineer on the A48 at Sycamore Cross safety improvement scheme located between Bonvilston and St Nicholas. I am responsible for the following:Supervise construction activities to ensure that work completed has been carried out in accordance with the contract drawings and specification.Setting out of kerb’s, gully’s, ducts and road signs.
  • Avc Energy
    Solar Pv Engineer
    Avc Energy Sep 2011 - Mar 2012
    Various locationsCommunicating with clients, informing them of installation date and checking to ensure scaffolding is in place.Receiving and checking of deliveries.Performing risk assessments prior to commencing work.Reading drawings and specifications for solar PV installation.Installation of solar PV system, adapting and overcoming any problems that may arise.Ensuring that property and surrounding grounds are left in a clean state and that the client is satisfied with the completed work.
  • Akbal Enerji Construction
    Site Engineer
    Akbal Enerji Construction Aug 2005 - Jan 2011
    Turkey
    Checking drawings for construction.Working with architect on construction designs ( Villa and Apartments) and preparing artist impressions.In charge of website, updating information and site progress photographs.Ensuring good communication between British clients and Turkish contractors.Designing Adverts and brochures for Turkish construction companies.Daily checks on various construction projects.
  • Rockall Recruitments
    Civil Engineer
    Rockall Recruitments May 2005 - Aug 2005
    Trago Mills Merthyr Tydfil
    Edmund NuttallSite surveys for existing services, setting up for temporary offices, TBMs, and site access roads.Using GPS to set out major earthworks operations for a large shopping complex.Setting out and locating old shaft entrances and fissures. Maintaining high safety standards, performing cat scans and ensuring that deadlines were kept.Weekly cut and fill level surveys with GPS.
  • Rockall Recruitments
    Civil Engineer
    Rockall Recruitments Apr 2004 - May 2005
    Cardiff
    Edmund NuttallSetting out a concrete slipway, new roads, car parks, landscaping and shore protection.Liaising with the local council for extra works also pre and pro construction checks.Checking existing service drawings, performing CAT scans and issuing permits to excavate.Taking site progress photographs and writing daily diary reports.Producing a project folder with as built drawings, levels and coordinate's for the client.
  • Amec
    Site Engineer
    Amec May 2003 - Apr 2004
    Various
    Amp 2 DCWW - Various locationsSetting out CSO chambers in various locations to improve the storm water quality entering the rivers.Setting up of various large projects including temporary offices and stores, setting up secure site boundaries performing noise monitoring, CAT scans and locating existing services from drawings.Calculating quantities of materials and equipment needed for each project.Checking construction drawings before projects commence and solving problems with the designer.Order machinery, materials and tools when required.Completing weekly progress programme, taking site progress pictures and writing daily diaries of each project.Filling out time sheets for construction workers on each project.
  • Amec
    Site Engineer
    Amec Mar 2002 - May 2003
    Various
    Amp 2 WWTW - Abergavenny and HerefordSetting out and extending WWTW as part of the Amp 2 scheme.Setting up of various large projects including temporary offices and stores, setting up secure site boundaries, performing noise monitoring, CAT scans and locating existing services from drawings.Calculating quantities of materials and equipment needed for each project.Checking construction drawings before projects commence and solving problems with the designer.Order machinery, materials and tools when required.Completing weekly progress programme, taking site progress pictures and writing daily diaries of each project.Filling time sheets for construction workers on each project.Liaising with treatment works operatives ensuring safe environments for tasks to be completed
  • Edmund Nuttall
    Site Engineer
    Edmund Nuttall Jan 2001 - Mar 2002
    Port Talbot
    Setting out of 10.5km of process pipework and liaising with the mechanical contractors.Performing health and safety surveys site wide.Cat scanning, reading existing service drawings and liaising with Shanahan Engineering (designers) for preparing permits to excavate.Setting out for lightening protection.
  • Laing Construction
    Site Engineer
    Laing Construction Jan 1999 - Jan 2001
    Cardiff
    Setting out of concrete structures (SBR Tanks and Outfall). This involved reading both construction and reinforcement drawings, setting out the steel and concrete, performing pre and post concrete checks, measuring quantity of concrete for ordering, performing as built surveys.Weekly monitoring of piezometers and flexible concrete joints on SBR walls.Setting out of draw pits and electrical duct runs. Setting out of kerbs, storm water drainage, tarmac roads and concrete roads.

Paul Way Education Details

Frequently Asked Questions about Paul Way

What company does Paul Way work for?

Paul Way works for Knights Brown

What is Paul Way's role at the current company?

Paul Way's current role is Senior Engineer at Knights Brown.

What schools did Paul Way attend?

Paul Way attended The University Of Glamorgan.

Who are Paul Way's colleagues?

Paul Way's colleagues are Paul Frewin-Smith, Pam Andrews, Meeno Gladus, Ryan Mahoney, Navid Zamani, Oliver Wells, Conall Johnson.

Not the Paul Way you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.