Peter B.

Peter B. Email and Phone Number

Electrical Inspector @ TechSafe Australia
Launceston, TAS, AU
Peter B.'s Location
Launceston, Tasmania, Australia, Australia
About Peter B.

Peter B. is a Electrical Inspector at TechSafe Australia.

Peter B.'s Current Company Details
TechSafe Australia

Techsafe Australia

View
Electrical Inspector
Launceston, TAS, AU
Website:
techsafe.com.au
Employees:
20
Peter B. Work Experience Details
  • Techsafe Australia
    Electrical Inspector
    Techsafe Australia
    Launceston, Tas, Au
  • Technip Energies
    Atex Superintendent
    Technip Energies Jul 2022 - Present
    Israel
  • Baillec Services Int.
    Working Director
    Baillec Services Int. Jul 2017 - Present
    Australia
  • Rio Tinto
    Crew Leader - Carbon
    Rio Tinto Feb 2021 - Jun 2022
    Bell Bay, Tasmania, Australia
  • Tengizchevroil
    Ex Supervisor
    Tengizchevroil Dec 2017 - Jul 2020
    Geoje, Gyeongsangnam-Do, Korea
    Responsibilities:Maintained a high level of safety awareness while meeting Company safety targets for personnel.Provided direction to a multicultural workforce, of 30 company inspectors, coordinators and technical assistants, as well as ensuring contractor compliance with Inspection & Test Plans (ITP).Supervised the initial, detailed inspections against Republic of Kazakhstan/IEC standards series of standards across fabrication yards, providing technical input to resolve project deviations.Reviewed vendor/contractor-submitted documentation including Ex registers, IS/Ex e-Heat dissipation calculations, verification dossiers, termination/connection diagrams, cable schedules, and datasheets.Liaised with engineering teams to ensure corrective actions were in line with engineering expectations/requirements before sub-systems/modules to commissioning handover.Developed and implemented company procedures, inclusive of SOP’s, installation and quality.Achievements:Saved over $1M by identifying efficiency improvements executing the quality assurance activities.Reduced turnaround time from 4+ days down to 1 day, via a streamlined documentation process.Achieved zero lost-time injuries by conducting daily toolbox meetings with the Ex Inspection team to ensure alignment across the team for safety, inspections, technical issues, and progress updates. Delivered 52 modules across the Future Growth Project and Wellhead Pressure Management Project (FGP/WPMP) on time, thereby achieving the KPI schedule.Increased local workforce competence, through individual assessment and training of 30+ staff.
  • Inpex
    Eeha Inspector/Vendor Surveillance
    Inpex Sep 2013 - Nov 2017
    Responsibilities:Provided FAT inspections and acceptance of vendor packages.Operated as the focal point for offshore, hook-up activities, government regulator NOPSEMA (Australian offshore petroleum regulator) standards, and confirming requirements and compliance. Directed the workforce to rectify work on non-compliant equipment at vendor premises and during the construction phase of the project, leveraging the knowledge of all Ex protection techniques. Visually inspected E&I equipment in hazardous areas throughout Oceania/Asia/USA, reviewing vendor-completed E&I checks and ensuring compliance to standards, specifications and procedures.Directed the Korean workforce of 100+ personnel in electrical and instrumentation to rectify work on non-compliant equipment at vendor premises and during the construction phase of the project. Inspected vendor packages according to ITP’s, inclusive of ICSS, process packages, emergency fire fighting packages, F&G and HVAC. Reported defects found during site inspections and compiled site reports for distribution, coordinating corrective/follow up actions, relating to vendor-supplied packages/equipment. Achievements:Maintained zero lost-time injuries by ensuring works carried out complied with company HSE policies and procedures, providing corrective action was taken in unsafe instances and reporting to HSE.Delivered IHUC inspections on-time and according to handover needs of operations. Delivered regulatory documentation to NOPSEMA and DNV on-time as part of operational readiness.Managed handover to operations as part of IHUC to ensure transition from construction to operation.Delivered 45K EEHA inspections across the hull and topsides ensuring on-time completion.On-time delivery of all packages with all defects known and mitigated (punch rectified by the vendor or carried over with minimal re-work required) to ensure timely integration into the overall project.
  • Kellogg Joint Venture - Gorgon
    Eeha Inspector
    Kellogg Joint Venture - Gorgon Sep 2012 - Sep 2013
    Ulsan, South Korea
    Responsibilities:Inspected electrical motors, junction boxes, lights and associated equipment such as glands, blanking plugs, terminals, flame paths, and seals, reporting defects and following up punch closing requirements.Completed 45K EEHA Inspections and delivered 30 modules across the projectDirected how many staff within a Korean-based workforce to rectify work on non-compliant equipment. Achievements:Met compliance with Australian standards across all installations within classified hazardous areas.Maintained zero lost-time injuries by ensuring works carried out complied with company HSE policies and procedures, providing corrective action was taken in unsafe instances and reporting to HSE.Increased local workforce competence, through individual assessment and training of 15+ staff.
  • Downer
    E&I Ha Inspector/Electrician
    Downer Sep 2011 - Jul 2012
    Yolla, Bass Strait
    Responsibilities:Managed allocation of resources and materials within FIFO arrangements and following schedule requirements and reported daily progress reports to the site supervisor.Relocated power, instrumentation, backup power generation during FIFO campaign while working in conjunction with Op’s to ensure production wasn’t affected by tasks being undertaken. Terminated instruments, motors, distribution boards, motor control centre (MCC’s), light and power. Conducted upstream commissioning to site requirements.Installed electrical equipment for new accommodation and compression module, applying a sound understanding of all Ex protection techniques. Commissioned electrical equipment, including point to point/insulation resistance tests, phase rotation, dry loop and function tests. Achievements:Completed the project on time, within 11 months and to the client's satisfaction.Maintained zero lost-time injuries by preparing, obtaining permits and job-specific JHA’s while paying close attention to find defects on all electrical equipment.Met all safety standards and procedures on-site and while in transit via helicopter.
  • Kentz
    E&I Ha Inspector
    Kentz Jan 2010 - Aug 2011
    Karratha, Western Australia
  • O'Donnell Griffin
    Leading Hand Electrician
    O'Donnell Griffin Mar 2008 - Jan 2010
    Karratha, Western Australia
  • Downer Edi Engineering
    Apprentice Electrician
    Downer Edi Engineering Mar 2004 - Mar 2008
    Melbourne Area, Australia

Frequently Asked Questions about Peter B.

What company does Peter B. work for?

Peter B. works for Techsafe Australia

What is Peter B.'s role at the current company?

Peter B.'s current role is Electrical Inspector.

Who are Peter B.'s colleagues?

Peter B.'s colleagues are Nick Foley, Craig C, Angela Wells, Martin Daniel, Luke Nichols, Safeer Ahmed Rind, Techsafe Freelance.

Not the Peter B. you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.