Prashant Wagh
AeroLeads people directory · profile

Prashant Wagh Email & Phone Number

Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion in Court Proceedings at ATTAR
Location: Australia 13 work roles 2 schools
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion in Court Proceedings
Location
Australia
Company size

Who is Prashant Wagh? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Prashant Wagh is listed as Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion in Court Proceedings at ATTAR, a with 50 employees, based in Australia. AeroLeads shows a matched LinkedIn profile for Prashant Wagh.

Prashant Wagh previously worked as Lead Electrical Engineer at Attar and Senior Consultant at Atkinsréalis. Prashant Wagh holds B.E., Electrical from Veermata Jijabai Technological Institute (Vjti).

Company email context

Email format at ATTAR

This section adds company-level context without repeating Prashant Wagh's masked contact details.

ATTAR

Review company-level records connected to Prashant Wagh before choosing the right outreach path.

Profile bio

About Prashant Wagh

A result-driven, committed and articulate Chartered professional engineer practice in electrical Engineeringwith 5 years of hands-on experience in Rolling stock - light rail and heavy rail in manufacturing, mid-lifeupgrade, change control, service fault mitigation, life extension, technical advisory and Independentcertification services; 15 years of solid experience in delivering full life cycle of green and brown fieldindustrial engineering projects in multinational multidisciplinary engineering consultancies such as powerplants, petrochemical plants, oil and gas offshore Rigs, PV Solar power plants, water desalination plants andbuilding services projects; 1 year of hands-on experience in maintenance of automobile manufacturingplant fully automated with Siemens Step-5 PLC; 2 years of hands-on experience in electrical equipment andaccessories installations on building services projects’ construction site.

Current workplace

Prashant Wagh's current company

Company context helps verify the profile and gives searchers a useful next step.

ATTAR
Attar
Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion in Court Proceedings
Australia
Website
Employees
50
AeroLeads page
13 roles

Prashant Wagh work experience

A career timeline built from the work history available for this profile.

Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion In Court Proceedings

Australia

Lead Electrical Engineer

Current

Melbourne, Victoria, Australia

Jan 2024 - Present

Senior Consultant

Melbourne, Victoria, Australia

❖ EMC test report – CRRC SDA1 class diesel locomotive; reviewed the EMC test report in conjunction with applicable national and international standards; indicated short falls and prepared a technical review report for the client.❖ Internal standards’ against EN, AS, RISSB standards - Queensland Rail; reviewed the electrical installation and EMC standards against relevant EN and AS standards, prepared clause-by-clause gap analysis and provided detailed analysis report with options to follow EN or AS standards either partially or fully.❖ Standard’s compliance registers for traction motor cooling fans against EN50155 – Braemec, Downer;Reviewed the means of proof provided by manufacturer for compliance against each clause of the standard, provided guidance for further document requirements for compliance.❖ Independent certification – Metronet Perth; reviewed various train bond system’s means of proof submitted by the train manufacturer Alstom for design and testing stage compliance against relevant EN, ISO and Australian standards per the guidance provided in AS 7501, reviewed various type test specifications, procedures and fitment check lists against relevant standards, indicated shortfalls and provided guidance to ensure compliance with standards’ clauses.❖ Technical advisory – Canberra Light Rail; reviewed various system related design documentation for electrical, electronics, programmable electronics, safety related functions, system functional breakdown and FMECA. Maintained design register and in-out flow of documents from independent certifier.❖ Technical inspection of IEV 100 track maintenance vehicle - VLine; led the condition assessment site inspection activity of the 30-year-old vehicle; identified issues with vehicle bond electrical systems, wiring and lighting, prepared technical report indicating issues related to functioning, safety and provided recommendation for life extension.❖ Proposal/Bid Management – Queensland Rail, MTM, Alstom, VLine

Jul 2021 - Dec 2023

Mechatronics Engineer

Bombardier | Segula Technologies

Melbourne, Victoria, Australia

❖ Implemented drivers’ new prototype seat modification by providing innovative idea; challenged withfinding a solution to take out the wiring loom from Driver’s arm rest, provided solution to split up theconnectors, liaised with vendors, identified type of connector by validating data sheets and specifications,made a new loom with splitted connectors, tested it on new prototype seat successfully, helped installingnew seat on tram by developing an installation document, modified cable database, electrical schematics.❖ Efficiently managed huge package of Vendor Concession Request (VCR) with offshore support; hugevolume of 75 VCRs including correction on 44 MTOs, 59 drawings and Catia 3D model, red-lined all thedocuments with required changes to be done, liaised with vendors, proposed unique documentnumbering idea for handling huge volume of documents in-out to offshore; finally with successfulmodifications of all the documents I brought vendors and procurement team on the same page.❖ Obsolescence management; the vehicle design was 8 years old, various components installed wentobsolete over a period, also changes in regulations like ROHS made suppliers upgrade their products,approved the replacement products by technically evaluating data sheets, specifications and checkingcompliance to fire, rail standards, form, fit and function. Kept track of changes compared to base design.❖ Integration of new system ODAS (Obstacle Detection Assistance System); this system is already up andrunning in other Flexity trams, suggested changes to existing vehicle design and built, interfaced withmechanical engineers, done risk assessment, updated electrical schematics with new design changes,selected new cables and updated cable data base, developed an installation document for production and assisted installation on tram.❖ Instrumentation system fault investigation; conducted inspection and testing on trams in depot, identified faulty components, liaised with vendors.

Nov 2018 - Jun 2021

Deputy Chief Engineer

Mumbai Area, India

Key Achievements: ❖ Field Engineering - Cable trays & conduits sizing and routing in all indoor/outdoor areas in plant, preparing cable schedule, drum schedule.❖ Substation building sizing, HV/MV/LV Electrical panel arrangement and conduit, cable tray routing above and under floor. Provided inputs to civil department.❖ Data sheet / Specifications - Stand alone equipment.❖ Technical Bid Evaluations - Various itemized and bulk Electrical materials.❖ 3D Model - Technical support and presentations.❖ Proposal/Bid Engineering - Quantity estimations.❖ Engineering Layouts - Preparation and checking of 2D layouts for all systems.❖ ISO 9001 Audits - Preparation for audits.

Feb 2016 - May 2018

Chief Engineer

Mumbai Area, India

Key achievements:❖ Acted as a mentor and supported development of experienced staff; mentored senior engineer who was unable to perform cable sizing computations on company’s engineering tool for fast-track project; conducted 1-on-1 meeting with staff, identified lack of knowledge in certain areas of tool, mentored staff for computations and motivation; proactively acted for staff development; increased staff efficiency through personal mentoring and guidance.❖ Saved cost for company through strong interpersonal, presentation skills; HR department was unable to attract required talent; proactively tapped industry connections by having 1-on-1 meetings with talent match, demonstrated company’s’ strength, expansion plans and stability, motivated potential employees to join organization; need for outsourced agency eliminated; saved company cost of $10K.❖ Successfully handled responsibility of checking and signing off critical documentations; checked and approved for design/construction critical documents such as various design calculations, reports and drawings; added value to the project by pointing out incorrect information and design changes required; with attention to details avoided changes resulting during construction phase and huge cost involved.

Jun 2015 - Dec 2015

Senior Engineer

Key achievements:❖ Worked on high rise residential building project; got an understanding of the design principles involved in a high-rise residential building system design.

Feb 2015 - May 2015

Principal Engineer

Mumbai, India

Key achievements:❖ Lead complex Off-shore Oil & Gas project with confidence; Snorre A platform of Statoil due for life extension in North Sea from 2020 to 2040; worked as group lead, designed system for the ATC (automatic tank cleaning) package, studied P&IDs, made electrical block diagram of the systems, did cable selection, liaised with OEM NOV (National Oil well Varco) Aberdeen, approved GA drawings, data sheets and specifications, liaised with offshore team for collecting as built data, Prepared installation report (job cards) for various packages; increased task productivity by working with small team.❖ Successfully handled switchboard modification task with best offshore engineering practice; challenged with dismantling & reinstalling new switchboard; identified technical requirements, contacted various vendors, raised RFQ, technically evaluated documents, liaised with offshore team for as built information, space constraints, path to be followed for moving out dismantled equipment, prepared reports for dismantling; increased task productivity by proactively collecting various inputs.❖ Prepared as-built drawings; Successfully completed a set of as built drawings for British Petroleum offshore platform.

Apr 2012 - Feb 2015

Design Manager

Navi Mumbai, India

Key achievements:❖ Multi-tasking; apart from leading and developing team took active part in system designing of Wartsila LFO/HFO and Gas power generation projects, also acted as a design/peer reviewer and a signing off authority on the other projects’ various technical documentation; need for extra resources eliminated, increased teams’ efficiency, achieved company’s financial goals.❖ Demonstrated strong ability to be persistent and resilient; took leading role in developing automatic cable length calculation program on power generation plants’ 3D model, fixed lot of bugs, made error logs, worked on pilot projects, ensured all the bugs in program are fixed; trained the staff on the same program; saved 60% man-hours used on manual cable length calculation activity on every project, saved company cost of $30K.❖ Developed and built a team strength from five to thirty-two; interviewed and selected engineers for key positions like lead engineers, 3D modelers; acted as a mentor, conducted training sessions, developed team spirit in co-workers; increased company’s revenue.❖ Developed procedures and standards in department; took leading role in developing procedures, way of working standards and getting electrical department ready for facing external ISO audits; made presentations and trained staff in following new way of working, ISO requirements; improved company’s working standards and staff efficiency.❖ Field engineering; planned and designed cable conduits & trays in substation and other indoor-outdoor areas in power generation plants; developed 3D model, prepared 2D layouts, MTOs, cable schedule, cable tray/conduits filling percentage document; added value by providing innovative solutions.

Dec 2005 - Mar 2012

Electrical Project Engineer

Mumbai, Maharashtra, India

Key achievements:❖ Demonstrated strong ability to sustain work pressure; being a small organisation multitasking and working on various projects/tasks simultaneously was inevitable; handled all the basic and detailed design related activities as well as interdisciplinary, site and customer co-ordination effectively; need for extra resources eliminated, achieved company’s financial goals.❖ Demonstrated time management skills; handled number of projects/tasks independently at the same time and ensured on-time delivery of every project and activity with required quality; ensured on-time deliveries and quality of delivery.

Apr 2003 - Dec 2005

Electrical Maintenance Engineer

Mumbai, Maharashtra, India

Key achievements:❖ Demonstrated fast learning skills; being new in automobile manufacturing field gone through various trainings, on my own initiative; went through plant design manuals and maintenance procedures; attended courses on PLC control logic; gained enough knowledge to support team; saved time for training and development.❖ Demonstrated can do attitude and independence; attended break downs in Siemens Step-5 PLC automated environment independently; independently resolved vehicle number punching machine breakdown, thereby positively surprised and proved my abilities to the team members and managers; added value to the team.

Mar 2002 - Mar 2003

Electrical Project Engineer

Mumbai, Maharashtra, India

Key achievements:❖ Demonstrated fast learning skills; as a fresh engineer proactively involved myself into every possible activity to shorten the learning curve; learnt about the electrical equipment, cables installation, testing and commissioning activities quickly; developed rapport with customer; saved time for training and development.❖ Demonstrated HSE awareness; Worked on active building construction slab daily to install lighting & power conduits concealed in slab, achieved zero accidents goal continuously for one year; successfully achieved company’s set HSE goals.

Apr 2001 - Feb 2002

Electrical Project Engineer

Mumbai, Maharashtra, India

Key achievements:❖ Demonstrated fast learning skills; as a fresh engineer proactively involved myself into every possible activity to shorten the learning curve; learnt about the electrical equipment, cables installation, testing and commissioning activities quickly; developed rapport with customer; saved time for training and development.❖ Demonstrated HSE awareness; Worked on active building construction slab daily to install lighting & power conduits concealed in slab, achieved zero accidents goal continuously for one year; successfully achieved company’s set HSE goals.

Dec 1999 - Mar 2001
Team & coworkers

Colleagues at ATTAR

Other employees you can reach at attar.com.au. View company contacts for 50 employees →

2 education records

Prashant Wagh education

FAQ

Frequently asked questions about Prashant Wagh

Quick answers generated from the profile data available on this page.

What company does Prashant Wagh work for?

Prashant Wagh works for ATTAR.

What is Prashant Wagh's role at ATTAR?

Prashant Wagh is listed as Lead Electrical Engineer | Forensic Fire Investigator | Expert Opinion in Court Proceedings at ATTAR.

Where is Prashant Wagh based?

Prashant Wagh is based in Australia while working with ATTAR.

What companies has Prashant Wagh worked for?

Prashant Wagh has worked for Attar, Atkinsréalis, Bombardier | Segula Technologies, Tecnimont, and Abengoa.

Who are Prashant Wagh's colleagues at ATTAR?

Prashant Wagh's colleagues at ATTAR include Rohan Byrnes, Jon Fedje, Alan Guo, Daniel King, and Mark Welland.

How can I contact Prashant Wagh?

You can use AeroLeads to view verified contact signals for Prashant Wagh at ATTAR, including work email, phone, and LinkedIn data when available.

What schools did Prashant Wagh attend?

Prashant Wagh holds B.E., Electrical from Veermata Jijabai Technological Institute (Vjti).

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Prashant Wagh you were looking for.

View similar profiles