Communication System Engineer
Stantec Consulting, Inc.
Dallas/Fort Worth Area
Responsibilities included design of Dallas Area Rapid Transit (DART) Phase II communication system requirements (expansion to Irving, Carrolton and Rowlett). Also, assisted engineering to create installation packages and review contractor submitted documentation. Products and experience include Penta Non-Blocking Audio Switch, Emergency Telephones, Fire/Intrusion Alarming, CCTV, PA/VMB, OC-12 UPSR Ring (Cisco 15454), Tellabs Channel Bank, Best Power UPS Systems, Black Diamond Extreme Switch, Allen Bradley RTU, SCADA, Outside Plant cable/conduit installation and Inside Plant standards compliance. Instrumental in saving DART approximately $1.5 Million for their Phase II design by reducing physical plant requirements.Note: ACEX was purchased by Stantec in 2006.