Assistant Resident Engineer
W A Fairhurst & Partners
Dunfermline
Assistant Resident Engineer on major infrastructure works for Dunfermline Eastern Expansion (DEX) project comprising distributor roads, sewers, multi-utility services and sustainable urban drainage systems (SUDS) for residential (>3500 houses), retail (superstore and district centre) and leisure facilities (cinema, sports club, restaurants, etc.). Duties included site inspections, agreeing measurement, liaising with Project Manager/Clients, contractors, public utilities and local… Show more Assistant Resident Engineer on major infrastructure works for Dunfermline Eastern Expansion (DEX) project comprising distributor roads, sewers, multi-utility services and sustainable urban drainage systems (SUDS) for residential (>3500 houses), retail (superstore and district centre) and leisure facilities (cinema, sports club, restaurants, etc.). Duties included site inspections, agreeing measurement, liaising with Project Manager/Clients, contractors, public utilities and local authorities, attending design team and progress meetings.The scheme was split into the following contracts some of which ran concurrently:East/West Distributor Road: Approximate cost: £1.6 millionTrunk Sewer including the construction of earthworks for the North/South Distributor Road. Approximate cost: £1.4 million.Aberdour Road Upgrading: Realignment and upgrading of existing distributor road which crossed the development area. Approximate cost: £0.8 million.North/South Distributor Road and Leisure Site: Supervision of the construction of a dual carriageway access into the development and bulk earthworks operation, including the removal of an old rubbish tip, to provide a level site for a proposed leisure park. Approximate cost: £3.9 million.Multi Utility Installation: Design co-ordination and site supervision of multi-utility service installation by Scottish Power consisting of electricity, gas and telecommunications infrastructure and liaison with East of Scotland Water regarding the installation of the water mains. These works also included the co-ordination and provision of the major services to the proposed Hyundai semi-conductor site located within the development area. Approximate cost: £250,000. Show less