AeroLeads people directory · profile

Scott Edwards Email & Phone Number

Superintendent at John Holland
Location: Greater Brisbane Area, Australia, Australia 31 work roles
1 work email found @johnholland.com.au LinkedIn matched
✓ Verified Jun 2026 3 data sources Profile completeness 86%

Contact Signals · 1 work email

Work email s****@johnholland.com.au
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Superintendent
Location
Greater Brisbane Area, Australia, Australia
Company size

Who is Scott Edwards? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Scott Edwards is listed as Superintendent at John Holland, a company with 4597 employees, based in Greater Brisbane Area, Australia, Australia. AeroLeads shows a work email signal at johnholland.com.au and a matched LinkedIn profile for Scott Edwards.

Scott Edwards previously worked as Structures Supervisor at John Holland and Facilities Superintendent at John Holland.

Company email context

Email format at John Holland

This section adds company-level context without repeating Scott Edwards's masked contact details.

{first}.{last}@johnholland.com.au
89% confidence

AeroLeads found 1 current-domain work email signal for Scott Edwards. Compare company email patterns before reaching out.

Profile bio

About Scott Edwards

Scott Edwards is a Superintendent at John Holland. He possess expertise in highways, workplace safety, supervisory skills, project planning, railway and 19 more skills.

Listed skills include Highways, Workplace Safety, Supervisory Skills, Project Planning, and 20 others.

Current workplace

Scott Edwards's current company

Company context helps verify the profile and gives searchers a useful next step.

John Holland
John Holland
Superintendent
melbourne, victoria, australia
Employees
4597
AeroLeads page
31 roles

Scott Edwards work experience

A career timeline built from the work history available for this profile.

Superintendent

Current

Gold Coast Light Rail Stage 3 (GCLR3)

Oct 2022 - Present

Structures Supervisor

N2NS Inland Rail Moree NSW

Mar 2021 - Oct 2022

Superintendent

Gold Coast Seaway

Feb 2019 - Mar 2021

Facilities Superintendent

Broken Hill Pipeline

Mar 2018 - Feb 2019

Superintendent

Parkes Water And Sewage Treatment Plants

Aug 2017 - Mar 2018

Supervisor

Parkes Sewage Treatment Plant & Water Treatment Plant

Currently involved with the set up and mobilisation of both the STP and WTP sites in Parkes (NSW)

Jan 2016 - Jul 2017

Structures Supervisor

Yeppen South Project Rockhampton

I was responsible for the construction of 36 infill slabs and 10 expansion joints on Bridge 1 which is 1,600m in length. As well as the construction of 164 infill kerbs, finishing works, patching of the external faces. I also looked after Bridge 2 which was 600m in length and consisted of 11 infill slabs, 4 expansion joints, 60 infill kerbs and the.

Dec 2014 - Dec 2015

Precast Fitout Supervisor

Yeppen South Project Rockhampton

I was responsible for for external kerb formwork fit out and finishing works of the precast girders fabricated on site to within The Department of Transport & Main Roads specifications.

Aug 2014 - Dec 2015

Barge And Concrete Supervisor

Aplng Jetty Gladstone

APLNG Jetty GladstoneI am responsible for the operation of the barge and overseeing all of the concrete works for the Dolphins. This includes looking after the sub contract steel fixers. The scope of works covers the construction of 6 Mooring Dolphins and 4 Berthing Dolphins. On average each dolphin consisting of 40 tonne of reinforcement and up to 250m3.

Sep 2013 - Jul 2014

Supervisor

Qclng Jetty

QCLNG Jetty GladstoneI was responsible for overseeing all of the concrete works for the Jetty. This includes looking after the sub contract steel fixers. The scope of works covers the construction of 6 Mooring Dolphins and 4 Berthing Dolphins. On average each dolphin consisting of 40 tonne of reinforcement and up to 250m3 of concrete. As well as the.

Aug 2012 - Sep 2013

Night Shift Supervisor

Qclng MOF Gladstone

QCLNG MOF GladstoneI was responsible for overseeing all of the night shift activities being undertaken on the project. I am responsible for the safety of the crew as well as the production being undertaken at night. The works being undertaken are driving 1200mm diameter clutched piles. The fly drilling of these piles, installation and back fill of the tie.

Sep 2011 - Jul 2012

Quality Assurance Specialist / Senior Supervisor

BJC Precast Yard Rayong Thailand

BJC Precast Yard Rayong THAILANDI was sent to Thailand as part of the Cape Lambert Jetty works project to look at the precast concrete deck units being cast in Rayong Thailand. My role was to check that all the QA was in place and that the deck units were being cast as per specification.

Jun 2011 - Aug 2011

Supervisor

Sth Caboolture STP

Sth Caboolture STPI was responsible for the construction of the largest structure on site, the new SBR Tanks 3 & 4, as well as the RAS, WAS pumping stations and blower slabs. These works were all self performed by a direct labour crew reporting to myself. At the same time I was responsible for monitoring and supervising the mechanical and electrical trades.

Jul 2010 - May 2011

Supervisor

Head Office

Mera Alliance During this period I assisted the Procurement Team in the tendering process and resource procurement

May 2010 - Jul 2010

Supervisor

Airport Link Toombul Brisbane

Airport Link Toombul BrisbaneResponsible for supervising the subcontractor working on the excavation and preparation of the vent station building and ensuring they were following all procedures and working safely

Feb 2010 - May 2010

Supervisor

Horizon Alliance Brisbane

Horizon Alliance BrisbaneResponsible for the civil construction of one dual carriage rail bridge over two roads, one dual carriageway bridge and a pedestrian walkway over a creek. I supervised all trades including form workers, steel fixers and concreters together with direct labour ensuring that all three bridges were completed on time.

Aug 2009 - Feb 2010

Supervisor

Murrumba Alliance WWTP Upgrade

Murrumba Alliance WWTP UpgradeResponsible for the civil construction of the largest concrete structure onsite (the bioreactor). This structure was approx. 9000 m2 with over 50 internal walls at a height of 6.7m. The structure also contained coping level slabs on top of the wall varying from 1800mm wide to 2100mm wide. I was also responsible for part of the.

Feb 2008 - Aug 2009

Supervisor - Concrete

BWEA Wynnum MFRO

BWEA Wynnum MFROThe MF/RO plant is a 4.5ML/day plant producing water for Caltex. I was responsible for all civil structures onsite including the main building, to house the MF/RO units, chemical dosing skids, a 5Ml concrete storage tank, waste and neutralization pit and all other ancillary slabs for various pieces of mechanical equipment.

May 2007 - Feb 2008

Supervisor - Concrete

BWEA Wynnum WWTP Upgrade

BWEA Wynnum WWTP UpgradeThe WWTP Upgrade included a number of large concrete structures including the bioreactor, which was 125m long x 17m wide x 4.8m high. The structure was tied together using a number of precast coping beams. I was also responsible for the construction of the RAS pumps station and the combined service water/UV structure, which was one.

Mar 2006 - May 2007

Supervisor - Concrete

Bwea Sandgate Wwtp Upgrade

BWEA Sandgate WWTP UpgradeI was responsible for the work including the installation of a world first in the form of SCOOTA (Sandgate Circular Outside Oxidation Tank Arrangement). A combined biosolids handling/blower building was built to reduce the plant’s footprint and eliminate odour impact by providing an enclosed loading area for the removal of.

Nov 2003 - Mar 2006

Supervisor

Bayview Noosa Resort Project

Bayview Noosa Resort ProjectThis project included various buildings including eight houses, 23 villas, 20 accommodation blocks of 4.5 star suites, maids rooms, function areas, lobby, administration, shops, bars kitchen and a 105 square meter entrance way. Additional construction included pools, paths, buggy ways, civil infrastructure works and landscaping..

May 2003 - Nov 2003

Supervisor

John Holland Depot Sumner Park

John Holland Depot Sumner ParkResponsible for the refurbishment of site containers. I also helped with the up keep of the John Holland Store at Sumner Park.

Oct 2002 - May 2003

Concrete Supervisor

Sandgate WWTP New Inlet Works

Sandgate WWTP New Inlet WorksDetailed design, construct and commissioning of the new inlet works and associated pipe reticulation, which serves part of the Northern Suburbs of Brisbane. Effluent water treated by this plant is discharged to Cabbage Tree Creek, which flows into Bramble Bay. I was responsible for all concrete works on the project with the.

Jan 2002 - Oct 2002

Trainee Supervisor

Cleveland WWTP

Cleveland WWTPCivil, structural, mechanical, building and electrical works for the construction and commissioning of a complete wastewater treatment plant. Includes intake structure, two clarifiers, oxidation ditch, chlorine dosing, press filter, alum dosing, and control room, switch room. Works included approximately 5000m3 of concrete.

Oct 2001 - Jan 2002

Leading Hand Carpenter

Dalrymple Bay Coal Terminal

Dalrymple Bay Coal terminalWorks included earthworks, drainage, roadwork’s, 8000m3 of concrete works, water supply and electrical installation for the onshore civil component of the widening of Bund 1, installation of a new stacking machine on Bund 1, installation of new yard conveyors, additional hoppers to the rail receipt, upgrades to the unloading.

May 2001 - Oct 2001

Leading Hand Carpenter

Luggage Point WWTP

Luggage Point WWTPWorks included the design and construction of a water reclamation treatment plant to treat secondary effluent from the luggage point WWTP and a pipeline to convey reclaimed (treated) water to the BP Oil installation at Bulwer Island. As well as this the upgrade of the existing plant including the installation of precast baffle walls new.

Nov 1999 - May 2001

Carpenter/Formsetter

Pacific Motorway Package 6 Nerang

Pacific Motorway Package 6 NerangThe project works included considerable alterations in the vertical alignment of the existing highway allowing the creation of 2 grade separated interchanges along with the addition of a third lane in both directions. These works were completed without disruption to the existing highway traffic as well as maintaining.

Nov 1997 - Nov 1999

Carpenter / Formsetter

Brinsmead To Redlinch Bypass Cairns

Brinsmead to Redlinch Bypass CairnsWorks comprised the construction of prestressed road bridges including 6 x 20m span 9.84m wide carriageways over Freshwater Creek. 4 x 25m spans over Redlynch Rail/Road Overpass. Construction also included 3 x 11m span steel deck Cane Tramway bridges over Freshwater Creek

Aug 1997 - Nov 1997

Carpenter / Formsetter

Ensham Mine Emerald

Ensham Mine EmeraldWorked on a 2000T steelwork project involving detailed supply, fabrication, protective coating and erection of materials together with the installation of mechanical items supplied by the client. Additional works included coal receipt, crushing, sizing, stockpiling, recovery, sampling and trainload out areas.

Apr 1997 - Aug 1997

Carpenter / Formsetter

East End Mine Mt Larcom

East End Mine Mt LarcomWorks included construction of a 2-story control building, crusher building and reclaim tunnel with over 3300m3 of concrete and 474T of reinforcement.

Oct 1996 - Apr 1997

Carpenter / Formsetter

Boyne Island Smelter Expansion

Boyne Island Smelter ExpansionStarted with John Holland as a tradesman Carpenter / Formworker on the Cast house as well as worked on the GIS building and the Anode Bake building.

Mar 1996 - Oct 1996
Team & coworkers

Colleagues at John Holland

Other employees you can reach at johnholland.com.au. View company contacts for 4597 employees →

FAQ

Frequently asked questions about Scott Edwards

Quick answers generated from the profile data available on this page.

What company does Scott Edwards work for?

Scott Edwards works for John Holland.

What is Scott Edwards's role at John Holland?

Scott Edwards is listed as Superintendent at John Holland.

What is Scott Edwards's email address?

AeroLeads has found 1 work email signal at @johnholland.com.au for Scott Edwards at John Holland.

Where is Scott Edwards based?

Scott Edwards is based in Greater Brisbane Area, Australia, Australia while working with John Holland.

What companies has Scott Edwards worked for?

Scott Edwards has worked for John Holland.

Who are Scott Edwards's colleagues at John Holland?

Scott Edwards's colleagues at John Holland include Brian Cho, Martin Holland, Nathan Duncan, Anei Dut, and Mustafa Sezgin.

How can I contact Scott Edwards?

You can use AeroLeads to view verified contact signals for Scott Edwards at John Holland, including work email, phone, and LinkedIn data when available.

What skills is Scott Edwards known for?

Scott Edwards is listed with skills including Highways, Workplace Safety, Supervisory Skills, Project Planning, Railway, Pipelines, Process Scheduler, and First Aid.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Scott Edwards you were looking for.

View similar profiles